SWITCHBOARD PANEL WIRING Sample Clauses

SWITCHBOARD PANEL WIRING. Responsibility: POWER Deliverable(s): • Switchboard Panel Wiring Diagrams Prepare Switchboard Panel Wiring Diagrams. Organize the required terminal blocks by panels and function (CT shorting type, voltage input, breaker contacts, trip circuits, close circuits, auxiliary circuits, RTU circuits, etc.) Show wiring terminations required for each panel. Clearly designate the destination of the wire at each terminal. Place wiring from yard equipment or from other panels on one side of the terminal block and all wiring to the panel devices on the other side as much as is practical. Show a maximum of two (2) terminations per terminal. Designate the panel name or number at the top of each page. Assumption(s): • The only modifications to the existing switchboard panel wiring diagrams will be to reflect the removal/addition of new equipment or terminations as required to interface with substation modifications associated directly with this project. • The 138kV Canal Transmission project is awarded to PEI. • 27kV equipment will utilize 7th Avenue North as go by drawings. • 138kV equipment will utilize Canal Transmission as go by drawings.
AutoNDA by SimpleDocs

Related to SWITCHBOARD PANEL WIRING

  • Moonlighting 24.01 The Company and the Union agree in principle to eliminate the practice commonly referred to as moonlighting.

  • Outdoor Lighting 3.8.1 Lighting shall be directed to driveways, parking areas, loading area, building entrances and walkways and shall be arranged so as to divert the light away from streets, adjacent lots and buildings.

  • Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.

  • Fire Fighting Costs of operating and maintaining the fire-fighting equipments and personnel, if any.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Wiring When wiring of any kind is introduced, it must be connected as directed by Landlord, and no boring or cutting for wires will be allowed, except with the prior written consent of Landlord. The location of telephones, call boxes, telephone boards, and other office equipment in the Premises shall be prescribed by Landlord.

  • Switching All of the negotiated rates, terms and conditions set forth in this Section pertain to the provision of local and tandem switching.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Interface A defined set of transmission facilities that separate Load Zones and that separate the NYCA from adjacent Control Areas. Investor-Owned Transmission Owners. A Transmission Owner that is owned by private investors. At the present time these include: Central Xxxxxx Gas & Electric Corporation, Consolidated Edison Company of New York, Inc., New York State Electric & Gas Corporation, Niagara Mohawk Power Corporation, Orange and Rockland Utilities, Inc., and Rochester Gas and Electric Corporation.

  • Installation Services 3.1 The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

Time is Money Join Law Insider Premium to draft better contracts faster.