Preliminary Engineering Analyses and Report Preparation Sample Clauses

Preliminary Engineering Analyses and Report Preparation. Based on results of our review of as-built data, and available reports, we will perform preliminary geotechnical engineering analyses. Preliminary geotechnical findings and design parameters will be evaluated and provided. Also included will be discussions about alignment/site geology, subsurface conditions, faulting and seismicity, liquefaction potential and corrosion potential. Conceptual recommendations will also be provided for earthwork and grading, discussions of embankment fill induced settlement, roadway structural sections/pavement design, excavations, slope stability, lateral earth pressures, rippability evaluation, material specifications, material sources and disposal. Geotechnical recommendations will be provided for preliminary design of bridges, retaining walls, soil nail and/or tie- back walls, sound walls, drainage improvements and proposed culverts. The preliminary reports will be prepared by a California licensed Geotechnical Engineer (GE) and a Certified Engineering Geologist (CEG) and will include the following:
AutoNDA by SimpleDocs

Related to Preliminary Engineering Analyses and Report Preparation

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Preliminary Examination 2.22.1 The Procuring entity will examine the tenders to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the tenders are generally in order.

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Evaluation Reports Where a formal evaluation of an employee's performance is carried out, the employee shall be provided with a copy to read and review. Provision shall be made on the evaluation form for an employee to sign it. The form shall provide for the employee's signature in two (2) places, one indicating that the employee has read and accepts the evaluation, and the other indicating that the employee disagrees with the evaluation. The employee shall sign in one of the places provided within seven (7) calendar days. No employee may initiate a grievance regarding the contents of an evaluation report unless the signature indicates disagreement with the evaluation. The employee shall receive a copy of the evaluation report at the time of signing. An evaluation report shall not be changed after an employee has signed it, without the knowledge of the employee, and any such changes shall be subject to the grievance procedure.

  • Project Reports; Completion Report 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report.

  • No Reverse Engineering You may not, and you agree not to or enable others to, copy (except as expressly permitted by this License or by the Usage Rules if they are applicable to you), decompile, reverse engineer, disassemble, attempt to derive the source code of, decrypt, modify, or create derivative works of the Apple Software or any services provided by the Apple Software, or any part thereof (except as and only to the extent any foregoing restriction is prohibited by applicable law or to the extent as may be permitted by the licensing terms governing use of open-sourced components included with the Apple Software).

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.

Time is Money Join Law Insider Premium to draft better contracts faster.