Sewer Service. 4.7.1 The Developer (including any partnership of Developers), at its sole expense, shall develop and construct the sewer extensions, mains and laterals as necessary to service the new development(s) and the increased capacity resulting therefrom. 4.7.2 The Developer shall also be responsible and pay for the reasonable expense incurred by the City towards development of the developer’s sewer extension and negotiations of this agreement including but not limited to attorney fees and condemnation cost and expenses. 4.7.3 The design, route and specifications of said extensions, mains and laterals shall be approved in writing by the City Engineer. 4.7.4 The Developer shall not attach said sewer extension and/or main to the City’s interceptor sewer system, (including pump stations and/or sewage plant) without the written authority or permission of the Public Works Department to do so. This agreement shall not be construed or interpreted in any way whatsoever as the granting of the authority or permission to attach to, “tie in” and/or “hook on” to the City’s interceptor sewer system without the express written authorization of the Public Works Department to do so. 4.7.5 The sewage system improvements required for the Subdivision, complete with necessary pump stations, force mains and manholes, shall be approved by the State of Tennessee Department of Environment and Conservation. 4.7.6 The Developer shall provide all sewer mains and manholes as provided for in the Subdivision Plans and specifications. 4.7.7 The Developer shall provide all sewer laterals from the sewer main to the front property line of each Lot as approved by the City Engineer and provided for in the Subdivision Plans and specifications, including, but not limited to connection to the main and service pipe with plug. The utility trench created across any existing streets shall be backfilled full depth with flowable concrete fill along with asphalt service equal to the existing pavement section, or as directed by the Public Works Department. 4.7.8 The Developer shall pay the cost of all engineering, inspection and laboratory testing incidental to the sewer service in or to the subdivision. 4.7.9 The building permits for the Subdivision shall be withheld until the above stipulations are met in their entirety. 4.7.10 Sewer connection fee, per lot is $500 (collected from the builder). Property located in the North Fork Creek Sewer Area is subject to a development fee of the greater of $3,000 per acre, or $1,200 per connection. 4.7.11 For all connections made to the main sewer line or any lateral lines other than those served by the North Fork Creek sewer outfall line, the sewer development charge shall be $1,500.00 per connection.

Appears in 5 contracts

Samples: Residential Subdivision Development Agreement, Non Residential Subdivision Development Agreement, Residential Subdivision Development Agreement

AutoNDA by SimpleDocs

Sewer Service. 4.7.1 The Developer (including any partnership of Developers), at its sole expense, shall develop and construct the sewer extensions, mains and laterals as necessary to service the new development(s) and the increased capacity resulting therefrom. 4.7.2 The Developer shall also be responsible and pay for the reasonable expense incurred by the City towards development of the developer’s sewer extension and negotiations of this agreement including but not limited to attorney fees and condemnation cost and expenses. 4.7.3 The design, route and specifications of said extensions, mains and laterals shall be approved in writing by the City Engineer. 4.7.4 The Developer shall not attach said sewer extension and/or main to the City’s interceptor sewer system, (including pump stations and/or sewage plant) without the written authority or permission of the Public Works Department to do so. This agreement shall not be construed or interpreted in any way whatsoever as the granting of the authority or permission to attach to, “tie in” and/or “hook on” to the City’s interceptor sewer system without the express written authorization of the Public Works Department to do so. 4.7.5 The sewage system improvements required for the SubdivisionSite Plan, complete with necessary pump stations, force mains and manholes, shall be approved by the State of Tennessee Department of Environment and Conservation. 4.7.6 The Developer shall provide all sewer mains and manholes as provided for in the Subdivision Site Plan Plans and specifications. 4.7.7 The Developer shall provide all sewer laterals from the sewer main to the front property line of each Lot as approved by the City Engineer and provided for in the Subdivision Site Plan Plans and specifications, including, but not limited to connection to the main and service pipe with plug. The utility trench created across any existing streets shall be backfilled full depth with flowable concrete fill along with asphalt service equal to the existing pavement section, or as directed by the Public Works Department. 4.7.8 The Developer shall pay the cost of all engineering, inspection and laboratory testing incidental to the sewer service in or to the subdivisionSite Plan. 4.7.9 The building permits for the Subdivision Site Plan shall be withheld until the above stipulations are met in their entirety. 4.7.10 Sewer connection fee, per lot is $500 (collected from the builder)500. Property located in the North Fork Creek Sewer Area is subject to a development fee of the greater of $3,000 per acre, or with a minimum of $1,200 for any on lot. Commercial Property is subject to an additional development fee of $5.00 per connection. 4.7.11 For all linear foot of street frontage. Sewer connections made to the main sewer line or any lateral lines other than those served by the North Fork Creek sewer Sewer outfall line, whether for residential, industrial, multi-dwelling or commercial use, the sewer development charge shall be the greater of $1,500.00 1,250.00 per acre or $500.00 per connection.

