Sewerage Impact Sample Clauses

Sewerage Impact. 6.9.1 The existing sewerage system will not be affected by the works of the construction of proposed stormwater pumping station. The new LCSD’s toilet will be permanently relocated to the open space near the Auto Plaza of UCCG and it will be constructed before demolition of the existing LCSD’s toilet. Therefore, the works will not impose any additional sewage flow to the existing sewerage system. The Sewerage Impact Assessment Report is attached in Appendix J.
AutoNDA by SimpleDocs

Related to Sewerage Impact

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Water Provide hot water for lavatory purposes and cold water for drinking, lavatory and toilet purposes.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Sanitary Facilities (as per Occupational Health and Safety [Building Industry] Regulations 1985)

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

Time is Money Join Law Insider Premium to draft better contracts faster.