Project Horizontal and Vertical Control Sample Clauses

Project Horizontal and Vertical Control a) The Horizontal and Vertical Control for this project shall be based on the same datum, basis of bearing, calibration and benchmark as used for the Aerial Survey.
AutoNDA by SimpleDocs

Related to Project Horizontal and Vertical Control

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • System Access Control Data processing systems used to provide the Cloud Service must be prevented from being used without authorization. Measures: • Multiple authorization levels are used when granting access to sensitive systems, including those storing and processing Personal Data. Authorizations are managed via defined processes according to the SAP Security Policy • All personnel access SAP’s systems with a unique identifier (user ID). • SAP has procedures in place so that requested authorization changes are implemented only in accordance with the SAP Security Policy (for example, no rights are granted without authorization). In case personnel leaves the company, their access rights are revoked. • SAP has established a password policy that prohibits the sharing of passwords, governs responses to password disclosure, and requires passwords to be changed on a regular basis and default passwords to be altered. Personalized user IDs are assigned for authentication. All passwords must fulfill defined minimum requirements and are stored in encrypted form. In the case of domain passwords, the system forces a password change every six months in compliance with the requirements for complex passwords. Each computer has a password-protected screensaver. • The company network is protected from the public network by firewalls. • SAP uses up–to-date antivirus software at access points to the company network (for e-mail accounts), as well as on all file servers and all workstations. • Security patch management is implemented to provide regular and periodic deployment of relevant security updates. Full remote access to SAP’s corporate network and critical infrastructure is protected by strong authentication.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Public Improvements To the best knowledge of the Transferor Partnership, there are no written or proposed plans to widen, modify, or realign any street or highway or any existing or proposed eminent domain proceedings which would affect the Property in any way whatsoever. To the best knowledge of the Transferor Partnership, there are no presently planned public improvements which would result in the creation of a special improvement or similar lien upon the Property.

  • Participating TO's Interconnection Facilities Construction The Participating TO's Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Participating TO shall deliver to the Interconnection Customer and the CAISO the following “as-built” drawings, information and documents for the Participating TO's Interconnection Facilities [include appropriate drawings and relay diagrams]. The Participating TO will obtain control for operating and maintenance purposes of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades upon completion of such facilities. Pursuant to Article 5.2, the CAISO will obtain Operational Control of the Stand Alone Network Upgrades prior to the Commercial Operation Date.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

Time is Money Join Law Insider Premium to draft better contracts faster.