Site Related Issues. (a) The heritage lands will be required to contain and dispose of site generated storm water on the site by installing a ground recharge system consisting of drywells and perforated pipe bedded in drain rock.
(b) The owner will direct the carriage house roof drain splash pads away from the rear lane or into an on-site rock pit in order to help dissipate the roof drain water and prevent additional concentrated flow onto the lane.
Site Related Issues. (a) The development will be required to contain and dispose of site generated storm water on the site by installing a ground recharge.
(b) Adequate dust free off-street parking must be provided.
Site Related Issues. The Owner shall obtain the necessary permits and have all existing utility services disconnected prior to moving the Xxxxxx-Games House.
Site Related Issues. On-site parking stalls must meet Zoning Bylaw No. 8000 requirements. The Owner shall ensure that the roof drains shall be directed into on-site rock pits. The Owner shall provide a designated, lit, unobstructed emergency access path from the frontage road to the main entrance of the proposed suite located in the accessory building.
Site Related Issues. The Heritage Revitalization Agreement Application does not compromise Works and Utilities requirements.