Survey/Agreed Parcel Split Sample Clauses

Survey/Agreed Parcel Split. Within ten (10) days after the LAA Effective Date, Developer will arrange with a mutually acceptable licensed and registered surveyor in the State to prepare and deliver to City and Developer:
AutoNDA by SimpleDocs

Related to Survey/Agreed Parcel Split

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

  • Construction Schedules 10.1 Within seven (7) days of the University’s issuance of a purchase order, the Contractor shall submit to the Project Coordinator three (3) copies of a Construction Schedule for this Project. The Schedule shall be in bar chart form and shall include all aspects of the work, the interrelationship of the various trades and the critical path of the job. The schedule shall include a timeline for the submission, review and approval of shop drawings for critical path items and delivery and installation dates for those same critical path, or long lead time items, (such as electrical transformers and elevator). The Schedule shall coincide with the Contractor’s approved Schedule of Values. The Schedule shall indicate a completion date in advance of the date established for Substantial Completion. The Schedule shall be acceptable to the Architect/Engineer and the Project Coordinator. It shall be revised and reissued at the beginning of every month for the duration of the project. This monthly update progress Schedule shall include a summary comparison of the original schedule and the latest updated schedule (previous month) showing all activity description and dates. These comparison schedules shall be in the form of a summary bar chart, an activity listing report and actual to target comparisons. The reports may include critical activities, float time, duration of each activity, dates of each activity and the network logic (including successors and predecessors of each activity). Included with the written report and electronic copy of the schedule submission noting the above referenced requirements. Failure to provide the Architect/Engineer, or the Project Coordinator with an acceptable, revised Schedule, within seven (7) days of the receipt of a written request, may result in the withholding of the Contractor’s monthly progress payments until such a Schedule is received.

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Sub-projects 1. The Participating Bank shall make Sub-loans to Beneficiaries and appraise, review, approve, and supervise Sub-projects in accordance with the criteria, conditions and procedures set forth in the Operations Manual, including, inter alia, the following eligibility criteria:

  • Construction Budget The total amount indicated by the District for the Project plus all other costs, including design, construction, administration, financing, and all other costs.

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Survey Buyer may obtain a survey of the Property before the Closing to assure that there are no defects, encroachments, overlaps, boundary line or acreage disputes, or other such matters, that would be disclosed by a survey ("Survey Problems"). The cost of the survey shall be paid by the Buyer. Not later than business days prior to the Closing, Buyer shall notify Seller of any Survey Problems which shall be deemed to be a defect in the title to the Property. Seller shall be required to remedy such defects within business days and prior to the Closing. If Seller does not or cannot remedy any such defect(s), Buyer shall have the option of canceling this Agreement, in which case the Xxxxxxx Money shall be returned to Buyer.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.