Appears in 4 contracts

Samples: Non Residential Site Plan Development Agreement, Non Residential Site Plan Development Agreement, Non Residential Site Plan Development Agreement

Sewer Service. 4.7.1 The Developer (including any partnership of Developers), at its sole expense, shall develop and construct the sewer extensions, mains and laterals as necessary to service the new development(s) and the increased capacity resulting therefrom. 4.7.2 The Developer shall also be responsible and pay for the reasonable expense incurred by the City towards development of the developer’s sewer extension and negotiations of this agreement including but not limited to attorney fees and condemnation cost and expenses. 4.7.3 The design, route and specifications of said extensions, mains and laterals shall be approved in writing by the City Engineer. 4.7.4 The Developer shall not attach said sewer extension and/or main to the City’s interceptor sewer system, (including pump stations and/or sewage plant) without the written authority or permission of the Public Works Department to do so. This agreement shall not be construed or interpreted in any way whatsoever as the granting of the authority or permission to attach to, “tie in” and/or “hook on” to the City’s interceptor sewer system without the express written authorization of the Public Works Department to do so. 4.7.5 The sewage system improvements required for the Subdivision, complete with necessary pump stations, force mains and manholes, shall be approved by the State of Tennessee Department of Environment and Conservation. 4.7.6 The Developer shall provide all sewer mains and manholes as provided for in the Subdivision Plans and specifications. 4.7.7 The Developer shall provide all sewer laterals from the sewer main to the front property line of each Lot as approved by the City Engineer and provided for in the Subdivision Plans and specifications, including, but not limited to connection to the main and service pipe with plug. The utility trench created across any existing streets shall be backfilled full depth with flowable concrete fill along with asphalt service equal to the existing pavement section, or as directed by the Public Works Department. 4.7.8 The Developer shall pay the cost of all engineering, inspection and laboratory testing incidental to the sewer service in or to the subdivision. 4.7.9 The building permits for the Subdivision shall be withheld until the above stipulations are met in their entirety. 4.7.10 Sewer connection fee, per lot is $500 (collected from the builder). Property located in the North Fork Creek Sewer Area is subject to a development fee of the greater of $3,000 per acre, or $1,200 per connection. Commercial Property is subject to an additional development fee of $5.00 per linear foot of street frontage. 4.7.11 For all connections made to the main sewer line or any lateral lines other than those served by the North Fork Creek sewer outfall line, the sewer development charge shall be the greater of $1,500.00 1,250.00 per acre or $500.00 per connection.

Appears in 2 contracts

Samples: Residential Subdivision Development Agreement, Residential Subdivision Development Agreement

Sewer Service. 4.7.1 The Developer (including any partnership of Developers), at its sole expense, shall develop and construct the sewer extensions, mains and laterals as necessary to service the new development(s) and the increased capacity resulting therefrom. 4.7.2 The Developer shall also be responsible and pay for the reasonable expense incurred by the City towards development of the developer’s sewer extension and negotiations of this agreement including but not limited to attorney fees and condemnation cost and expenses. 4.7.3 The design, route and specifications of said extensions, mains and laterals shall be approved in writing by the City Engineer. 4.7.4 The Developer shall not attach said sewer extension and/or main to the City’s interceptor sewer system, (including pump stations and/or sewage plant) without the written authority or permission of the Public Works Department to do so. This agreement shall not be construed or interpreted in any way whatsoever as the granting of the authority or permission to attach to, “tie in” and/or “hook on” to the City’s interceptor sewer system without the express written authorization of the Public Works Department to do so. 4.7.5 The sewage system improvements required for the Subdivision, complete with necessary pump stations, force mains and manholes, shall be approved by the State of Tennessee Department of Environment and Conservation. 4.7.6 The Developer shall provide all sewer mains and manholes as provided for in the Subdivision Plans and specifications. 4.7.7 The Developer shall provide all sewer laterals from the sewer main to the front property line of each Lot as approved by the City Engineer and provided for in the Subdivision Plans and specifications, including, but not limited to connection to the main and service pipe with plug. The utility trench created across any existing streets shall be backfilled full depth with flowable concrete fill along with asphalt service equal to the existing pavement section, or as directed by the Public Works Department. 4.7.8 The Developer shall pay the cost of all engineering, inspection and laboratory testing incidental to the sewer service in or to the subdivision. 4.7.9 The building permits for the Subdivision shall be withheld until the above stipulations are met in their entirety. 4.7.10 Sewer connection fee, per lot is $500 (collected from the builder). Property located in the North Fork Creek Sewer Area is subject to a development fee of the greater of $3,000 per acre, or $1,200 per connection. 4.7.11 For all connections made to the main sewer line or any lateral lines other than those served by the North Fork Creek sewer outfall line, whether for residential, industrial, multi-dwelling or commercial use, the sewer development charge shall be $1,500.00 $ 500.00 per connection. 4.7.11 Sewer Development Charge, For all connections made to the main sewer line or any lateral lines of the North Fork Creek sewer outfall line, whether for residential, industrial, multi-dwelling or commercial use, the sewer development charge shall be the greater of three thousand dollars ($3,000.00) per acre or one thousand two hundred dollars ($1,200.00) per connection. For all connections made to the main sewer line or any lateral lines other than those served by the North Fork Creek sewer outfall line, whether for residential, industrial, multi-dwelling or commercial use, the sewer development charge shall be the greater of one thousand two hundred dollars ($1,250.00) per acre or five hundred dollars.

