Record Drawings and Final Documents Sample Clauses

Record Drawings and Final Documents. The Design Professional shall, upon final completion of the Project, revise the Bidding Documents based upon documents incorporated by Change Orders, additional sketches, field changes, answered RFI’s issued by the Design Professional, and marked-up documents provided by the Contractor to show the Project “as built.” The Design Professional shall furnish and deliver the Record Drawings to the Owner after the entire work is completed and not later than sixty calendar days after execution of its Certificate of Final Completion. Record Drawings and Final Documents shall reflect all changes caused by addenda, field changes, Change Orders, or observed changes by the Design Professional, the Contractor, or Subcontractors. The Design Professional shall furnish the Owner, at no additional cost, three bound sets of specifications, complete with all addenda and authorized Change Orders, and the following sets of Contract Drawings: (a) One set of full-size reproducible documents; (b) Three sets of full-size blue or black line prints; and (c) Electronic media (CD-ROM including CADD) files in PDF format, Autodesk DWF format, or other electronic media approved by the Owner. Based upon additional information provided by the Contractor, the Record Drawings and Final Documents shall show the Design Professional’s understanding of the locations of all utility lines and shall be altered to conform to all changes made in the building during its construction. The Design Professional shall furnish additional copies of the aforesaid documents or reproducible documents as requested by Owner, for which the Owner shall pay the actual cost of reproduction.
AutoNDA by SimpleDocs
Record Drawings and Final Documents. The Design Professional shall, upon final completion of the Project, revise the original drawings and specifications based upon documents incorporated by Change Orders, additional sketches, answered RFI’s and marked up documents provided by the Contractor to show the project “as built”. The Design Professional shall furnish and deliver the Record Drawings to the Owner not later than sixty (60) calendar days after execution of its Certificate of Final Completion. Record Drawings and Final Documents shall reflect all changes caused by addenda, field changes, change orders or observed changes by the Design Professional, the Contractor, or subcontractor(s) made in the building during its construction, and shall show the Design Professional’s understanding of the locations of all utility lines to the extent such observations are communicated in writing to the Design Professional. The Design Professional shall furnish the Owner, the following sets of Contract Drawings: • One set of full-size reproducible documents, or half size as required per task. • Electronic media (CD-ROM including CADD) files in PDF Format and AutoCAD • Provide the Archive Entry_Sheet.XLS filled out for all documents provided at close out.
Record Drawings and Final Documents. The Design Builder shall, upon final completion of the Project, revise the original drawings and specifications based upon documents incorporated by Change Orders, additional sketches, answered RFI’s and marked up documents provided by the Design-Builder to show the project “as built”. The Design Builder shall furnish and deliver to the Owner after the entire work is completed, and not later than sixty (60) calendar days after execution of its Certificate of Final Completion, the Record Drawings. (Record Drawings and Final Documents shall reflect all changes caused by addenda, field changes, change orders or observed changes by the Design Builder, the Design-Builder or the subcontractor(s). The Design Builder shall furnish the Owner, at no additional cost, three bound sets of specifications, complete with all addenda and authorized Change Orders and the following sets of Contract Drawings: (a) One set of full-size reproducible documents, (b) Three sets of full-size blue or black line prints, and (c) Digital media including CADD files in PDF, Autocad, Autoview or other approved equal Based upon additional information provided by the Design-Builder, the Record Drawings and Final Documents (collectively the “Record Documents”) shall show the Design Builder’s understanding of the locations of all utility lines and shall be altered to conform to all changes made in the building during its construction. The Design Builder shall furnish additional copies of the aforesaid documents or reproducible documents as requested by Owner, for which the Owner shall pay the actual cost of reproduction.
Record Drawings and Final Documents. The Design Professional shall, upon final completion of the Project, revise the original drawings and specifications based upon documents incorporated by Change Orders, additional sketches, answered RFI’s and marked up documents provided by the CM/GC to show the project “as built”. The Design Professional shall furnish and deliver to the Owner after the entire work is completed, and not later than sixty (60) calendar days after execution of its Certificate of Final Completion, the Record Drawings. (Record Drawings and Final Documents shall reflect all changes caused by addenda, field changes, change orders or observed changes by the Design Professional, the CM/GC or the subcontractor(s) to the extend such CM/GC or Subcontractor observations are communicated in writing to the Design Professional. The Design Professional shall furnish the Owner, at no additional cost, three bound sets of specifications, complete with all addenda and authorized Change Orders and the following sets of Contract Drawings: (a) One set of full-size reproducible documents, (b) Three sets of full-size blue or black line prints, and (c) Electronic media (CD-ROM including CADD) files in PDF Format or Autoview Format or AutoCAD) or other approved equal Based upon additional information provided by the CM/GC, the Record Drawings and Final Documents shall show the Design Professional’s understanding of the locations of all utility lines and shall be altered to conform to all changes made in the building during its construction. The Design Professional shall furnish additional copies of the aforesaid documents or reproducible documents as requested by Owner, for which the Owner shall pay the actual cost of reproduction.
Record Drawings and Final Documents. Upon Interim Punchlist Completion, the Design Professional shall revise the original Construction Documents based upon documents incorporated by Change Orders, additional sketches, answered RFIs and as-built documents provided by the CM/GC to show the Project “as built” (“Record Drawings”). The Design Professional shall furnish and deliver to the Owner the Record Drawings within sixty (60) days of Interim Punchlist Completion. The Design Professional shall furnish the Owner, at no additional cost, up to three (3) bound sets of Record Drawings and an electronic copy in such format as required by the Owner. Record Drawings must be sealed by the Architect of Record. WARRANTY PHASE SERVICES Warranty Complaint Review. During the year following Material Completion, the CM/GC is required to remedy any Non-Compliant work upon the receipt of a Warranty Complaint, unless the Warranty Complaint is a result of a design defect or Using Agency abuse. A Design Professional’s Decision will be issued as to whether the Warranty Complaint is a result of a design defect or user abuse. One Year Walk-Through. After Material Completion and prior to Final Completion, Design Professional shall attend a walk-through with the Using Agency and Owner to observe and evaluate the function of building systems to identify actual and potential warranty items, as well as any deficiencies or defects that require correction.

Related to Record Drawings and Final Documents

  • Record Documents The Prime Consultant shall prepare and file record documents of the project with Milwaukee County DEPT. OF ADMINISTRATIVE SERVICES - FACILITIES MANAGEMENT DIVISION, as per this attachment. Prime Consultant agreement close-out and final payment will be contingent on approval of complete record document submittal by Prime Consultant.