PRODUCTION EQUIPMENT AND REQUIREMENTS Sample Clauses

PRODUCTION EQUIPMENT AND REQUIREMENTS. Two large wall-to-wall high-quality LED screens, supporting FHD (full high definition) or higher resolutions will be required on each side of the podium. - Good quality and reliable wireless (Wi-Fi) internet access. The Wi-Fi must meet the requirements of a high-density deployment by having the capacity to reliably and continuously connect over 1,500 devices. - The broadband internet connection bandwidth must be at least 600 Mbps upload and 1,000 Mbps download. - One gooseneck microphone per table on the dais in the plenary room. - One large screen behind the podium, as well as video-data projectors or appropriately dimensioned LCD screens. - 2 or more large comfort screen monitors facing the podium (on the floor or smaller LCD screens on the podium). - Podium and lectern branding showing the title, dates and venue of Conference, the United Nations logo, and the ECA logo.
AutoNDA by SimpleDocs

Related to PRODUCTION EQUIPMENT AND REQUIREMENTS

  • Equipment Requirements No Equipment is provided to Customer as part of this Service.

  • Specific Order Processes and Requirements 1. Distributor will order Software from SAP using and filling out completely such forms and minimum order requirements as SAP may prescribe from time to time and must comply with any then-current order process for the specific Software product. Where applicable, Distributor agrees to use the electronic means provided by SAP for placing orders.

  • Equipment and Software Requirements In order to view and retain electronic communications that we make available to you, you must have: • A PC or other device with an Internet browser that has “cookies” enabled and supports 128 bit encryption • An Internet connection • An email address • A PDF viewer (such as Adobe Reader) • A printer or computer with sufficient electronic storage space All communications shall be delivered to the last address we have on file for you. These notices will be sent through electronic delivery (email) and will be considered delivered the same day as sent. If you have opted out of electronic delivery, communications sent to you through the United States Postal Service are considered delivered 5 business days after the postmark date. It is your responsibility to notify the Custodian of any email address change or residential address change. We will not be held liable for any losses or damages if you have not provided Custodian with the most current address information. The electronically signed copy of this document should be considered equivalent to a printed hard copy form. It is considered a true and complete record of the document, admissible in arbitration and/or administrative hearings or proceedings. Your electronic signature on the Application and other electronic forms such as the Investment Direction are considered valid and the same as if the paper form or Application were signed.

  • Equipment and Facilities For On-Site Courses, you will supply the facility and equipment as set forth at xxx.xxxxxx.xxx/xxxxxxxx/xxxxxxxxx/xxxxxxxxxxxx.xxxx. If Red Hat agrees to provide the training facilities and hardware, you will be liable for any loss or destruction of this equipment and hardware used in connection with the Training.

  • Metering Requirements Seller shall comply with all applicable rules in installing a meter appropriate for deliveries pursuant to the Full Buy/Sell or Excess Sale arrangement selected in paragraph 2.2, above, which can be electronically read daily by:

  • Installation requirements 7.8 We (if we install the System) or our contractor (if we procure a contractor to install the System) must:

  • Limits and Requirements A. Workers’ Compensation/Employer’s Liability Insurance The minimum limits of insurance are: Part One: Statutory Part Two: Each Accident $1,000,000 Disease – Policy Limit $1,000,000 Disease – Each Employee $1,000,000

  • Technology Requirements The Customer is required to obtain and maintain, at the Customer’s own expense, compatible Electronic Channels, hardware, operating systems, and software approved for such use by Royal Bank, and which are up-to-date and unaltered from manufacturer specifications. Royal Bank is not responsible for, and makes no representations or warranties of any nature, with respect to any such Electronic Channels, hardware, operating systems, and software provided by any other Person. Royal Bank has the right, in its sole discretion, without notice, to make changes to this Service from time to time which may result in the Customer’s Electronic Channels, hardware, operating systems, and software no longer being compatible with this Service, and in such event, Royal Bank will have no responsibility or liability to the Customer or any other Person.

  • Occupational First Aid Requirements and Courses (a) The Union and the Employer agree that First Aid Regulations made pursuant to the Workers' Compensation Act shall be fully complied with.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

Time is Money Join Law Insider Premium to draft better contracts faster.