Appears in 1 contract

Samples: Non Residential Site Plan Agreement

Sewer Service. 4.7.1 The Developer (including any partnership of Developers), at its sole expense, shall develop and construct the sewer extensions, mains and laterals as necessary to service the new development(s) and the increased capacity resulting therefrom. 4.7.2 The Developer shall also be responsible and pay for the reasonable expense incurred by the City towards development of the developer’s sewer extension and negotiations of this agreement including but not limited to attorney fees and condemnation cost and expenses. 4.7.3 The design, route and specifications of said extensions, mains and laterals shall be approved in writing by the City Engineer. 4.7.4 The Developer shall not attach said sewer extension and/or main to the City’s interceptor sewer system, (including pump stations and/or sewage plant) without the written authority or permission of the Public Works Department to do so. This agreement shall not be construed or interpreted in any way whatsoever as the granting of the authority or permission to attach to, “tie in” and/or “hook on” to the City’s interceptor sewer system without the express written authorization of the Public Works Department to do so. 4.7.5 The sewage system improvements required for the Subdivision, complete with necessary pump stations, force mains and manholes, shall be approved by the State of Tennessee Department of Environment and Conservation. 4.7.6 The Developer shall provide all sewer mains and manholes as provided for in the Subdivision Plans and specifications. 4.7.7 The Developer shall provide all sewer laterals from the sewer main to the front property line of each Lot as approved by the City Engineer and provided for in the Subdivision Plans and specifications, including, but not limited to connection to the main and service pipe with plug. The utility trench created across any existing streets shall be backfilled full depth with flowable concrete fill along with asphalt service equal to the existing pavement section, or as directed by the Public Works Department. 4.7.8 The Developer shall pay the cost of all engineering, inspection and laboratory testing incidental to the sewer service in or to the subdivision. 4.7.9 The building permits for the Subdivision shall be withheld until the above stipulations are met in their entirety. 4.7.10 Sewer connection fee, per lot is $500 (collected from the builder). Property located in the North Fork Creek Sewer Area is subject to a development fee of the greater of $3,000 per acre, or $1,200 per connection. 4.7.11 For all connections made to the main sewer line or any lateral lines other than those served by the North Fork Creek sewer outfall line, whether for residential, industrial, multi-dwelling or commercial use, the sewer development charge shall be $ 500.00 per connection. 4.7.11 Sewer Development Charge, For all connections made to the main sewer line or any lateral lines other than those served by the North Fork Creek sewer line, the sewer development charge shall be $1,500.00 per connectionconnection or dwelling unit.

