Construction Reports definition

Construction Reports means reports to be submitted by the Concessionaire addressing the matters identified under Clause 5.3.1, together with such other matters as the Government may reasonably specify from time to time;
Construction Reports has the meaning set forth in Section 5.14(a)(i).
Construction Reports means any report prepared by Person, including, without limitation, any architect, contractor, or engineer in connection with the construction or substantial rehabilitation of any Project.

Examples of Construction Reports in a sentence

  • The maximum time for completion and the providing of the updated As- Built Construction Reports to the Department shall be two months after completion of the maintenance or rehabilitation activity.

  • The Seller shall give the Purchaser in the Construction Reports not less than thirty (30) Days’ prior notice of the date from which it or its Contractor will commence the Seller Interconnection Works and shall complete the Seller Interconnection Works in accordance with the Interconnection Works Schedule.

  • All new electric transmission lines shall be reported to the commission in accordance with §25.83 of this title (relating to Transmission Construction Reports).

  • The maximum time for completion and the providing of the As-Built Construction Reports to the Department shall be six months after Traffic Availability.

  • The Volusia and Flagler County Construction Reports were provided in the agenda.

  • As-Built Construction Reports shall be updated, as required, to reflect maintenance and rehabilitation activities that change the physical dimensions or characteristics of the Infrastructure.

  • The Contractor may submit these Daily Construction Reports on a weekly basis.

  • Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project Site: 1.

  • The Interim Construction Reports shall address the items set forth in Minnesota Rules part 6115.0410, subparts 9 through 11.

  • If the As-Built Construction Reports are not available to the Department within the specified time, a Payment Adjustment of $12,000/month or any partial month, for every month in excess of the specified time shall apply until available.

Related to Construction Reports

  • Inspection Report means the report delivered by the Master Servicer or the Special Servicer, as the case may be, substantially in the form of Exhibit L hereto.

  • Condition Report means a condition report with respect to a Program Vehicle, signed and dated by the Servicer and a Manufacturer or its agent in accordance with the applicable Manufacturer Program.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Construction Completion Certificate means a certificate of the I-Bank to the effect that the construction of the Project is complete.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • construction site means a workplace where construction work is being performed;

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Progress Reports The Progress Reports as required by the individual Task Work Orders issued pursuant to this Agreement. Responsible: Responsible or Responsibility means the financial ability, legal capacity, integrity and past performance of Contractor and as such terms have been interpreted relative to public procurements. See NYS Finance Law § 163(1)(c).

  • Verification Report As defined in Section 4.19.

  • Exception Report The report of the Trustee referred to in Section 2.02.

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Operating Statement Analysis Report format substantially in the form of and containing the information called for therein for the Mortgage Loans, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.

  • Collection Report means the monthly report prepared by the Primary Servicer setting forth, with respect to each Mortgage Loan and the most recently ended Collection Period prior to the due date of such report, the information described on Exhibit G attached hereto.

  • Construction Work means any work in connection with⎯

  • Construction Plans means plans, drawings, specifications and related documents, and construction schedules for the construction of the Project, together with all supplements, amendments or corrections, submitted by the Developer and approved by the City in accordance with this Agreement.

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • SOS Reports means the official reports from the Secretaries of State of each Collateral State, Chief Executive Office State and the Borrower State and other applicable federal, state or local government offices identifying all current security interests filed in the Collateral and Liens of record as of the date of such report.

  • Environmental Reports means each and every “Phase I Environmental Site Assessment” (and, if applicable, “Phase II Environment Site Assessment”) as referred to in the ASTM Standards on Environmental Site Assessments for Commercial Real Estate, E 1527-2000 and an asbestos survey, with respect to each Mortgaged Property, prepared by one or more Environmental Auditors and delivered to Lender and any amendments or supplements thereto delivered to Lender.

  • Engineering Reports has the meaning assigned such term in Section 2.07(c)(i).

  • Plans and Specifications means the plans, drawings and specifications reasonably necessary to properly assess and review proposed Work prior to issuance of any approval that may be required under this Agreement;

  • Evaluation Report means a report on the evaluation of tenders prepared under CSO 12

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Reconciliation Report refers to the Reconciliation Report as referenced in s. 1 of Reg 200/21 under Connecting Care Act, 2019.

  • Physical Conditions Report means, with respect to the Property, a report prepared by a company satisfactory to Lender regarding the physical condition of the Property, satisfactory in form and substance to Lender in its sole discretion, which report shall, among other things, (a) confirm that the Property and its use complies, in all material respects, with all applicable Legal Requirements (including, without limitation, zoning, subdivision and building laws) and (b) include a copy of a final certificate of occupancy with respect to all Improvements on the Property.

  • CMSA Operating Statement Analysis Report means a report substantially in the form of, and containing the information called for in, the downloadable form of the "Operating Statement Analysis Report" available as of the Closing Date on the CMSA Website or in such other form for the presentation of such information and containing such additional information as may from time to time be approved by the CMSA for commercial mortgage-backed securities transactions generally.