Partitions In order to ensure maximum privacy for clients and to preserve the attorney-client privilege, the Employer agrees to construct floor to ceiling partitions for the offices of all casehandling staff where architecturally feasible. The feasibility of such construction may be limited by the cost relating to lighting and airflow.
Artwork Licensee must use the Java Logo(s) only in the exact form of approved camera-ready artwork or electronic artwork received from Oracle or Oracle's designee.
Windows a. Front and rear windshield per California Vehicle Code § 26710.
Doors Exterior doors may not be propped open for safety and security reasons. Students may be referred to the student conduct system if found propping these doors. Doors marked as emergency exits may only be used for emergency purposes other than during University-sanctioned move-in days.
Restrooms The restrooms, toilets, urinals, vanities and the other apparatus shall not be used for any purpose other than that for which they were constructed, and no foreign substance of any kind whatsoever shall be thrown therein. The expense of any breakage, stoppage or damage resulting from the violation of this rule shall be borne by the Tenant whom, or whose employees or invitees, shall have caused it.
Wash all machine-washable bedding, drapes, and clothing, on the hottest water temperature and dry on the highest heat setting. Items that cannot be washed must be taken to a dry cleaner who MUST be informed of the issue. You must safely discard ALL items that cannot be decontaminated.
FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.
Painting All exterior surfaces and materials requiring paint shall be prime coated plus 2 coats of Xxxxxxx Xxxxxxxx Pro-Mar alkyd flat exterior finish, or Xxxxxxx-Xxxxxxxx SWP exterior gloss paint. All porous exterior surfaces (e.g. unpainted wood) shall be sealed with 2 coats of Xxxxxxxx’x Water Seal following the manufacturers application instructions. Interior surfaces requiring paint shall be prime coated plus 2 coats of Xxxxxxx Xxxxxxxx Pro-Mar Latex Eg-Shel enamel. Concrete block walls shall receive 1 coat of Xxxxxxx Xxxxxxxx Pro-Mar Block Filler and 2 coats of Xxxxxxx Xxxxxxxx Pro-Mar latex Eg-Shel enamel. Interior finishes and color selections shall be approved by the State. A schedule of colors and finishes shall be prepared by the Owner/Lessor and approved by the State.
Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;
Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;