Review of Preliminary Design Sample Clauses

Review of Preliminary Design. Prior to proceeding with the final Design Phase under an engineering services contract, City shall review the preliminary design plans and preliminary cost estimate and each shall provide District with its written authorization to proceed.
AutoNDA by SimpleDocs

Related to Review of Preliminary Design

  • ADB’s Review of Procurement Decisions 9. All contracts procured under international competitive bidding procedures and contracts for consulting services shall be subject to prior review by ADB, unless otherwise agreed between the Borrower and ADB and set forth in the Procurement Plan. SCHEDULE 5

  • Review Protocol A narrative description of how the Claims Review was conducted and what was evaluated.

  • Escrow Format Specification 3.1. Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • Office of Inspector General Investigative Findings Expert Review In accordance with Senate Bill 799, Acts 2021, 87th Leg., R.S., if Texas Government Code, Section 531.102(m-1)(2) is applicable to this Contract, Contractor affirms that it possesses the necessary occupational licenses and experience.

  • How to File an Appeal of a Prescription Drug Denial For denials of a prescription drug claim based on our determination that the service was not medically necessary or appropriate, or that the service was experimental or investigational, you may request an appeal without first submitting a request for reconsideration. You or your physician may file a written or verbal prescription drug appeal with our pharmacy benefits manager (PBM). The prescription drug appeal must be submitted to us within one hundred and eighty (180) calendar days of the initial determination letter. You will receive written notification of our determination within thirty (30) calendar days from the receipt of your appeal. How to File an Expedited Appeal Your appeal may require immediate action if a delay in treatment could seriously jeopardize your health or your ability to regain maximum function, or would cause you severe pain. To request an expedited appeal of a denial related to services that have not yet been rendered (a preauthorization review) or for on-going services (a concurrent review), you or your healthcare provider should call: • our Grievance and Appeals Unit; or • our pharmacy benefits manager for a prescription drug appeal. Please see Section 9 for contact information. You will be notified of our decision no later than seventy-two (72) hours after our receipt of the request. You may not request an expedited review of covered healthcare services already received.

  • EODUF Packing Specifications 7.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Equipment Specifications All equipment must meet the contract specifications and all federal and State safety codes and regulations in effect at the date of manufacture. All equipment must be Original Equipment Manufacturer (OEM) equipment unless otherwise stated in the contract. Items Offered as New. All products, materials, supplies, replacement parts, and equipment offered and furnished must be new, of current manufacturer production, and must have been formally announced by the manufacturer as being commercially available, unless otherwise stated in this Contract.

  • CLARIFICATION OF SPECIFICATION DOCUMENTS 4.1 Bidders shall promptly notify the Purchasing Agent of any ambiguity, inconsistency or error which they may discover upon examination of the specification documents.

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • Classification Specifications The Employer agrees to supply the President of the Union or his/her designate with the classification specifications for those classifications in the Bargaining Unit.

Time is Money Join Law Insider Premium to draft better contracts faster.