SIT‐UP TEST Sample Clauses

SIT‐UP TEST. This test indicates the muscular endurance of the abdominal muscle group, an area of important concern.
AutoNDA by SimpleDocs
SIT‐UP TEST. Employee has one (1) minute to complete as many sit-ups as possible. In each of these three tests a “meets” standard will be given to employees who attain the 50th percentile, or above, of the Xxxxxx Institute’s physical fitness Dynamic Strength Norms.

Related to SIT‐UP TEST

  • Follow-up Testing An employee shall submit to unscheduled follow-up drug and/or alcohol testing if, within the previous 24-month period, the employee voluntarily disclosed drug or alcohol problems, entered into or completed a rehabilitation program for drug or alcohol abuse, failed or refused a preappointment drug test, or was disciplined for violating the provisions of this Agreement and Employer work rules. The Employer may require an employee who is subject to follow-up testing to submit to no more than six unscheduled drug or alcohol tests within any 12 month period.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Repair Testing At the time of repair of a LIS trunk group, at no additional charge, tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Correction Period (1) End of correction period. The last day of the correction period for an Operational Failure is the last day of the second plan year following the plan year for which the failure occurred. However, in the case of a failure to satisfy the requirements of § 401(k)(3), 401(m)(2), or 401(m)(9), the correction period does not end until the last day of the second plan year following the plan year that includes the last day of the additional period for correction permitted under § 401(k)(8) or 401(m)(6). If a 403(b) Plan does not have a plan year, the plan year is deemed to be the calendar year for purposes of this subsection.

  • WORKING TEST PERIOD Section One. The Working Test Period shall be deemed an extension of the examination process. Therefore, a determination of unsatisfactory performance during a Working Test Period shall be tantamount to a failure of the competitive exam.

  • Positive Test results for Antibiotics AFTER Milk is collected and has caused the TANKER TO RETURN A POSITIVE RESULT . UPON CUSTOMER RISK ASSESSMENT , MILK IS ACCEPTED. Supplier will not be paid for this Milk as it has tested positive for antibiotics and is deemed to be in breach of ACM Food Safety Program (see part 6.1 for details) and Milk Quality Standards (see Table 3.1). For all positive samples (vat or Tanker) Milk collection will be suspended until a negative sample is achieved. Any subsequent positive vat samples taken during this process will not be paid for. Only after a negative sample is achieved, will ACM schedule Milk for collection. Supplier will be required to complete a CAR (Corrective Action Report) which is a requirement of ACM’s Food Safety Program. Refer to section 4.3 Management of Non‐Conformance ‐ Incident Report in the ACM Food Safety Program manual.

  • Non-Paid Status During Treatment After Positive Test The employee will be in a non-pay status during any absence for evaluation or treatment, while participating in a rehabilitation program.

Time is Money Join Law Insider Premium to draft better contracts faster.