Site Visits The Commission may visit the School at any time and may, at its discretion, conduct site visits and monitoring. When appropriate, the Commission shall make reasonable efforts to provide notice of visits. Such site visits may include any activities reasonably related to fulfillment of the Commission’s oversight responsibilities including, but not limited to, inspection of the facilities; audit of financial books and records; inspection of records maintained by the School; interviews and observations of the principal, staff, school families, staff of an affiliated nonprofit or educational service provider and community members; and observation of classroom instruction.
Site Visit 7.1 The Tenderer, at the Tenderer's own responsibility and risk, is encouraged to visit and examine and inspect the Site of the Required Services and its surroundings and obtain all information that may be necessary for preparing the Tender and entering in to a contract for the Services. The costs of visiting the Site shall beat the Tenderer's own expense.
Site Work An expansion of the Connecting Transmission Owner’s Boonville Station is required to accommodate the CTOIFs. The southern corner of the fence line will be expanded out by approximately 3,200 square feet. The Connecting Transmission Owner already owns the property required for the expansion. Approximately 120 feet of the existing fencing will need to be removed and approximately 150 feet of new fencing added.
Site Maintenance The authorized area shall be maintained in a neat, clean, and safe condition, free of any solid waste, debris, or litter, except as specifically authorized herein.
Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ
Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.
System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.
PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.
Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.
Sites Sites shall mean the locations set forth in the Contract Documentation.