Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.
Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.
Interconnection 2.1 This section applies to linking with suppliers providing public telecommunications transport networks or services in order to allow the users of one supplier to communicate with users of another supplier and to access services provided by another supplier, where specific commitments are undertaken.
Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.
Electrical Power Corporation shall provide Contractor with convenient access to electrical power required to perform the work. The electrical outlets used by Contractor shall be those designated or approved by Corporation.
Wastewater investments in the construction, material enhancement, or renewal of infrastructure that supports wastewater and storm water collection, treatment, and management systems. Note: Investments in health infrastructure (e.g., hospitals, long-term care facilities, convalescent centres, and senior centres) are not eligible. Eligible Expenditures will be limited to the following: 1. Infrastructure investments – expenditures associated with acquiring, planning, designing, constructing, or renovating a tangible capital asset and any related debt financing charges specifically identified with that asset. 2. Capacity-building costs – for projects eligible under the capacity-building category only, expenditures associated with the development and implementation of: • Capital investment plans, integrated community sustainability plans, integrated regional plans, housing needs assessments, or asset management plans; • Studies, strategies, systems, software, third-party assessments, plans, or training related to asset management; • Studies, strategies, systems, or plans related to housing or land use; • Studies, strategies, or plans related to the long-term management of infrastructure; and • Other initiatives that strengthen the Recipient’s ability to improve local and regional planning. 3. Joint communications and signage costs – expenditures directly associated with joint federal communication activities and with federal project signage.
Environmental Management (a) The Operator must, prior to the commencement of any Train Services (including any new or varied Train Services): (i) cause a suitably qualified person reasonably acceptable to both Parties to prepare a report (“Environmental Investigation and Risk Management Report”) containing an environmental investigation component and an environmental risk management component which respectively identify: (A) possible risks of Environmental Harm arising out of the proposed use of the Nominated Network by the Operator, including risks associated with those matters identified in Part 3 of Schedule 6; and (B) the manner in which the Operator proposes to address the possible risks of Environmental Harm identified in the Environmental Investigation and Risk Management Report as well as the roles and responsibilities, including financial responsibility, for the control measures proposed and an audit regime, provided that if the Operator has an existing Environmental Management System it proposes to use in connection with the proposed Train Services on the Nominated Network, the Environmental Investigation and Risk Management Report should also detail the extent to which the Operator believes its existing Environmental Management System addresses the risks identified in the Environmental Investigation and Risk Management Report; and (ii) provide a copy of the Environmental Investigation and Risk Management Report to Aurizon Network for its consideration and, if requested by Aurizon Network, a copy of the relevant parts of the Operator’s existing Environmental Management System referred to in the Environmental Investigation and Risk Management Report. (b) If the Environmental Investigation and Risk Management Report discloses areas of risk which, in the reasonable opinion of Aurizon Network, cannot be adequately managed by the proposals set out in the Environmental Investigation and Risk Management Report or, in the reasonable opinion of Aurizon Network, fails to identify and adequately deal with additional relevant environmental risks, then Aurizon Network may give notice to that effect to the Operator within thirty (30) days after the date on which the Environmental Investigation and Risk Management Report was received by Aurizon Network (or such other period as the Parties, acting reasonably, may agree), detailing the risks not so adequately managed or not so identified or adequately dealt with. If Aurizon Network does not give such notice, the Environmental Investigation and Risk Management Report, subject to Clause 9.1(k), shall be included in Part 1 of Schedule 9 and amendments made to this Agreement [(including variations to the Base Access Charges)] if applicable. [Bracketed text is only included where Operator pays non-TOP Access Charges] (c) If Aurizon Network gives notice pursuant to Clause 9.1 (b) the Operator may respond, by a date agreed by the Parties, with a written proposal which demonstrates how the Operator proposes to manage those risks (“Operator’s Proposal”). The Operator’s Proposal must: (i) contain an investigation of the areas of risk and/or additional relevant environmental risks referred to in Clause 9.1(b); (A) specify risk abatement or attenuation measures which the Operator proposes to undertake in relation to them; and/or (B) specify how the Access Charges might contain a component reflecting the cost to Aurizon Network of assuming all or some portion of the risk; (ii) in relation to paragraph (ii)(A) specify a timeframe for implementation of those measures; and (iii) specify details of any public consultation the Operator proposes to undertake in connection with the implementation of any such measures. (d) Aurizon Network may, acting reasonably, accept or reject all or part of the Operator’s Proposal. (e) If Aurizon Network accepts the Operator’s Proposal, then it will be incorporated into and form part of the Environmental Investigation and Risk Management Report which, subject to Clause 9.1(k), shall be included in Part 1 of Schedule 9 and amendments made to the Agreement [(including variations to the Base Access Charges)] if applicable. [Bracketed text is only included where Operator pays non-TOP Access Charges] (f) If the Operator fails to submit to Aurizon Network an Operator’s Proposal by the date agreed by the Parties or if Aurizon Network rejects all or part of the Operator’s Proposal, Aurizon Network may advise the Operator of the risks not adequately managed or not identified or adequately dealt with and then either Party may refer the issue of whether the Environmental Investigation and Risk Management Report and/or the Operator’s Proposal does or does not adequately manage or does or does not identify or adequately deal with the relevant environmental risks to an expert for determination in accordance with Clause 18.3. (g) If the expert determines that the Environmental Investigation and Risk Management Report and/or Operator’s Proposal does adequately manage the risks or identifies and adequately deals with the risks, then the Environmental Investigation and Risk Management Report as modified by the Operator’s Proposal (if applicable) will, subject to Clause 9.1(k), be accepted and included in Part 1 of Schedule 9 and amendments made to this Agreement [(including variations to the Base Access Charges)] if applicable. [Bracketed text is only included where Operator pays non-TOP Access Charges] (h) If the expert determines that the Environmental Investigation and Risk Management Report and/or Operator’s Proposal does not adequately manage the risks or does not identify and adequately deal with the risks, then provided the Operator amends the Environmental Investigation and Risk Management Report in accordance with the expert’s determination and/or recommendations within the time frame specified by the expert, the Environmental Investigation and Risk Management Report as amended will, subject to Clause 9.1(k), be accepted and included in Part 1 of Schedule 9 and amendments made to the Agreement [(including variations to the Base Access Charges)] if applicable. [Bracketed text is only included where Operator pays non-TOP Access Charges] (i) If the expert determines that the Environmental Investigation and Risk Management Report and/or Operator’s Proposal does not adequately manage the risks or does not identify and adequately deal with the risks and the Operator fails to amend the Environmental Investigation and Risk Management Report in accordance with the expert’s determination and/or recommendations within the time frame specified by the expert, Aurizon Network may terminate this Agreement by written notice to the Operator and the End User. (j) The Parties agree to implement the determination of the expert. (k) If: (i) an Environmental Investigation and Risk Management Report is included in Part 1 of Schedule 9; and (ii) amendments (if any) are made to this Agreement as a result of or in connection with that inclusion of the Environmental Investigation and Risk Management Report, then the commencement of the amendment of this Agreement to include the Environmental Investigation and Risk Management Report and those amendments is subject to and conditional upon the Operator being notified by Aurizon Network that all necessary amendments (if any) to the End User Access Agreement (including variations to the amounts payable by the End User) have been made in respect of such matters and any relevant nomination of the Operator by the End User in accordance with the End User Access Agreement has, if necessary, been varied.
Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.
Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.