REACTIVE POWER LIMITERS Sample Clauses

REACTIVE POWER LIMITERS. The Customer shall ensure that the voltage control system is stable when the Reactive Power limits are reached.
AutoNDA by SimpleDocs

Related to REACTIVE POWER LIMITERS

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Real and Reactive Power Control 36 9.6 Outages and Interruptions. 37 9.7 Switching and Tagging Rules. 41 9.8 Use of Attachment Facilities by Third Parties. 41 9.9 Disturbance Analysis Data Exchange. 42 ARTICLE 10. MAINTENANCE 42 10.1 Connecting Transmission Owner Obligations. 42 10.2 Developer Obligations. 42 10.3 Coordination. 42 10.4 Secondary Systems. 42 10.5 Operating and Maintenance Expenses. 43 ARTICLE 11. PERFORMANCE OBLIGATION 43

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Cloud Computing State Risk and Authorization Management Program In accordance with Senate Bill 475, Acts 2021, 87th Leg., R.S., pursuant to Texas Government Code, Section 2054.0593, Contractor acknowledges and agrees that, if providing cloud computing services for System Agency, Contractor must comply with the requirements of the state risk and authorization management program and that System Agency may not enter or renew a contract with Contractor to purchase cloud computing services for the agency that are subject to the state risk and authorization management program unless Contractor demonstrates compliance with program requirements. If providing cloud computing services for System Agency that are subject to the state risk and authorization management program, Contractor certifies it will maintain program compliance and certification throughout the term of the Contract.

  • Metode Penelitian Penelitian ini bersifat deskriptif. Jenis penelitian yang digunakan adalah hukum normatif. Sumber data yang dipergunakan pada penelitian ini adalah data sekunder yang terdiri dari :

  • Payment for Reactive Power NYISO shall pay Developer for reactive power or voltage support service that Developer provides from the Large Generating Facility in accordance with the provisions of Rate Schedule 2 of the NYISO Services Tariff.

  • Eindgebruikers binnen de Amerikaanse overheid De Apple software en de bijbehorende documentatie zijn “Commercial Items”, zoals omschreven in 48 C.F.R. §2.101, en bestaan uit “Commercial Computer Software” en “Commercial Computer Software Documentation”, zoals beschreven in 48 C.F.R. §12.212 of 48 C.F.R. §227.7202, afhankelijk xxx xxxxx paragraaf van toepassing is. Overeenkomstig 48 C.F.R. §12.212 of 48 C.F.R. §227.7202-1 tot en met 227.7202-4, afhankelijk xxx xxxxx paragraaf van toepassing is, xxxxxx de “Commercial Computer Software” en “Commercial Computer Software Documentation” aan eindgebruikers binnen de Amerikaanse overheid (a) alleen als “Commercial Items” in licentie gegeven en (b) alleen met de rechten die xxxxxx verleend aan alle andere eindgebruikers conform de voorwaarden die hierin xxxxxx genoemd. Ongepubliceerd: rechten voorbehouden krachtens de auteursrechtwetgeving van de Verenigde Staten.

  • MSEA SEIU shall have exclusive rights to payroll deduction of membership dues, service fees, and premiums for current MSEA-SEIU spon- sored insurance programs. Deductions for other programs may be mutually agreed to by the parties.

  • Copper Subloops Sprint will make available access to copper subloops on an unbundled basis. A copper subloop is a portion of a Copper Loop, or Hybrid Loop, and is comprised entirely of copper wire or copper cable that acts as a transmission facility between any accessible terminal in Sprint’s outside plant, including inside wire owned or controlled by Sprint, and the end-user customer premises. A copper subloop can also include intermediate devices, such as repeaters, used to establish the transmission path. Copper subloops can be used by CLEC to provide voice-grade services as well as digital subscriber line services. Access to copper subloops is subject to the collocation provisions of this Agreement. Copper subloop consists of the distribution portion of the copper loop. Sprint is not obligated to offer feeder loop plant as a stand-alone UNE.