Switch Site Requirements. 5.4.1.1 Existing building Site requirements in Section 5.2.1 also apply to the Switch Site, unless modified in this section.
5.4.1.2 Site is assumed to be an existing building of suitable size to house the Switch equipment and power supplies, inclusive of space for offices and storage.
5.4.1.3 Area should accommodate approved equipment layouts, house support personnel and provide storage for repair equipment. Cable tray height of between 8'6" to 9'6" is required, with adequate access for construction, installation, and material movement.
5.4.1.4 Power shall be within reasonable distance of the equipment room and provide AC, three phase, at sufficient amperage to support the MSO equipment configuration.