Preliminary Construction Sequence Sample Clauses

Preliminary Construction Sequence. The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design.
AutoNDA by SimpleDocs
Preliminary Construction Sequence. The Engineer shall prepare preliminary construction sequence layouts in conjunction with the geometric design schematic depicting the phasing and traffic detours anticipated to safely convey traffic. The layouts must demonstrate that adequate horizontal and vertical alignments are maintained, sufficient lane widths and shoulder widths or barrier offsets are feasible, and construction zones are adequate for constructability of all proposed features. Proposed construction detours must ensure that adequate superelevation is provided. The layouts must indicate how existing pedestrian and bicycle facilities are accommodated for each phase.
Preliminary Construction Sequence. The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design.
Preliminary Construction Sequence. The Engineer shall evaluate and document the requirements for construction staging and traffic control throughout the development of schematic design to ensure that the proposed design can be constructed. The Engineer shall prepare preliminary construction sequence roll plots in conjunction with the geometric design schematic depicting the phasing and traffic detours anticipated to safely convey traffic. The roll plots must demonstrate that adequate horizontal and vertical alignments are maintained, sufficient lane widths and shoulder widths or barrier offsets are feasible, and construction zones are adequate for constructability of all proposed features. Proposed construction detours must ensure that adequate superelevation is provided. The layouts must indicate how existing pedestrian and bicycle facilities are accommodated for each phase.
Preliminary Construction Sequence. The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design. The Engineer shall consider the requirements for construction and traffic control throughout the development of schematic design to ensure that the proposed design can be constructed. The construction sequencing plan will be coordinated with the proposed paving, drainage, and existing and proposed utility locations, structures, signalized intersections, pedestrian pathways and sidewalks. The Engineer shall submit the preliminary construction sequencing plan to the State for review and approval. Up to two alternate sequencing plans/phasing layouts will be prepared for consideration and final determination by the State which alternate to incorporate into the plans.
Preliminary Construction Sequence. The Engineer shall prepare two (2) Preliminary Construction Sequence Layouts in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated for both the Conventional Traffic Control and Traffic Handling method and the Pavement Salvaging Traffic Control and Traffic Handling method to construct the proposed design. The approved Construction Sequence will be provided as part of the PS&E.

Related to Preliminary Construction Sequence

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on the first day of the thirteenth (13th) month after the home purchase.

  • Completion of Construction Within 60 days of the completion of construction of the Project, Project Owner shall deliver to DoD copies of the FAA form 7460-2 for each ASN, including the final coordinates for each turbine erected.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.