Technical Score Sample Clauses

Technical Score. 28 The Technical Score will be calculated based on the TERC’s total evaluation score for 29 the Technical Proposal (maximum of 1000 points) as described in Section 5.4.2. The 30 Technical Score will be calculated using the following formula: 31 Technical Score = (Proposer’s total evaluation score / Highest total 32 evaluation score) x 30 33 Proposer’s total evaluation score = Proposer’s TERC total 34 evaluation score as determined pursuant to Section 5.4 35 Highest total evaluation score = Highest TERC total evaluation 36 score for a Proposer as determined pursuant to Section 5.4
AutoNDA by SimpleDocs
Technical Score. 24 The TERC will review and evaluate the Technical Proposals with reference to the
Technical Score. During the evaluation, each subfactor as described in section C.5.a above will be assigned a consensus rating by the City of Houston, which will be converted to points. The points for each subfactor will be added to determine the Proposal’s score for each of the corresponding evaluation factors. The score of each of the evaluation factors will then be added to arrive at the total evaluation score for the Project Development Plan, with 100 maximum possible points (see table 4). The best value points for the technical Proposal will be calculated using the formula in Table 2. Table 4 – Technical Proposal Points Project Development Plan Maximum Qualitative Rating (100 Points) Technical Solutions 40 Points Preliminary Project Management Plan 20 Points Preliminary Systems Engineering Plan 20 Points Design-Build Management 10 Points Preliminary Quality Management Plan 10 Points

Related to Technical Score

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • TECHNICAL TASKS Products that require a draft version are indicated by marking “(draft and final)” after the product name in the “Products” section of the task/subtask. If “(draft and final)” does not appear after the product name, only a final version of the product is required. Subtask 1.1 (Products) describes the procedure for submitting products to the CAM.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • PRODUCT MANUFACTURER'S SUPPLIERS Only those dealers/distributors listed by the manufacturer will be considered authorized to act on behalf of the Product Manufacturer.

  • Technical Safeguards 1. USAC and the Department will process the data matched and any data created by the match under the immediate supervision and control of authorized personnel to protect the confidentiality of the data, so unauthorized persons cannot retrieve any data by computer, remote terminal, or other means.

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order.

Time is Money Join Law Insider Premium to draft better contracts faster.