STUDY CLOSURE Sample Clauses

STUDY CLOSURE. All routine monitoring functions must be performed prior to the study closure visit; the study closure visit may be combined with a monitoring visit. The following tasks should be completed at the last visit by the monitor: • Ensure that all forms and images have been sent to the Sponsor; • Ensure that the Ulthera® System, study transducers, photographic equipment, and any other study supplies or equipment provided to the study site for study use have been returned to the Sponsor; • Remind the investigator of the obligation to retain the records; and • Prepare final monitoring report for Sponsor and IRB or EC.
AutoNDA by SimpleDocs

Related to STUDY CLOSURE

  • PLANT CLOSURE 29.01 In the event the Company closes the plant at the Cambridge location as a result of the loss of business or a discontinuation of all operations, severance pay will be calculated at one (1) week’s regular pay per year of service. The severance payment, so calculated, is inclusive of any severance payment required by the Ontario Employment Standards Act (Revised 2000). This agreement is not applicable to a sale of the business or if the closure is occasioned by a labour dispute.

  • Contract Closure Contracting Officer shall give appropriate written notice to Purchaser when Purchaser has complied with the terms of this contract. Purchaser shall be paid refunds due from Timber Sale Account un- der B4.24 and excess cooperative deposits under B4.218.

  • School Closure The School shall make reasonable efforts to promptly notify the public, which may include notice to the Department of Education, of any circumstance requiring the closure of the School, including, but not limited to, a natural disaster, such as an earthquake, storm, tsunami, flood, or other weather-related event, other extraordinary emergency, or destruction of or damage to the School facility;

  • Account Closure At any time, for any reason, we may take any of these actions subject to applicable law:

  • Emergency Closure Where there is a temporary closure as a result of an immediate emergency or a planned temporary closure due to renovations, repairs, or moves, the Employer will:

  • Feasibility Study Buyer will, at Buyer's expense and within ____ days from Effective Date ("Feasibility Study Period"), determine whether the Property is suitable, in Buyer's sole and absolute discretion, for ___________________ use. During the Feasibility Study Period, Buyer may conduct a Phase I environmental assessment and any other tests, analyses, surveys and investigations ("Inspections") that Buyer deems necessary to determine to Buyer's satisfaction the Property's engineering, architectural and environmental properties; zoning and zoning restrictions; subdivision statutes; soil and grade; availability of access public roads, water, and other utilities; consistency with local, state and regional growth management plans, availability of permits, government approvals, and licenses; and other inspections that Buyer deems appropriate to determine the Property's suitability for the Buyer's intended use. If the Property must be rezoned, Buyer will obtain the rezoning from the appropriatx xxxernment agencies. Seller will sign all documents Buyer is required to file in connection with development or rezoning approvals. Seller gives Buyer, its agents, contractors and assigns, the right to enter the Property at any time during the Feasibility Study Period for the purpose of conducting inspections; provided, however, that Buyer, its agents, contractors and assigns enter the Property and conduct inspections at their own risk. Buyer will indemnify and hold Seller harmless from xxxxes, damages, costs, claims and expenses of any nature, including attorney's fees, expenses and liability incurred in application for rezoning or related proceedings, and from liability to any person, arising from the conduct of any and all inspections of any work authorized by Buyer. Buyer will not engage in any activity that xxxxx result in a construction lien being filed against the Property without Seller's prior written consent. If this transaction does not close, Buyer will, at Buyer's expense, (1) repair all damages to the Property resulting from the Inspections and return the Property to the condition it was in prior to conduct of the Inspections, and (2) release to Seller all reports and other work generated as a result of the Inspections. Buyer will deliver written notice to Seller prior to the expiration of the Feasibility Study Period of Buyer's determination of whether or not the Properxx xx acceptable. Buyer's failure to comply with this notice requirement will constitute acceptance of the Property as suitable for Buyer's intended use in its "as is" condition. If the Property is unacceptable to Buyer and written notice of this fact is timely delivered to Seller, this Contract will be deemed terminated as of the day after the Feasibility Study period ends and Buyer's deposit(s) will be returned after Escrow Axxxx receives proper authorization form all interested parties.

  • Formal Investigation Once the matter has been brought to the attention of the Store executive, an internal investigation of the complaint will be conducted at which time the complainant will be requested to present, in writing, the particulars of the harassment. Such internal investigation will be initiated no later than ten (10) business days of the matter being brought to the attention of the Store executive, and shall be concluded no later than thirty (30) business days of the initiation of the investigation. Any extension of the aforementioned time frames must have the agreement of the complainant and the union if the complainant has chosen to involve it. Based on the outcome of the investigation, which will be provided in writing upon the completion of the investigation, to both the complainant and the union, should the complainant consent to this disclosure, it will be determined if there has been a breach of Company policy on harassment, and the appropriate action will be taken in the event that harassment is determined to have occurred. STEP THREE - SUBSEQUENT INCIDENTS Subsequent incidents should immediately be reported and followed by a written description to the most senior store executive involved in Step Two for further investigation and disciplinary action, if confirmed, with a copy to the union Chairperson with the consent of the complainant. After all steps of the Harassment Protection Policy have been exhausted, if the incident has not been resolved to the satisfaction of the employee, the employee may file a grievance at Step 2 of the grievance procedure.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Study An application for leave of absence for professional study must be supported by a written statement indicating what study or research is to be undertaken, or, if applicable, what subjects are to be studied and at what institutions.

Time is Money Join Law Insider Premium to draft better contracts faster.