Remedy Operating Manual Sample Clauses

Remedy Operating Manual 
AutoNDA by SimpleDocs

Related to Remedy Operating Manual

  • Project Manual A bound manual prepared by the Design Professional. It includes the Invitation to Bid, Instructions to Bidders, the Bid Form, the Specifications, the General Conditions and Supplementary General Conditions.

  • Operations Manual The Franchisor agrees to loan to the Franchisee one or more manuals, technical bulletins, cookbooks and recipes and other written materials (collectively referred to as “Operations Manual”) covering Factory Candy ordering, Store Candy manufacturing, processing and stocking and other operating and in-store marketing techniques for the ROCKY MOUNTAIN CHOCOLATE FACTORY Store. The Franchisee agrees that it shall comply with the Operations Manual as an essential aspect of its obligations under this Agreement, that the Operations Manual shall be deemed to be incorporated herein by reference and failure by the Franchisee to substantially comply with the Operations Manual may be considered by the Franchisor to be a breach of this Agreement.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Violence Policies and Procedures The Employer agrees to have in place explicit policies and procedures to deal with violence. The policy will address the prevention of violence, the management of violent situations, provision of legal counsel and support to employees who have faced violence. The policies and procedures shall be part of the employee's health and safety policy and written copies shall be provided to each employee. Prior to implementing any changes to these policies, the employer agrees to consult with the Association.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Implementation Report Within 150 days after the Effective Date, Ensign Group shall submit a written report to OIG summarizing the status of its implementation of the requirements of this CIA (Implementation Report). The Implementation Report shall, at a minimum, include: 1. the name, address, phone number, and position description of the Compliance Officer required by Section III.A, and a summary of other noncompliance job responsibilities the Compliance Officer may have; 2. the names and positions of the members of the Compliance Committee required by Section III.A; 3. the names and positions of the members of the Board of Directors who are responsible for satisfying the Board of Directors compliance obligations described in Section III.A.3; 4. a copy of Ensign Group’s Code of Conduct required by Section III.B.1; 5. the number of individuals required to complete the Code of Conduct certification required by Section III.B.1, the percentage of individuals who have completed such certification, and an explanation of any exceptions (the documentation supporting this information shall be available to OIG upon request); 6. a summary of all Policies and Procedures required by Section III.B (copies of the Policies and Procedures shall be made available to OIG upon request); 7. the following information regarding each type of training required by Section III.C: a. a description of such training, including a summary of the topics covered, the length of sessions, and a schedule of training sessions; b. the number of individuals required to be trained, percentage of individuals actually trained, and an explanation of any exceptions. A copy of all training materials and the documentation supporting this information shall be made available to OIG upon request. 8. a description of the Disclosure Program required by Section III.E; 9. the following information regarding the IRO(s): (a) identity, address, and phone number; (b) a copy of the engagement letter; (c) information to demonstrate that the IRO has the qualifications outlined in Appendix A to this CIA; (d) a summary and description of any and all current and prior engagements and agreements between Ensign Group and the IRO; and (e) a certification from the IRO regarding its professional independence and objectivity with respect to Ensign Group; 10. a description of the process by which Ensign Group fulfills the requirements of Section III.F regarding Ineligible Persons; 11. a list of all of Ensign Group’s locations (including locations and mailing addresses); the corresponding name under which each location is doing business; the corresponding phone numbers and fax numbers; each location’s Medicare and state Medicaid program provider number and/or supplier number(s); and the name and address of each Medicare and state Medicaid program contractor to which Ensign Group currently submits claims; 12. a description of Ensign Group’s corporate structure, including identification of any parent and sister companies, subsidiaries, and their respective lines of business; and

  • Enterprise Information Management Standards Grantee shall conform to HHS standards for data management as described by the policies of the HHS Office of Data, Analytics, and Performance. These include, but are not limited to, standards for documentation and communication of data models, metadata, and other data definition methods that are required by HHS for ongoing data governance, strategic portfolio analysis, interoperability planning, and valuation of HHS System data assets.

  • Ordering Guidelines and Processes 1.13.1 For information regarding Ordering Guidelines and Processes for various Network Elements, Combinations and Other Services, PLI should refer to the “Guides” section of the BellSouth Interconnection Web site, which is incorporated herein by reference, as amended from time to time. The Web site address is: http//xxx.xxxxxxxxxxxxxxx.xxxxxxxxx.xxx/. 1.13.2 Additional information may also be found in the individual CLEC Information Packages, which are incorporated herein by reference, as amended from time to time, located at the “CLEC UNE Products” Web site address: xxxx://xxx.xxxxxxxxxxxxxxx.xxxxxxxxx.xxx/guides/html/unes.html. 1.13.3 The provisioning of Network Elements, Combinations and Other Services to PLI’s Collocation Space will require cross-connections within the central office to connect the Network Element, Combinations or Other Services to the demarcation point associated with PLI’s Collocation Space. These cross-connects are separate components that are not considered a part of the Network Element, Combinations or Other Services and, thus, have a separate charge pursuant to this Agreement.

  • Construction Reports Each Constructing Entity shall issue reports to each other Construction Party on a monthly basis, and at such other times as reasonably requested, regarding the status of the construction and installation of the Interconnection Facilities. Each Construction Party shall promptly identify, and shall notify each other Construction Party of, any event that the Construction Party reasonably expects may delay completion, or may significantly increase the cost, of the Interconnection Facilities. Should a Construction Party report such an event, Transmission Provider shall, within fifteen days of such notification, convene a technical meeting of the Construction Parties to evaluate schedule alternatives.