Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user of such Loop. 3.2.1.2 CCI may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCI’s submission of an error free Line Splitter Ordering Document (“LSOD”) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI in a central office in which CCI is located, CCI shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill and CCI shall pay the electronic or manual ordering charges as applicable when CCI orders High Frequency Spectrum for end-user service. 3.2.1.4 BellSouth shall test the data portion of the loop to ensure the continuity of the wiring for CCI’s data.

Appears in 2 contracts

Samples: Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI FPB with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI FPB must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user End User of such Loop. 3.2.1.2 CCI FPB may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCIFPB’s submission of an error free Line Splitter Ordering Document (LSOD) to the BellSouth Complex Resale Support GroupCRSG. 3.2.1.3 Once a splitter is installed on behalf of CCI FPB in a central office in which CCI FPB is located, CCI FPB shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI FPB shall pay the electronic or manual ordering charges as applicable when CCI FPB orders High Frequency Spectrum for end-user End User service. 3.2.1.4 BellSouth shall test the data portion of the loop Loop to ensure the continuity of the wiring for CCIFPB’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI DTM with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI DTM must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user End User of such Loop. 3.2.1.2 CCI DTM may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCIDTM’s submission of an error free Line Splitter Ordering Document (LSOD) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI DTM in a central office in which CCI DTM is located, CCI DTM shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill and CCI DTM shall pay the electronic or manual ordering charges as applicable when CCI DTM orders High Frequency Spectrum for end-user End User service. 3.2.1.4 BellSouth shall test the data portion of the loop Loop to ensure the continuity of the wiring for CCIDTM’s data.

Appears in 1 contract

Samples: Bellsouth® / Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI NOW with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI NOW must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user of such Loop. 3.2.1.2 CCI NOW may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCINOW’s submission of an error free Line Splitter Ordering Document (“LSOD”) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI NOW in a central office in which CCI NOW is located, CCI NOW shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI NOW shall pay the electronic or manual ordering charges as applicable when CCI NOW orders High Frequency Spectrum for end-user service. 3.2.1.4 BellSouth shall test the data portion of the loop to ensure the continuity of the wiring for CCINOW’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI Gateway with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI Gateway must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user of such Loop. 3.2.1.2 CCI Gateway may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCIGateway’s submission of an error free Line Splitter Ordering Document (“LSOD”) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI Gateway in a central office in which CCI Gateway is located, CCI Gateway shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI Gateway shall pay the electronic or manual ordering charges as applicable when CCI Gateway orders High Frequency Spectrum for end-user service. 3.2.1.4 BellSouth shall test the data portion of the loop Loop to ensure the continuity of the wiring for CCIGateway’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI Tristar with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI Tristar must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user of such Loop. 3.2.1.2 CCI Tristar may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCITristar’s submission of an error free Line Splitter Ordering Document (“LSOD”) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI Tristar in a central office in which CCI Tristar is located, CCI Tristar shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI Tristar shall pay the electronic or manual ordering charges as applicable when CCI Tristar orders High Frequency Spectrum for end-user service. 3.2.1.4 BellSouth shall test the data portion of the loop to ensure the continuity of the wiring for CCITristar’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI CGI with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI CGI must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user of such Loop. 3.2.1.2 CCI CGI may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCICGI’s submission of an error free Line Splitter Ordering Document (“LSOD”) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI CGI in a central office in which CCI CGI is located, CCI CGI shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI CGI shall pay the electronic or manual ordering charges as applicable when CCI CGI orders High Frequency Spectrum for end-user service. 3.2.1.4 BellSouth shall test the data portion of the loop to ensure the continuity of the wiring for CCICGI’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI FTS with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI FTS must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user of such Loop. 3.2.1.2 CCI FTS may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCIFTS’s submission of an error free Line Splitter Ordering Document (“LSOD”) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI FTS in a central office in which CCI FTS is located, CCI FTS shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI FTS shall pay the electronic or manual ordering charges as applicable when CCI FTS orders High Frequency Spectrum for end-user service. 3.2.1.4 BellSouth shall test the data portion of the loop to ensure the continuity of the wiring for CCIFTS’s data.

