Substation Automation System Sample Clauses

Substation Automation System a) For all the new substations, state of art Substation Automation System (SAS) conforming to IEC-61850 shall be provided. The distributed architecture shall be used for Substation Automation system, where the controls shall be provided through Bay control units. The Bay control unit is to be provided bay wise for voltage level 220 kV and above. All bay control units as well as protection units are normally connected through an Optical fibre high speed network. The control and monitoring of circuit breaker, dis-connector, re-setting of relays etc. can be done from Human Machine Interface (HMI) from the control room.
AutoNDA by SimpleDocs
Substation Automation System a. For all the new substations, state of art Substation Automation System (SAS) conforming toIEC-61850 shall be provided. The distributed architecture shall be used for Substation Automation system, where the controls shall be provided through Bay control units. The Bay control unit is to be provided bay wise for voltage level 220kV and above. All bay control units as well as protection units are normally connected through an Optical fibrehigh speed network. The control and monitoring of circuit breaker, dis-connector, re-setting of relays etc. can be done from Human Machine Interface (HMI) from the control room. The functions of control, annunciation, disturbance recording, event logging and measurement of electrical parameters shall be integrated in Substation Automation System. At new substations, the Substation Automation System (SAS) shall be suitable for operation and monitoring of the complete substation including proposed future bays/elements. In existing substations with Substation automation system (SAS), augmentation of existingSAS shall be done for bays under present scope. In existing Substations where Substation automation is not provided, control functions shallbe done through control panels. Necessary gateway & modems (as required) shall be provided to send data to RLDC/SLDC as per their requirement. Any augmentation work at RLDC/SLDC is excluded from TSP’s scope. However, all the configuration work at substation end required to send data to RLDC/SLDC shall be in the scope of TSP.
Substation Automation System a) For all the new substations, state of art Substation Automation System (SAS) conforming to IEC- 61850 shall be provided. The distributed architecture shall be used for Substation Automation System, where the controls shall be provided through Bay Control Units. The Bay Control Unit is
Substation Automation System a) For all the new substations, state of art Substation Automation System (SAS) conforming to IEC- 61850 shall be provided. The distributed architecture shall be used for Substation Automation system, where the controls shall be provided through Bay control units. The Bay Control Unit (BCU) is to be provided bay wise for voltage level 220 kV and above. All Bay Control Units (BCU) as well as protection units are normally connected through an Optical fibre high speed network. The control and monitoring of circuit breaker, dis-connector, re-setting of relays etc. can be done from Human Machine Interface (HMI) from the Relay Control Room.
Substation Automation System. In existing substations with Substation automation system (SAS), augmentation of existing SAS shall be done for bays under present scope.
Substation Automation System a) For all the new substations, state of art Substation Automation System (SAS) conforming to IEC-61850 shall be provided. The distributed architecture shall be used for Substation Automation system, where the controls shall be provided through Bay Chenab Valley Power Projects [P] Limited SPV [which is under incorporation]

Related to Substation Automation System

  • Data Encryption Contractor must encrypt all State data at rest and in transit, in compliance with FIPS Publication 140-2 or applicable law, regulation or rule, whichever is a higher standard. All encryption keys must be unique to State data. Contractor will secure and protect all encryption keys to State data. Encryption keys to State data will only be accessed by Contractor as necessary for performance of this Contract.