PRELIMINARY PROJECT Sample Clauses

PRELIMINARY PROJECT. IMPLEMENTATION SCHEDULE Contractor shall perform the Services according to the terms and provisions of the preliminary schedule set out in the attached Exhibit A-2, entitled "Preliminary Project Implementation Schedule." Time is expressly made of the essence with respect to each and every term and provision of this Agreement.
AutoNDA by SimpleDocs
PRELIMINARY PROJECT. Cost The total estimated cost of all project development, including design, construction, and other associated costs which will be established prior to the commencement of design.
PRELIMINARY PROJECT. Preliminary Architectural Design With the results of this visit and the Basic Studies that the CONCESSIONAIRE must carry out, it shall prepare the preliminary architectural project based on the environments detailed in Annex 11 and the applicable regulations in force in the sector. The conception of the buildings and exterior spaces must consider and foresee: adequate bioclimatic conditions, the urban context, structural and functional relevance, characteristics of access to basic services and others that allow the best solution for the habitability of the projected buildings. All proposed systems must be feasible to build, show technological validity and be sustainable over time. The volumetric relationships, height of the buildings, elevations and facades, functional relationship, circulation and user flows, materiality, particular internal and external security, among others, must be evaluated and proposed by the CONCESSIONAIRE. The site proposal, spatial and architectural proposal, as well as the materiality proposal, must correspond to the bioclimatic zone in which the land is located. Likewise, the passive architectural design must be considered in order to achieve the comfort standards inside the spaces. The preliminary architectural design will contain the general geometric pre-dimensioning of the structure, and the geometry of the structural elements (plates, columns, grounds, stairs, etc.) must be represented on the basis of the pre-dimensioning proposed. The preliminary architectural design shall be developed in Mod BIM - AR LOD 200. It will contain the following documents General Descriptive Memory of the Preliminary architectural project. Table of areas of the preliminary project. Preliminary Project Drawings. Localization and Location Map according to the current standard in scale 1:500, 1:10,000, as appropriate. (paragraph 64.2 of the Regulation of Law NO. 27157). General Distribution Plan (all floors) at a scale of 1:100, as appropriate, all rooms must indicate their respective areas. Cuts and Elevations at 1:100 scale (minimum 02 longitudinal cuts and 02 transversal cuts and the corresponding elevations). Plan with verification of measurements (overlapping of plans) between the registered perimeter and the topographic perimeter of the property, including UTM coordinates and orientation, duly commented on whether or not there are discrepancies between perimetric measurements or boundaries.
PRELIMINARY PROJECT. IMPLEMENTATION SCHEDULE Implementation of this project will proceed in accordance with this Preliminary Project Implementation Schedule set forth below, except as may be modified into a Final Project Implementation Schedule that is approved by the City. The Final Project Implementation Schedule will become the governing project schedule incorporated into the Agreement. The Project Implementation Schedule is based upon work being accomplished Monday through Friday during normal business hours (defined as 8:00 AM to 5:00 PM), with the exception of City holidays. However, the Contractor may work on extended hours and weekends with prior authorization from the City at no additional cost to the City. Task Deliverable Del # Estimated Start Date Estimated End Date Task 1 (Project Management) Kick-off meeting 1001 Sept 6, 2017 Sept 6, 2017 Monthly status reports/meeting minutes #1 1002 Sept 6, 2017 Oct 6, 2017 Task 2 & Task 1 (Design Services & Project Management) Area and Intersection Analysis Report (Xxxxx Road) 1003 Sept 6, 2017 Oct 6, 2017 Area and Intersection Analysis Report (Saratoga Ave) 1004 Sept 6, 2017 Oct 6, 2017 Monthly status reports/meeting minutes #2 1005 Oct 9, 2017 Nov 6, 2017 Task 3 & Task 1 (Design Support & Project Management) Draft Design and Implementation Plan 1006 Sept 6, 2017 Oct 6, 2017 Final Design and Implementation Plan 1007 Oct 9, 2017 Oct 20, 2017 Monthly status reports/meeting minutes #3 1008 Nov 6, 2017 Dec 6, 2017 Task 4 & Task 1 (Initial System Implementation & Project Management) Configuration of Non-Field Equipment (Saratoga Ave) 1009 Nov 6, 2017 Dec 6, 2017 Configuration of Non-Field Equipment (Xxxxx Xx) 1010 Nov 6, 2017 Dec 6, 2017 Monthly status reports/meeting minutes #4 1011 Dec 6, 2017 Jan 8, 2018 Task 5 & Task 1 (Before-and-After Study & Project Management) Before-and-After Study Report & PowerPoint Presentation (Saratoga Ave) 1012 Feb 20, 2018 May 21, 2018 Before-and-After Study Report & PowerPoint Presentation (Xxxxx Xx) 1013 Feb 20, 2018 May 21, 2018 Monthly status reports/meeting minutes #5 1014 Jan 8, 2018 Feb 6, 2018 Task 6 & Task 1 (Field Deployment & Project Management) Field Deployment & Validated/Optimized ATCS (Saratoga Ave) 1015 Nov 6, 2017 Jan 8, 2018 Field Deployment & Validated/Optimized ATCS (Xxxxx Xx) 1016 Nov 6, 2017 Jan 8, 2018 Kadence/KITS Software Licenses (Saratoga Ave) 1017 Nov 6, 2017 Jan 8, 2018 Kadence/KITS Software Licenses (Xxxxx Xx) 1018 Nov 6, 2017 Jan 8, 2018 Monthly status reports/meeting...
PRELIMINARY PROJECT. The set of documents which provide the general idea of the Work Project according to the conditions established in the architecture program, the land and environment characteristics, and the regulations to abide by. TERMS AND CONDITIONS. Document that has the concepts, requisites and administrative procedures, under which this lease contract was awarded pursuant to the International Public Tender Nº 04/2006. SPACES FOR THE PROVISION OF COMMERCIAL SERVICES. Those square meters that within the "LEASED ASSET" may be commercialized by “THE LESSEE".
PRELIMINARY PROJECT. IMPLEMENTATION
PRELIMINARY PROJECT. IMPLEMENTATION SCHEDULE Implementation of this project will proceed in accordance with this Preliminary Project Implementation Schedule set forth below, except as may be modified into a Final Project Implementation Schedule that is approved by the City. The Final Project Implementation Schedule will become the governing project schedule incorporated into the Agreement. The Project Implementation Schedule is based upon work being accomplished Monday through Friday during normal business hours (defined as 8:00 AM to 5:00 PM), with the exception of City holidays. However, the Contractor may work on extended hours and weekends with prior authorization from the City at no additional cost to the City. Task Deliverable Estimated Start Date Estimated End Date Task 1 (Configure and Tune System) Tuning complete April 1, 2022 October 1, 2022 Task 2 (Issuing Licenses) Issuing 54 licenses May 1, 2022 May 1, 2022 Task 3 (Maintenance Services) Maintenance coverage for two (2) years October 1, 2022 October 1, 2022 Task 4 (Detector Analysis Enhancements) New Kadence version with enhancements. April 1, 2022 October 1, 2022 Task 5 (Final System Acceptance) Completion of Tasks 1-4 for all project locations N/A October 1, 2022 APPENDIX A3
AutoNDA by SimpleDocs

