Loop A transmission path that extends from a Main Distribution Frame or functionally comparable piece of equipment in a Customer's serving End Office, to the Rate Demarcation Point (or NID if installed at the Rate Demarcation Point) in or at the Customer's premises. The actual transmission facilities used to provide a Loop may utilize any of several technologies.
Capacity Building 1. Contractor will work in partnership with AOD to study the viability of billing under Drug Medi-Cal and 3rd party payer. 2. Contractor will document and track consumers who are CalWORKS eligible.
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.
Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)
Name of Building Tenant shall not use the name of the Building for any purpose other than as the address of the business conducted by Tenant in the Premises without the written consent of Landlord. Landlord reserves the right to change the name of the Building at any time in its sole discretion by written notice to Tenant and Landlord shall not be liable to Tenant for any loss, cost or expense on account of any such change of name.
Notice to Centrelink Where a decision has been made to terminate the employment of employees, the employer shall notify Centrelink thereof as soon as possible giving relevant information including the number and categories of the employees likely to be affected and the period over which the terminations are intended to be carried out.
Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.
Fitness Center Subject to the provisions of this Section, so long as Tenant is not in Default under this Lease, and provided Tenant’s employees execute a standard waiver of liability form used at the Fitness Center (hereinafter defined) and pay the applicable one time or monthly fee, then Tenant’s employees (the “Fitness Center Users”) shall be entitled to use the KINETIC fitness center (the “Fitness Center”) in the building located at 600 Xxxxxxx Xxxxxx Xxxxx, Xxxxxxx Xxxxx, Xxxxxxxxxx. The use of the Fitness Center shall be subject to the rules and regulations (including rules regarding hours of use) established from time to time by the Fitness Center operator. Landlord and Tenant acknowledge that the use of the Fitness Center by the Fitness Center Users shall be at their own risk. Tenant acknowledges that the provisions of this Section shall not be deemed to be a representation by Landlord that the Fitness Center (or any other fitness facility) shall be continuously operated and maintained throughout the Term of this Lease, and no termination of Tenant’s or the Fitness Center Users’ rights to the Fitness Center shall entitle Tenant to an abatement or reduction in Basic Rent, constitute a constructive eviction, or result in an event of default by Landlord under this Lease. Tenant hereby voluntarily releases, discharges, waives and relinquishes any and all actions or causes of action for personal injury or property damage occurring to Tenant or its employees or agents arising as a result of the use of the Fitness Center, or any activities incidental thereto, wherever or however the same may occur, and further agrees that Tenant will not prosecute any claim for personal injury or property damage against Landlord or any of its officers, agents, servants or employees for any said causes of action. It is the intention of Tenant with respect to the Fitness Center to exempt and relieve Landlord from liability for personal injury or property damage caused by negligence. Tenant’s rights hereunder to permit its employees to use the Fitness Center shall belong solely to Tenant and may not be transferred or assigned without Landlord’s prior written consent, which may be withheld by Landlord in Landlord’s sole discretion.
Trade in Services 1. The Parties shall aim at gradually liberalising and opening their markets for trade in services in accordance with the provisions of the General Agreement on Trade in Services (hereinafter referred to as the “GATS”), taking into account ongoing work under the auspices of the WTO. 2. If a Party grants to a non-Party, after the entry into force of this Agreement, additional benefits with regard to the access to its services markets, it shall agree to enter into negotiations with a view to extending these benefits to another Party on a reciprocal basis. 3. The Parties undertake to keep under review paragraphs 1 and 2 with a view to establishing an agreement liberalising trade in services between them in accordance with Article V of the GATS.