Pumpage Sample Clauses

Pumpage. Subject to subsequent agreement of the Parties in connection with Paragraph III.B.3.c. hereof, the following shall be Artesian’s planned draws for production xxxxx at Llangollen over rolling consecutive 90-day periods: Well AWC-2 = 25.9 million gallons (200 gpm) Xxxxx AWC-6R and/or AWC-7 = 38.9 million gallons (300 gpm) Well AWC-G3R = 64.8 million gallons (500 gpm), noting Artesian has applied to have that allocation increased to 155.5 million gallons (1200 gpm), which application shall not be opposed by the Trust. Artesian shall comply with this provision until the USEPA determines that such pumping is no longer required to capture Site-related COCs.
AutoNDA by SimpleDocs

Related to Pumpage

  • Fuel Upon redelivery of the Aircraft to Lessor, an adjustment will be made in respect of fuel on board on the Previous Delivery Date and the Expiry Date at the price then prevailing at the Redelivery Location.

  • Electric N/A Electric from Clark from PP6 to DCU-843 2 N/A ------------------------------------------------------------------------------------------------------------------ N/A Electric from Clark from PP6 to Feed Tanks 4 N/A ------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Interconnection If Manager desires to interconnect a portion of the Service Area Network with another carrier and Sprint PCS can interconnect with that carrier at a lower rate, then to the extent permitted by applicable laws, tariffs and contracts, Sprint PCS may arrange for the interconnection under its agreements with the carrier and if it does so, Sprint PCS will xxxx the interconnection fees to Manager.

  • Transportation Reasonable transportation costs incurred in connection with the transportation of employees and material necessary for Operations.

  • Plant An electrical generating alternative energy resource facility developed by Producer for which IID shall provide transmission service, as specified in Exhibit(s) II, Transmission Service, and in any subsequent Plant Amendments.

  • Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Electrical During the Term of this Lease, there shall be available to the Leased Premises electrical facilities comparable to those supplied in other comparable office buildings in the vicinity of the Building to provide sufficient power for normal lighting and office machines of similar low electrical consumption, and one personal computer for each desk station, but not for any additional computers or extraordinary data processing equipment, special lighting and any other item of electrical equipment which requires a voltage other than one hundred ten (110) volts single phase and is not typically found in an office, as determined by Landlord in its sole, but reasonable discretion; and provided, however, that if the installation of such electrical equipment requires additional air conditioning capacity above that normally provided to tenants of the Building or above standard usage of existing capacity as determined by Landlord in its sole, but reasonable discretion, then the additional air conditioning installation and/or operating costs attributable thereto shall be paid by Tenant. Tenant agrees not to use any apparatus or device in, upon or about the Leased Premises which may in any way increase the amount of such electricity usually furnished or supplied to the Leased Premises, and Tenant further agrees not to connect any apparatus or device to the wires, conduits or pipes or other means by which such electricity is supplied, for the purpose of using additional or unusual amounts of electricity, without the prior written consent of Landlord. At all times, Tenant’s use of electric current shall never exceed Tenant’s share of the capacity of the feeders to the Building or the risers or wiring installation. Tenant shall not install or use or permit the installation or use in the Leased Premises of any computer or electronic data processing or ancillary equipment or any other electrical apparatus designed to operate on electrical current in excess of 110 volts and 5 amps per machine, without the prior written consent of Landlord, which consent shall not be unreasonably withheld, conditioned or delayed. If Tenant shall require electrical current in excess of that usually furnished or supplied for use of the Leased Premises as general office space, Tenant shall first procure the written consent of Landlord (which consent shall not be unreasonably withheld, conditioned or delayed) to the use thereof and Landlord or Tenant may (i) cause a meter to be installed in or for the Leased Premises, or (ii) if Tenant elects not to install said meter, Landlord may reasonably estimate such excess electrical current. The cost of any meters (including, without limitation, the cost of any installation) or surveys to estimate such excess electrical current shall be paid by Tenant. Landlord’s approval of any space plan, floor plan, construction plans, specifications, or other drawings or materials regarding the construction of the Tenant Improvements or any alterations shall not be deemed or construed as consent by Landlord under this paragraph to Tenant’s use of such excess electrical current as provided above. Tenant agrees to pay to Landlord, promptly upon demand therefor, all costs of such excess electrical current consumed as calculated by said meters (at the rates charged for such services to the Building by the municipality or the local public utility) or the excess amount specified in said estimate, as the case may be, plus any additional expense incurred in keeping account of the electrical current so consumed, which additional expense Landlord shall advise Tenant within a reasonable time after request by Tenant.

Time is Money Join Law Insider Premium to draft better contracts faster.