Related to PRELIMINARY PROJECT

  • Preliminary Prospectus No order preventing or suspending the use of any Preliminary Prospectus has been issued by the Commission, and each Preliminary Prospectus included in the Pricing Disclosure Package, at the time of filing thereof, complied in all material respects with the Securities Act, and no Preliminary Prospectus, at the time of filing thereof, contained any untrue statement of a material fact or omitted to state a material fact necessary in order to make the statements therein, in the light of the circumstances under which they were made, not misleading; provided that the Company makes no representation or warranty with respect to any statements or omissions made in reliance upon and in conformity with information relating to any Underwriter furnished to the Company in writing by such Underwriter through the Representatives expressly for use in any Preliminary Prospectus, it being understood and agreed that the only such information furnished by any Underwriter consists of the information described as such in Section 7(b) hereof.

  • Preliminary Plans Tenant shall cause Architect to ----------------- prepare preliminary plans (the "Preliminary Plans") for the Tenant Improvements ----------------- to be performed at the Premises. Tenant shall cause Architect to deliver the Preliminary Plans to Landlord within thirty (30) days after the date on which the Lease has been signed by Landlord and Tenant. Within five (5) days after Landlord's receipt of the Preliminary Plans, Landlord shall either approve or disapprove the Preliminary Plans, which approval shall not be unreasonably withheld. If Landlord disapproves the Preliminary Plans, then Landlord shall state in reasonable detail the changes which Landlord requires to be made thereto. Tenant shall submit to Landlord revised Preliminary Plans within five (5) days after Tenant's receipt of Landlord's disapproval notice. Following Landlord's receipt of the revised Preliminary Plans from Tenant, Landlord shall have the right to review and approve the revised Preliminary Plans pursuant to this Paragraph 2.2.1. Landlord shall give Tenant written notice of its approval --------------- or disapproval of the revised Preliminary Plans within five (5) days after the date of Landlord's receipt thereof. If Landlord reasonably disapproves the revised Preliminary Plans, then the following shall occur: (i) Landlord and Tenant shall continue to follow the procedures set forth in this Paragraph 2.2.1 --------------- until Landlord and Tenant reasonably approve the Preliminary Plans in accordance with this Paragraph 2.2.1, and (ii) the period between the date of Landlord's --------------- reasonable disapproval and the eventual mutual approval of such Preliminary Plans shall constitute a Tenant Delay.

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Preliminary Matters The Chair of the Hearing Panel will ask each party if it has any objections to the constitution of the Hearing Panel. Responses will be noted and recorded. If an objection is raised, the party raising the objection will be asked to immediately outline the objection. The Hearing Panel will then determine the merits of the objection.

  • Construction Costs Under no circumstances shall the Consultant be liable for extra costs or other consequences due to unknown conditions or related to the failure of contractors to perform work in accordance with the plans and specifications. Consultant shall have no liability whatsoever for any costs arising out of the Client’s decision to obtain bids or proceed with construction before the Consultant has issued final, fully-approved plans and specifications. The Client acknowledges that all preliminary plans are subject to substantial revision until plans are fully approved and all permits obtained.

  • Construction of Project 11.1.1 Developer agrees to cause the Project to be developed, constructed, and installed in accordance with the terms hereof and the Construction Provisions set forth in Exhibit D, including those things reasonably inferred from the Contract Documents as being within the scope of the Project and necessary to produce the stated result even though no mention is made in the Contract Documents.

  • Construction Budget The total amount indicated by the District for the Project plus all other costs, including design, construction, administration, financing, and all other costs.