Requested Point of Interconnection Sample Clauses

Requested Point of Interconnection. Requested In-Service Date: For installations at locations with existing electric service to which the proposed Generating Facility will interconnect, provide: Local Electric Service Provider*: Existing Account Number : [*To be provided by the Interconnection Customer if the local electric service provider is different from the Utility] Contact Name: Title: E-Mail Address: Mailing Address: City: State: Zip: Telephone (Day): Fax: (Evening): Generating Facility Information Data apply only to the Generating Facility, not the Interconnection Facilities. Data applies only to the Generating Facility, not the Interconnection Facilities. Prime Mover: Photovoltaic (PV) Fuel Cell Reciprocating Engine Gas Turbine Steam Turbine Micro-turbine Energy Source: Other Renewable Non-Renewable ❑ Solar – Photovoltaic ❑ Solar – thermal ❑ Biomass – landfill gas ❑ Biomass – manure digester gas ❑ Biomass – directed biogas ❑ Biomass – solid waste ❑ Biomass – sewage digester gas ❑ Biomass – wood ❑ Biomass – other (specify below) ❑ Hydro power – run of river ❑ Hydro power - storage ❑ Hydro power – tidal ❑ Hydro power – wave ❑ Wind ❑ Geothermal ❑ Other (specify below) ❑ Fossil Fuel - Diesel ❑ Fossil Fuel - Natural Gas (not waste) ❑ Fossil Fuel - Oil ❑ Fossil Fuel – Coal ❑ Fossil Fuel – Other (specify below) ❑ Other (specify below) Type of Generator: Synchronous Induction Inverter Total Generator Nameplate Rating: kWAC KwDC kVAR Interconnection Customer or Customer-Site Load: kWAC (if none, so state) Interconnection Customer Generator Auxiliary Load: kWAC Typical Reactive Load (if known): kVAR Maximum Physical Export Capability Requested: kWAC (The maximum continuous electrical output of the Generating Facility at any time at a power factor of approximately unity as measured at the Point of Interconnection and the maximum kW delivered to the Utility during any metering period.) List components of the Generating Facility equipment package that are currently certified: Number Equipment Type Certifying Entity 1.
AutoNDA by SimpleDocs
Requested Point of Interconnection. Requested In-Service Date: For installations at locations with existing electric service to which the proposed Generating Facility will interconnect, provide: Local Electric Service Provider: Existing Account Number: To be provided by the Interconnection Customer if the local electric service provider is different from the Utility Contact Name: Title: E-Mail Address: Mailing Address: City: State: Zip: Telephone (Day): (Evening): Fax:
Requested Point of Interconnection. Requested In-Service Date: For installations at locations with existing electric service to which the proposed Generating Facility will interconnect, provide: Local Electric Service Provider*: Existing Account Number : [*To be provided by the Interconnection Customer if the local electric service provider is different from the Utility] Contact Name: Title: E-Mail Address: Mailing Address: City: State: Zip: Telephone (Day): Fax: (Evening): Generating Facility Information Data apply only to the Generating Facility, not the Interconnection Facilities. Data applies only to the Generating Facility, not the Interconnection Facilities. Prime Mover:Photovoltaic (PV) Fuel Cell Reciprocating Engine Other Gas Turbine Steam Turbine Micro-turbine Energy Source:
Requested Point of Interconnection. Requested In-Service Date: For installations at locations with existing electric service to which the proposed Generating Facility will interconnect, provide: Local Electric Service Provider*: Existing Account Number : [*To be provided by the Interconnection Customer if the local electric service provider is different from the Utility] ELECTRONICALLY FILED - 2019 April 22 5:05 PM - SCPSC - Docket # 2019-130-E - Page 44 of 115 Contact Name: Title: E-Mail Address: Mailing Address: City: State: Zip: Telephone (Day): Fax: (Evening): Generating Facility Information Data apply only to the Generating Facility, not the Interconnection Facilities. Data applies only to the Generating Facility, not the Interconnection Facilities. Prime Mover: Photovoltaic (PV) Fuel Cell Reciprocating Engine Gas Turbine Steam Turbine Micro-turbine Other Energy Source:

Related to Requested Point of Interconnection

  • Point of Interconnection The Point of Interconnection shall be as identified on the one-line diagram attached as Schedule B to this ISA.

  • of Interconnection 2.1.1 Each Party, at its own expense, shall provide transport facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA selected by ENT.

  • Establishment of Point of Interconnection The point where the electric energy first leaves the wires or facilities owned by the Cooperative and enters the wires or facilities provided by DG Owner/Operator is the "Point of Interconnection." Cooperative and DG Owner/Operator agree to interconnect the Facilities at the Point of Interconnection in accordance with the Cooperative's Rules and Regulations and DG Manual relating to interconnection of Distributed Generation (the "Rules") and as described in the attached Exhibit A. The interconnection equipment installed by the customer ("Interconnection Facilities") shall be in accordance with the Rules as well.

  • Commencement of Interconnection Activities If the Developer executes the final LGIA, the ISO, Connecting Transmission Owner and the Developer shall perform their respective obligations in accordance with the terms of the LGIA, subject to modification by FERC. Upon submission of an unexecuted LGIA in accordance with Section 30.11.3, the Parties shall promptly comply with the unexecuted LGIA, subject to modification by FERC.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service and Capacity Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!