Sawcutting. Any sawcutting required for the sidewalk, roadways and driveways shall be performed by the Contractor utilizing a water cooled saw, as indicated on the plans, or as directed by the Engineer. EARTH EXCAVATION, BACKFILL, FILL, AND GRADING General Description Extent of Open Excavation Separation of Surface Materials Sheeting and Bracing Trench Excavation Depth of Trench Width of Trench Trench Excavation in Fill Excavation Near Existing Structures Protection of Existing Structures Relocation and Replacement of Existing Structures Care and Restoration of Property Unauthorized Excavation Elimination of Unsuitable Material Disposal of Surplus Excavated Materials Dust Control Bridging Trenches Backfilling - General Fill and Backfill Under Structures Backfilling Around Structures Backfilling Pipe Trenches Material for Filling and Embankments Preparation of Subgrade Placing and Compacting Embankment Material
Appears in 3 contracts
Samples: Agreement, Agreement, Elevator Constructors
Sawcutting. Any sawcutting required for the sidewalk, roadways and driveways shall be performed by the Contractor utilizing a water cooled saw, as indicated on the plans, or as directed by the Engineer. EARTH EXCAVATIONEarth Excavation, BACKFILLBackfill, FILLFill, AND GRADING and Grading General Description Extent of Open Excavation Separation of Surface Materials Sheeting and Bracing Trench Excavation Depth of Trench Width of Trench Trench Excavation in Fill Excavation Near Existing Structures Protection of Existing Structures Relocation and Replacement of Existing Structures Care and Restoration of Property Unauthorized Excavation Elimination of Unsuitable Material Disposal of Surplus Excavated Materials Dust Control Bridging Trenches Backfilling - General Fill and Backfill Under Structures Backfilling Around Structures Backfilling Pipe Trenches Material for Filling and Embankments Preparation of Subgrade Placing and Compacting Embankment Material
Appears in 1 contract
Samples: greenfield-ma.gov