NO ATTACHMENT (a) Except as required by law, no right to receive payments under this Agreement shall be subject to anticipation, commutation, alienation, sale, assignment, encumbrance, charge, pledge, or hypothecation, or to execution, attachment, levy, or similar process or assignment by operation of law, and any attempt, voluntary or involuntary, to affect any such action shall be null, void, and of no effect. (b) This Agreement shall be binding upon, and inure to the benefit of, Executive and the Bank and their respective successors and assigns.
of Attachment Z The Interconnection Customer shall be responsible for all System Upgrade Facility costs as required by Section 32.3.5.3.2 of Attachment Z or its share of any System Upgrade Facilities and System Deliverability Upgrades costs resulting from the final Attachment S process, as applicable, and Attachment 6 to this Agreement shall be revised accordingly.
System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.
Program Description The employer agrees to provide a vision benefit to eligible employees and dependents. The vision benefit provided by the State shall have an employee co-payment of $10 for the comprehensive annual eye examination and $25 for materials.
Service Description 2.1 General
Task Order The Contractor submits a Task Order programme to the Service Manager within 2 days of receiving the Task Order
Attachments This contract consists of 7 pages including the following attachments which are incorporated herein: Attachment A - Statement of Work Attachment B - Payment Provisions Attachment C – “Standard State Provisions for Contracts and Grants” a preprinted form (revision date 12/15/2017)
Attachment E Data Use Agreement-TACCHO Version Attachment F – Federal Assurances-v1.1 Attachment G – Certification Regarding Lobbying Attachment H – FFATA Certification Form
ATTACHMENT D Standard State Provisions - Architect/Engineer Professional Service Agreement (dated 04/12/2011)