STAGE ONE AND STAGE TWO STATEMENTS. (a) Stage One Statement of Geotechnical Engineer: I, the undersigned registered geotechnical engineer, have made a visual inspection and subsurface investigation at the project site and, based upon my analysis of (i) soil and test borings, (ii) geophysical observations and testing, (iii) surveys, and (iv) electrical resistivity tests made as I deemed necessary in my professional judgment to be suitable or advisable to the end that all subsurface conditions that might necessitate redesign or Change Orders during construction if not taken into consideration in the design of the work or provided for in the Bidding Documents, I find that:
Appears in 24 contracts
Samples: Design Professional Contract, www.usg.edu, Design Professional Contract
STAGE ONE AND STAGE TWO STATEMENTS. (a) Stage One Statement of Geotechnical Engineer: I, the undersigned registered geotechnical engineer, have made a visual inspection and subsurface investigation at the project site and, based upon my analysis of (i) soil and test borings, (ii) geophysical observations and testing, (iii) surveys, and (iv) electrical resistivity tests made as I deemed necessary in my professional judgment to be suitable or advisable to the end that all subsurface conditions that might necessitate redesign or Change Orders during construction if not taken into consideration in the design of the work or provided for in the Bidding Proposal Documents, I find that:
Appears in 20 contracts
Samples: www.usg.edu, www.usg.edu, Design Professional Contract