Sanitary Sewer Service Connections Sample Clauses

Sanitary Sewer Service Connections i. Material: Pipe: 100mm PVC SDR 28 pipe green in colour shall be used for sanitary sewer service connections unless otherwise specified on approved design drawings Service Connections: All service connections shall be made using an approved manufactured tee. Plugs: Metal, compression type or mechanical expansion type providing a leak-proof seal. Caps shall not be used without the prior written approval of the Director.
AutoNDA by SimpleDocs
Sanitary Sewer Service Connections i. Material: • Pipe: 100mm PVC SDR 28 pipe green in colour shall be used for sanitary sewer service connections unless otherwise specified on approved design drawings

Related to Sanitary Sewer Service Connections

  • Utilities The Landlord shall provide the following utilities and services to the Tenant: _

  • Sanitary Facilities Construction (a) Closets shall be soundly constructed and roofed with weatherproof material. The floor of each closet shall be well drained and constructed of concrete, bricks and cement, or of other approved materials which shall be impervious to water. Every closet shall be well lighted by natural or artificial light and shall be ventilated. Each closet shall have a hinged door, capable of being fastened on the inside, lift seats/flaps and toilet paper. (b) If closets are of single unit construction (only to be used for the formwork process), not contained within a purpose built ablution block, privacy walls which shield the closet/s from outside view shall be installed. (Privacy walls are not required for purpose built ablution blocks eg ATCO huts). (c) Where practicable, toilets to be connected to sewerage before commencement of the job. (d) Closet/urinal location to be conveniently accessible to Employees, but not so close as to cause a nuisance to those persons. (e) Where necessary, portable water seal toilets of an approved standard are to be provided and regularly serviced. (f) Conveniently accessible closets and urinals are to be distributed every 5th floor on multi storey constructions. (g) Closets and urinals are to be washed daily with disinfectant and kept in clean, hygienic condition. (h) Adequate washing facilities, suitably drained, and wash basins/troughs are to be supplied with hot and cold running water. (i) Soap and towels are to be supplied.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!