Subbasin Refinement Sample Clauses

Subbasin Refinement. Activities The Engineer will use the current GIS inventory (Task 2-1) and preliminary mapping (Task 2-2) to refine stormwater subbasins used in the 2006 Stormwater Master Plan. Subbasin size will remain consistent with the 2006 Stormwater Master Plan, but may vary per the extent of the public stormwater system mapped, and anticipated hydraulic modeling needs. Subbasins may extend outside of the city limits to account for contributing areas, but detailed delineation in areas outside of the City is not anticipated. Field investigations (Task 3-1) will be used to review and refine the subbasin delineations.
AutoNDA by SimpleDocs

Related to Subbasin Refinement

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • FABRICATION Making up data or results and recording or reporting them.

  • Construction Sequencing In general, the sequence of the proposed dates of Initial Operation of Interconnection Customers seeking interconnection to the Transmission System will determine the sequence of construction of Network Upgrades.

  • Cement Cement to be used for the work shall comply the following and shall be used with the prior approval of Engineer -in -charge

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Compaction 11.1 Concrete shall be thoroughly compacted and fully worked around the reinforcement, around embedded fixtures and into corners of the formwork.

Time is Money Join Law Insider Premium to draft better contracts faster.