Appears in 1 contract

Samples: Non Residential Site Plan Agreement

Sewer Service. 4.7.1 The Developer (including any partnership of Developers), at its sole expense, shall develop and construct the sewer extensions, mains and laterals as necessary to service the new development(s) and the increased capacity resulting therefrom. 4.7.2 The Developer shall also be responsible and pay for the reasonable expense incurred by the City towards development of the developer’s sewer extension and negotiations of this agreement including but not limited to attorney fees and condemnation cost and expenses. 4.7.3 The design, route and specifications of said extensions, mains and laterals shall be approved in writing by the City Engineer. 4.7.4 The Developer shall not attach said sewer extension and/or main to the City’s interceptor sewer system, (including pump stations and/or sewage plant) without the written authority or permission of the Public Works Department to do so. This agreement shall not be construed or interpreted in any way whatsoever as the granting of the authority or permission to attach to, “tie in” and/or “hook on” to the City’s interceptor sewer system without the express written authorization of the Public Works Department to do so. 4.7.5 The sewage system improvements required for the Subdivision, complete with necessary pump stations, force mains and manholes, shall be approved by the State of Tennessee Department of Environment and Conservation. 4.7.6 The Developer shall provide all sewer mains and manholes as provided for in the Subdivision Plans and specifications. 4.7.7 The Developer shall provide all sewer laterals from the sewer main to the front property line of each Lot as approved by the City Engineer and provided for in the Subdivision Plans and specifications, including, but not limited to connection to the main and service pipe with plug. The utility trench created across any existing streets shall be backfilled full depth with flowable concrete fill along with asphalt service equal to the existing pavement section, or as directed by the Public Works Department. 4.7.8 The Developer shall pay the cost of all engineering, inspection and laboratory testing incidental to the sewer service in or to the subdivision. 4.7.9 The building permits for the Subdivision shall be withheld until the above stipulations are met in their entirety. 4.7.10 Sewer connection fee, per lot is $500 (collected from the builder). Property located in the North Fork Creek Sewer Area is subject to a development fee of the greater of $3,000 per acre, or $1,200 per connection. Commercial Property is subject to an additional development fee of $5.00 per linear foot of street frontage. 4.7.11 For all connections made to the main sewer line or any lateral lines other than those served by the North Fork Creek sewer outfall line, the sewer development charge shall be $1,500.00 per connection.

Appears in 1 contract

Samples: Residential Subdivision Development Agreement

AutoNDA by SimpleDocs

Sewer Service. 4.7.1 The Developer (including any partnership of Developers), at its sole expense, shall develop and construct the sewer extensions, mains and laterals as necessary to service the new development(s) and the increased capacity resulting therefrom. 4.7.2 The Developer shall also be responsible and pay for the reasonable expense incurred by the City towards development of the developer’s sewer extension and negotiations of this agreement including but not limited to attorney fees and condemnation cost and expenses. 4.7.3 The design, route and specifications of said extensions, mains and laterals shall be approved in writing by the City Engineer. 4.7.4 The Developer shall not attach said sewer extension and/or main to the City’s interceptor sewer system, (including pump stations and/or sewage plant) without the written authority or permission of the Public Works Department to do so. This agreement shall not be construed or interpreted in any way whatsoever as the granting of the authority or permission to attach to, “tie in” and/or “hook on” to the City’s interceptor sewer system without the express written authorization of the Public Works Department to do so. 4.7.5 The sewage system improvements required for the Subdivision, complete with necessary pump stations, force mains and manholes, shall be approved by the State of Tennessee Department of Environment and Conservation. 4.7.6 The Developer shall provide all sewer mains and manholes as provided for in the Subdivision Plans and specifications. 4.7.7 The Developer shall provide all sewer laterals from the sewer main to the front property line of each Lot as approved by the City Engineer and provided for in the Subdivision Plans and specifications, including, but not limited to connection to the main and service pipe with plug. The utility trench created across any existing streets shall be backfilled full depth with flowable concrete fill along with asphalt service equal to the existing pavement section, or as directed by the Public Works Department. 4.7.8 The Developer shall pay the cost of all engineering, inspection and laboratory testing incidental to the sewer service in or to the subdivision. 4.7.9 The building permits for the Subdivision shall be withheld until the above stipulations are met in their entirety. 4.7.10 Sewer connection development fee, per lot is $500 (collected from the builder). : Property located in the North Fork Creek Sewer Area is subject to a development fee of the greater of $3,000 per acre, or with a minimum of $1,200 for any on lot. Commercial Property is subject to an additional development fee of $5.00 per connection. 4.7.11 For all connections made to linear foot of street frontage. Sewer development fee on the main sewer line or any lateral lines other than those served by the North Fork Creek sewer Sewer outfall line, whether for residential, industrial, multi-dwelling or commercial use, the sewer development charge shall be the greater of $1,500.00 1,250.00 per acre or $500.00 per connection.

