Summary of Scope Sample Clauses

Summary of Scope. Specify the inflow assumptions to be evaluated. Establish and implement a long-term monitoring protocol. Establish analytical objectives. Identify any apparent long-term differences from the assumptions. Perform additional investigations and analyses, if needed, to identify causes.
AutoNDA by SimpleDocs
Summary of Scope. Engineering studies will address design options, siting, water quality, geology and hydrology, yield analysis, costs and economics, constructibility, reliability, and other factors. Environmental studies will address potential effects of the project on resident fish and wildlife populations and wetlands, and will evaluate alternative mitigation measures.
Summary of Scope. The analyses will involve evaluation of various switching criteria, including measured streamflows and reservoir conditions, forecasted streamflows and reservoir conditions, refill success, system-wide (beyond only the Cedar River) conditions, biological conditions, and watershed conditions, such as soil moisture, snowpack, and groundwater. Adaptive management techniques will also be investigated. It will be the goal of the analyses to develop switching criteria that are measurable, independently verifiable, robust, and are representative of the system’s ability to meet future diversion and instream flow needs.
Summary of Scope. The sponsored effort will locate, characterize and monitor steelhead redds from the time of their construction through fry emergence.
Summary of Scope. To enhance present understanding of the biology of aquatic resources in the Cedar River and the complex relationships between stream flow and fish habitat, the City will conduct studies addressing the following list of supplemental study topics:
Summary of Scope. Provide 100% Permittable documents to completely remove the existing CO2 fire suppression system from the Runway 18L Vault. Provide Compliance with the building code windowless building provisions which will require addition of exterior egress door. No bidding services will be required as Owner will directly negotiate with contractor. The Consultant shall compile documents as required to submit for negotiation with contractors and permit by AHJ:
Summary of Scope. Item Activity Number of Days Day Rate Item Cost 5 Total (excluding VAT & Expenses)
AutoNDA by SimpleDocs

Related to Summary of Scope

  • Budget Summary Other Sources (Page BudgetSum 2-3 - Acct 7000), must equal Other Uses (BudgetSum 2-3 - Acct. 8000). Estimated Beginning Fund Balance July,1 2020 for all Funds (Cells C3 - K3) (Line must have a number or zero. Do not leave blank.) OK Estimated Activity Fund Beginning Fund Balance July,1 2020 (Cell C83) (Cell must have a number or zero. Do not leave blank.) OK Transfer Among Funds (Funds 10, 20, 40 - Acct 7130 - Cells C29, D29, F29), must equal (Funds 10, 20 & 40 - Acct 8130 - Cells C52, D52, F52). OK Transfer of Interest (Funds 10 thru 90 - Acct 7140 - Cells C30:K30), must equal (Funds 10 thru 60, & 80 - Acct 8140 - Cells C53:H53, J53). OK Transfer to Debt Service to Pay Principal on Capital Leases (Fund 30 - Acct 7400 - Cell E39) must equal (Funds 10, 20 & 60 - Acct 8400 Cells C57:H60). OK Transfer to Debt Service to Pay Interest on Capital Leases (Fund 30 - Acct 7500 - Cell E40) must equal (Funds 10, 20 & 60 - Acct 8500 - Cells C61:H64). OK Transfer to Debt Service Fund to Pay Principal on Revenue Bonds (Fund 30 - Acct 7600 - Cell E41) must equal (Funds 10 & 20 - Acct 8600 - Cells C65:D68). OK Transfer to Debt Service to Pay Interest on Revenue Bonds (Fund 30 - Acct 7700 - Cell E42) must equal (Funds 10 & 20 - Acct 8700 - Cells C69:D72). OK Transfer to Capital Projects Fund (Fund 60 - Acct 7800 - Cell H43) must equal (Fund 10 & 20, Acct 8800 - Cells C73:D76). OK

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Task Description This task includes activities associated with permit-required monitoring conducted in accordance with the conditions specified by state or federal regulatory agencies. All monitoring tasks must be located within or adjacent to the Project area and follow the Department’s Regional Coastal Monitoring Program and FWC's marine turtle and shorebird monitoring programs. Guidance for monitoring of nearshore resources is available in the Department's Standard Operation Procedures For Nearshore Hardbottom Monitoring Of Beach Nourishment Projects. The Local Sponsor must submit work products directly to the appropriate state or federal regulatory agencies in accordance with permit conditions to be eligible for reimbursement under this task, unless otherwise directed.

  • Service Descriptions Available services for Transitional and Enhanced Supervision Services a. One (1) one-to-one meeting with the Contractor per week for case management services.

  • System Description The DLCS is a network consisting of devices which are remotely controlled over RF transmission equipment by the PowerCAMPTM Software or equivalent. CL&P shall have access to the PowerCAMP™ LMS (as defined below) via the web interface. The PowerCAMPTM LMS shall include the software and hardware necessary to manage the Control Devices installed at the End-use Equipment at Participating Facilities. The PowerCAMPTM LMS includes AER’s PowerCAMPTM Server and PowerCAMPTM Suite, networking equipment, and third party software. PowerCAMPTM LMS Hardware

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 9302 Single Lane / Level 2 NFSR 300 0.00 END 0.58

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).