SEWER AND PRESSURE LINES Sample Clauses

SEWER AND PRESSURE LINES. In addition to inspection required in Paragraph 4b above:
AutoNDA by SimpleDocs

Related to SEWER AND PRESSURE LINES

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Meters 7.1.1 For installation of Meters, Meter testing, Meter calibration and Meter reading and all matters incidental thereto, the SPD and SECI shall follow and be bound by the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, the Grid Code, as amended and revised from time to time.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Heating The Hirer shall ensure that no unauthorised heating appliances shall be used on the premises when open to the public without the consent of the management committee. Portable Liquefied Propane Gas (LPG) heating appliances shall not be used.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.