STRUCTURAL FRAMING Sample Clauses

STRUCTURAL FRAMING. A l l framing s h a l l be new steel bar joists, junior beams girders. Roof deck shall be ASTM A-245 Grade C Minimum 22 ga. intermediate or wide rib, factory painted steel, or concrete plank. Clearance under steel shall be minimum all retail and warehouse areas. A l l steel t o be Shop coat t o accept white spray paint finish i n field. A l l mezzanine area floors f o r office use minimum live load. Where HVAC equipment is roof mounted, note need t o provide strength and durability of construction from roof hatch t o and around all equipment t o support l i v e load of men and equipment.
AutoNDA by SimpleDocs

Related to STRUCTURAL FRAMING

  • Structural (i) Structural floor plans and sections with detailing well advanced.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

  • Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Structural Alterations Company will make no structural alterations to the Premises without the prior written consent of Authority.

  • Geometric visibility The visibility of the illuminating surface, including its visibility in areas which do not appear to be illuminated in the direction of observation considered, shall be ensured within a divergent space defined by generating lines based on the perimeter of the illuminating surface and forming an angle of not less than 5° with the axis of reference of the headlamp. The origin of the angles of geometric visibility is the perimeter of the projection of the illuminating surface on a transverse plane tangent to the foremost part of the lens of the headlamp.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

Time is Money Join Law Insider Premium to draft better contracts faster.