Appears in 1 contract

Samples: Subdivision and Non Residential Site Plan Agreement

Sewer Service. 4.7.1 The Developer (including any partnership of Developers), at its sole expense, shall develop and construct the sewer extensions, mains and laterals as necessary to service the new development(s) and the increased capacity resulting therefrom. 4.7.2 The Developer shall also be responsible and pay for the reasonable expense incurred by the City towards development of the developer’s sewer extension and negotiations of this agreement including but not limited to attorney fees and condemnation cost and expenses. 4.7.3 The design, route and specifications of said extensions, mains and laterals shall be approved in writing by the City Engineer. 4.7.4 The Developer shall not attach said sewer extension and/or main to the City’s interceptor sewer system, (including pump stations and/or sewage plant) without the written authority or permission of the Public Works Department to do so. This agreement shall not be construed or interpreted in any way whatsoever as the granting of the authority or permission to attach to, “tie in” and/or “hook on” to the City’s interceptor sewer system without the express written authorization of the Public Works Department to do so. 4.7.5 The sewage system improvements required for the Subdivision, complete with necessary pump stations, force mains and manholes, shall be approved by the State of Tennessee Department of Environment and Conservation. 4.7.6 The Developer shall provide all sewer mains and manholes as provided for in the Subdivision Plans and specifications. 4.7.7 The Developer shall provide all sewer laterals from the sewer main to the front property line of each Lot as approved by the City Engineer and provided for in the Subdivision Plans and specifications, including, but not limited to connection to the main and service pipe with plug. The utility trench created across any existing streets shall be backfilled full depth with flowable concrete fill along with asphalt service equal to the existing pavement section, or as directed by the Public Works Department. 4.7.8 The Developer shall pay the cost of all engineering, inspection and laboratory testing incidental to the sewer service in or to the subdivision. 4.7.9 The building permits for the Subdivision shall be withheld until the above stipulations are met in their entirety. 4.7.10 Sewer connection fee, per lot is $500 (collected from the builder)500. Property located in the North Fork Creek Sewer Area is subject to a development fee of the greater of $3,000 per acre, or with a minimum of $1,200 for any on lot. Commercial Property is subject to an additional development fee of $5.00 per connectionlinear foot of street frontage. 4.7.11 For all connections made to the main sewer line or any lateral lines other than those served by the North Fork Creek sewer outfall line, the sewer development charge shall be $1,500.00 per connection.

Appears in 1 contract

Samples: Non Residential Subdivision Development Agreement

Sewer Service. 4.7.1 The Developer (including any partnership of Developers), at its sole expense, shall develop and construct the sewer extensions, mains and laterals as necessary to service the new development(sProject(s) and the increased capacity resulting therefrom. 4.7.2 The Developer shall also be responsible and pay for the reasonable expense incurred by the City towards development of the developer’s sewer extension and negotiations of this agreement including but not limited to attorney fees and condemnation cost and expenses. 4.7.3 The design, route and specifications of said extensions, mains and laterals shall be approved in writing by the City Engineer. 4.7.4 The Developer shall not attach said sewer extension and/or main to the City’s interceptor sewer system, (including pump stations and/or sewage plant) without the written authority or permission of the Public Works Department to do so. This agreement shall not be construed or interpreted in any way whatsoever as the granting of the authority or permission to attach to, “tie in” and/or “hook on” to the City’s interceptor sewer system without the express written authorization of the Public Works Department to do so. 4.7.5 The sewage system improvements required for the SubdivisionProject, complete with necessary pump stations, force mains and manholes, shall be approved by the State of Tennessee Department of Environment and Conservation. 4.7.6 The Developer shall provide all sewer mains and manholes as provided for in the Subdivision Site Plans and specifications. 4.7.7 The Developer shall provide all sewer laterals from the sewer main to the front property line of each Lot as approved by the City Engineer and provided for in the Subdivision Site Plans and specifications, including, but not limited to connection to the main and service pipe with plug. The utility trench created across any existing streets shall be backfilled full depth with flowable concrete fill along with asphalt service equal to the existing pavement section, or as directed by the Public Works Department. 4.7.8 The Developer shall pay the cost of all engineering, inspection and laboratory testing incidental to the sewer service in or to the subdivisionProject. 4.7.9 The building permits for the Subdivision Project shall be withheld until the above stipulations are met in their entirety. 4.7.10 Sewer connection fee, per lot is $500 (collected from the builder). Property located in the North Fork Creek Sewer Area is subject to a development fee of the greater of $3,000 per acre, or $1,200 per connection. 4.7.11 For all connections made to the main sewer line or any lateral lines other than those served by the North Fork Creek sewer outfall line, the sewer development charge shall be $1,500.00 per connection.

Appears in 1 contract

Samples: Site Development Agreement