Tenant List Report Sample Clauses

Tenant List Report. Upon request from the City, the Operator shall prepare and submit a comprehensive report that shall include all information listed above in 2.5.1 through 2.5.3.
AutoNDA by SimpleDocs

Related to Tenant List Report

  • Final Project Report Prepare a Final Project Report that addresses, to the extent feasible, comments made by the Grant Manager on the Draft Final Project Report. Submit one (1) reproducible master and an electronic copy of the final. Upload an electronic copy of the final report in pdf format to the FAAST system.

  • COST REPORT 29 A. CONTRACTOR shall submit separate Cost Reports for each Period, or for a portion thereof, to 30 COUNTY no later than forty-five (45) calendar days following the period for which they are prepared or 31 termination of this Contract. CONTRACTOR shall prepare the Cost Report in accordance with all 32 applicable federal, state and COUNTY requirements, GAAP and the Special Provisions Paragraph of this 33 Contract. CONTRACTOR shall allocate direct and indirect costs to and between programs, cost centers, 34 services, and funding sources in accordance with such requirements and consistent with prudent business 35 practice, which costs and allocations shall be supported by source documentation maintained by 36 CONTRACTOR, and available at any time to ADMINISTRATOR upon reasonable notice.

  • Project Reports; Completion Report 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report.

  • Test Report The testing laboratory shall prepare a written report indicating the drugs, alcohol, or their metabolites tested for, the types of tests conducted, and whether the test produced negative or positive test results, and the testing laboratory shall disclose that report to the Appointing Authority within three working days after obtaining the final test result.

  • Test Reports Should a test report (“Test Report”) be required on the purchase order, the Test Report must be signed or stamped by an authorized representative of the supplier. It must contain, as a minimum, supplier name and address, Buyer part number, purchase order number, quantity, date shipped, heat/lot number, all acceptance criteria for specification and list all of the specifications i.e. MIL-P, AMS, ASTM, etc. which would apply to the shipment. All material shipped is to be the latest revision available. All Test Reports to reference revision level of material shipped.

  • Property Description A document prepared as an exhibit for the conveyance of a property interest, reflecting a boundary survey, signed and sealed by a Registered Professional Land Surveyor (RPLS), attached to an acquisition deed as Exhibit A, and consists of the following two (2) parts:

  • Condition Report The landlord and tenant are required to inspect the residential unit together at the beginning and end of the tenancy and complete a written condition report. If the landlord allows the tenant to have a pet after the start of the tenancy, an inspection report must be done on the day the tenant starts keeping a pet or on another day mutually agreed to by the landlord and tenant, unless the tenancy started on or after January 1, 2004, and a condition inspection report was completed at that time. A report may describe any damage, how clean each room is, and the general condition of the residential unit including: the floors, carpets, appliances, and paint on the walls. The report must be signed and dated by both the landlord and the tenant who made the inspection, and each should keep a copy. Change of Landlord – A new landlord has the same rights and duties as the previous one and must follow all the terms of this agreement unless the tenant and new landlord agree to other terms.

  • Punch List If, at any time after the Project has been Physically Completed, there shall exist any item or items requiring completion or correction, then the Developer agrees to use all reasonable diligence to complete or correct such item or items so that each conforms to the Final Plans. The parties shall make a Punch-List of the items requiring completion or correction (the "Punch List"). Each item on the Punch-List shall be assigned a reasonable value based upon the reasonable cost of completion or correction of the same or such other value as may be required by the Owner's lender ("Punch-List Amount"). The Developer shall give its written undertaking to complete each such item within forty-five (45) days (or such other period of time as is mutually agreed upon by the parties).

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.