Sequence Control Sample Clauses

Sequence Control. The Sequence Control field has two formats: One for beacon, command, data and aggregated data frames and another for control frames. It is reserved for concatenated data frames. For beacon, command, data and aggregated data frames, the sequence control field identifies the order of MSDUs/XXXXx and their fragments, and is illustrated in Figure 12. Reserved More Fragments Sequence Number Fragment Number For control frames, the Sequence Control field provides link feedback information, and is illustrated in Figure 13 and Figure 14. Depending on Link Feedback Type requested by the transmitter, the receiver shall respond with either the Power Adjust/ Data Rate format (Figure 13), or LQI/RSSI Measure (Figure 14). The Link Feedback Type is specified either in the DRP IE (for DRP traffic, see 7.9.7), or by a dedicated Link Feedback Type command frame (for PCA traffic, but may also be used for DRP).”
AutoNDA by SimpleDocs

Related to Sequence Control

  • Erosion Control a. The Purchaser shall construct slash and debris erosion barriers, dips, water bars or ditches in skid trails and landings as directed by the Forest Officer. b. The kinds and frequency of erosion control structures shall be adjusted to soil types, topography and climatic conditions as directed by the Forest Officer. c. The Purchaser is required to recontour any excavated skid trails, and provide for effective erosion control in the trail location as directed by the Forest Officer. d. Erosion control work shall commence as soon as skidding is completed on each skid trail or landing, and must be kept current with unit operations. e. Erosion control work shall be completed and approved by the Forest Officer in unfinished units before operations cease for inactive periods including heavy winter snowfall, spring breakup and restricted dates. f. All erosion control work in each unit shall be completed prior to notification pursuant to Section VII.M.7.

  • Weed Control The tenant shall control all noxious weeds on the subject lands and maintain any summerfallow in a reasonably weed free condition.

  • Access Control Supplier will maintain an appropriate access control policy that is designed to restrict access to Accenture Data and Supplier assets to authorized Personnel. Supplier will require that all accounts have complex passwords that contain letters, numbers, and special characters, be changed at least every 90 days, and have a minimum length of 8 characters.

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Data Access Control Persons entitled to use data processing systems gain access only to the Personal Data that they have a right to access, and Personal Data must not be read, copied, modified or removed without authorization in the course of processing, use and storage.

  • Network Access Control The VISION Web Site and the Distribution Support Services Web Site (the “DST Web Sites”) are protected through multiple levels of network controls. The first defense is a border router which exists at the boundary between the DST Web Sites and the Internet Service Provider. The border router provides basic protections including anti-spoofing controls. Next is a highly available pair of stateful firewalls that allow only HTTPS traffic destined to the DST Web Sites. The third network control is a highly available pair of load balancers that terminate the HTTPS connections and then forward the traffic on to one of several available web servers. In addition, a second highly available pair of stateful firewalls enforce network controls between the web servers and any back-end application servers. No Internet traffic is allowed directly to the back-end application servers. The DST Web Sites equipment is located and administered at DST’s Winchester data center. Changes to the systems residing on this computer are submitted through the DST change control process. All services and functions within the DST Web Sites are deactivated with the exception of services and functions which support the transfer of files. All ports on the DST Web Sites are disabled, except those ports required to transfer files. All “listeners,” other than listeners required for inbound connections from the load balancers, are deactivated. Directory structures are “hidden” from the user. Services which provide directory information are also deactivated.

  • Climate Control a. The air conditioning/heating units shall be functional at all times. b. The air discharged from the air conditioner interior vent system shall be continuously cool. c. All air conditioning temperature controls and functions shall operate as originally designed and manufactured with no knobs or components broken or missing. d. Systems shall operate on all OEM speeds with no excessive noise.

  • Site Control In the total loss of building use scenario, what likely exists will be a smoking pile of rubble. This rubble will contain many components that could be dangerous. It could also contain any personnel on the premises at the time of the disaster. For these reasons, the local fire marshal with the assistance of the police will control the site until the building is no longer a threat to surrounding properties and the companies have secured the site from the general public. During this time, the majority owner of the building should be arranging for a demolition contractor to mobilize to the site with the primary objective of reaching the cable entrance facility for a damage assessment. The results of this assessment would then dictate immediate plans for restoration, both short term and permanent. In a less catastrophic event, i.e., the building is still standing and the cable entrance facility is usable, the situation is more complex. The site will initially be controlled by local authorities until the threat to adjacent property has diminished. Once the site is returned to the control of the companies, the following events should occur. An initial assessment of the main building infrastructure systems (mechanical, electrical, fire and life safety, elevators, and others) will establish building needs. Once these needs are determined, the majority owner should lead the building restoration efforts. There may be situations where the site will not be totally restored within the confines of the building. The companies must individually determine their needs and jointly assess the cost of permanent restoration to determine the overall plan of action. Multiple restoration trailers from each company will result in the need for designated space and installation order. This layout and control is required to maximize the amount of restoration equipment that can be placed at the site, and the priority of placements. Care must be taken in this planning to ensure other restoration efforts have logistical access to the building. Major components of telephone and building equipment will need to be removed and replaced. A priority for this equipment must also be jointly established to facilitate overall site restoration. (Example: If the AC switchgear has sustained damage, this would be of the highest priority in order to regain power, lighting, and HVAC throughout the building.) If the site will not accommodate the required restoration equipment, the companies would then need to quickly arrange with local authorities for street closures, rights of way or other possible options available.

  • System Access Control Data processing systems used to provide the Cloud Service must be prevented from being used without authorization.

  • Compliance Control Services (1) Support reporting to regulatory bodies and support financial statement preparation by making the Fund's accounting records available to the Trust, the Securities and Exchange Commission (the “SEC”), and the independent accountants. (2) Maintain accounting records according to the 1940 Act and regulations provided thereunder. (3) Perform its duties hereunder in compliance with all applicable laws and regulations and provide any sub-certifications reasonably requested by the Trust in connection with any certification required of the Trust pursuant to the Xxxxxxxx-Xxxxx Act of 2002 (the “SOX Act”) or any rules or regulations promulgated by the SEC thereunder, provided the same shall not be deemed to change USBFS’s standard of care as set forth herein. (4) Cooperate with the Trust’s independent accountants and take all reasonable action in the performance of its obligations under this Agreement to ensure that the necessary information is made available to such accountants for the expression of their opinion on the Fund’s financial statements without any qualification as to the scope of their examination.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!