Appears in 1 contract

Samples: Bellsouth® / Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI Access Point with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI Access Point must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user of such Loop. 3.2.1.2 CCI Access Point may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCIAccess Point’s submission of an error free Line Splitter Ordering Document (“LSOD”) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI Access Point in a central office in which CCI Access Point is located, CCI Access Point shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI Access Point shall pay the electronic or manual ordering charges as applicable when CCI Access Point orders High Frequency Spectrum for end-user service. 3.2.1.4 BellSouth shall test the data portion of the loop Loop to ensure the continuity of the wiring for CCIAccess Point’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI Dialogica with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI Dialogica must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user of such Loop. 3.2.1.2 CCI Dialogica may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth XxxxXxxxx will install splitters within thirty-six (36) calendar days of CCIDialogica’s submission of an error free Line Splitter Ordering Document (“LSOD”) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI Dialogica in a central office in which CCI Dialogica is located, CCI Dialogica shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth XxxxXxxxx will bill and CCI Dialogica shall pay the electronic or manual ordering charges as applicable when CCI Dialogica orders High Frequency Spectrum for end-user service. 3.2.1.4 BellSouth shall test the data portion of the loop to ensure the continuity of the wiring for CCIDialogica’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI NGTelecom with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI NGTelecom must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user End User of such Loop. 3.2.1.2 CCI NGTelecom may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCINGTelecom’s submission of an error free Line Splitter Ordering Document (LSOD) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI NGTelecom in a central office in which CCI NGTelecom is located, CCI NGTelecom shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI NGTelecom shall pay the electronic or manual ordering charges as applicable when CCI NGTelecom orders High Frequency Spectrum for end-user End User service. 3.2.1.4 BellSouth shall test the data portion of the loop Loop to ensure the continuity of the wiring for CCINGTelecom’s data.

Appears in 1 contract

Samples: Clec Agreement

AutoNDA by SimpleDocs

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI DSL with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI DSL must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user End User of such Loop. 3.2.1.2 CCI DSL may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCIDSL’s submission of an error free Line Splitter Ordering Document (LSOD) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI DSL in a central office in which CCI DSL is located, CCI DSL shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI DSL shall pay the electronic or manual ordering charges as applicable when CCI DSL orders High Frequency Spectrum for end-user End User service. 3.2.1.4 BellSouth shall test the data portion of the loop Loop to ensure the continuity of the wiring for CCIDSL’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI ATI with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI ATI must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user of such Loop. 3.2.1.2 CCI ATI may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCIATI’s submission of an error free Line Splitter Ordering Document (“LSOD”) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI ATI in a central office in which CCI ATI is located, CCI ATI shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI ATI shall pay the electronic or manual ordering charges as applicable when CCI ATI orders High Frequency Spectrum for end-user service. 3.2.1.4 BellSouth shall test the data portion of the loop to ensure the continuity of the wiring for CCIATI’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI SPARDI with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI SPARDI must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user of such Loop. 3.2.1.2 CCI SPARDI may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCISPARDI’s submission of an error free Line Splitter Ordering Document (“LSOD”) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI SPARDI in a central office in which CCI SPARDI is located, CCI SPARDI shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill and CCI SPARDI shall pay the electronic or manual ordering charges as applicable when CCI SPARDI orders High Frequency Spectrum for end-user service. 3.2.1.4 BellSouth shall test the data portion of the loop Loop to ensure the continuity of the wiring for CCISPARDI’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI GSC with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI GSC must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user of such Loop. 3.2.1.2 CCI GSC may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCIGSC’s submission of an error free Line Splitter Ordering Document (“LSOD”) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI GSC in a central office in which CCI GSC is located, CCI GSC shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI GSC shall pay the electronic or manual ordering charges as applicable when CCI GSC orders High Frequency Spectrum for end-user service. 3.2.1.4 BellSouth shall test the data portion of the loop to ensure the continuity of the wiring for CCIGSC’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI DPI with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI DPI must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user End User of such Loop. 3.2.1.2 CCI DPI may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCIDPI’s submission of an error free Line Splitter Ordering Document (LSOD) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI DPI in a central office in which CCI DPI is located, CCI DPI shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI DPI shall pay the electronic or manual ordering charges as applicable when CCI DPI orders High Frequency Spectrum for end-user End User service. 3.2.1.4 BellSouth shall test the data portion of the loop Loop to ensure the continuity of the wiring for CCIDPI’s data.

Appears in 1 contract

Samples: Clec Agreement

Provisioning of High Frequency Spectrum and Splitter Space. 3.2.1 BellSouth will provide CCI BSE with access to the High Frequency Spectrum as follows: 3.2.1.1 To order High Frequency Spectrum on a particular Loop, CCI BSE must have a Digital Subscriber Line Access Multiplexer (DSLAM) collocated in the central office that serves the end-user End User of such Loop. 3.2.1.2 CCI BSE may provide its own splitters or may order splitters in a central office once it has installed its DSLAM in that central office. BellSouth will install splitters within thirty-six (36) calendar days of CCIBSE’s submission of an error free Line Splitter Ordering Document (LSOD) to the BellSouth Complex Resale Support Group. 3.2.1.3 Once a splitter is installed on behalf of CCI BSE in a central office in which CCI BSE is located, CCI BSE shall be entitled to order the High Frequency Spectrum on lines served out of that central office. BellSouth will bill xxxx and CCI BSE shall pay the electronic or manual ordering charges as applicable when CCI BSE orders High Frequency Spectrum for end-user End User service. 3.2.1.4 BellSouth shall test the data portion of the loop Loop to ensure the continuity of the wiring for CCIBSE’s data.

Appears in 1 contract

Samples: Clec Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!