Roundabout Planning and Conceptual Design Sample Clauses

Roundabout Planning and Conceptual Design. The design of a roundabout at this intersection will require additional right of way. Reasonable modifications to the roundabout size, position, and geometry can be made to accommodate design constraints or preferences. GENESIS will provide the CLIENT with up to three (3) conceptual roundabout exhibits to support the decision-making process. In addition, XXXXXXX will perform the necessary roundabout planning in advance of proceeding with the design process. This includes roundabout speed management, fastest path analysis, design vehicle accommodations, and operational modeling. This analysis will support the determination of appropriate roundabout size, deflections, and approach and exit geometry.
AutoNDA by SimpleDocs

Related to Roundabout Planning and Conceptual Design

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Project Planning GOVERNMENTAL APPROVALS; ENVIRONMENTAL COMPLIANCE; PUBLIC INFORMATION 30 4.1 Planning and Engineering Activities 30 4.2 Site Conditions 30 4.3 Governmental Approvals 30 4.4 Environmental Compliance 34 4.5 Community Outreach and Public Information 35

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • INTERNET PLANNING, ENGINEERING AND OPERATIONS ‌ Job Title: Internet/Web Engineer Job#: 2620 General Characteristics Integrally involved in the development and support of all Internet/Intranet/Extranet sites and supporting systems. Works closely with other IT groups and customers to define the system design and user interface based on customer needs and objectives. Participates in all phases of the development and implementation process, and may act as a project manager on special projects. Ensures the integration of the Web servers and all other supporting systems. Responsible for system tuning, optimization of information/data processing, maintenance and support of the production environment.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Requirement for Project Planning No physical work will begin on the construction site until the receipt of a Proceed Order issued by the Owner. The Contract assumes that a Proceed Order will be issued in not more than sixty days from the Effective Date of the Contract. Failure of the Contractor to provide the necessary documentation for the issuance of a Proceed Order shall not entitle the Contractor to any extension of time. If a Proceed Order is not issued within sixty days from the award of the Contract and non-issuance is due to nonperformance by the Contractor, the Contractor may be in default.

  • Development cooperation 1. The Parties recognise that development cooperation is a crucial element of their Partnership and an essential factor in the realisation of the objectives of this Agreement as laid down in Article 1. This cooperation can take financial and non-financial forms.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

Time is Money Join Law Insider Premium to draft better contracts faster.