Testing the Joints Sample Clauses

Testing the Joints. After laying and jointing, the pipes and fittings shall be filled up with water and inspected under working conditions of pressure and flow. Any joint found leaking shall be redone and all leaking pipes removed and replaced without extra cost. Leakage rate should not be more than that specified in I.S. 3114. The pipes and fittings after they are laid shall be tested to a hydraulic pressure of 6kg/cm (60 meter or double the design working pressure whichever is more. The pipes shall be slowly and carefully charged with water allowing all air to escape and avoiding all shock or water hammer. The draw off takes and stop cocks shall the be closed and specified hydraulic pressure shall be applied gradually. Pressure gauge must be accurate and preferably should have bee recalibrated before the test. the test pump having been stopped the test pressure should maintain without any loss for at least half an hour. The pipes and fittings shall be tested in sections as the work of laying proceeds, keeping the joints exposed for inspection during the testing.
AutoNDA by SimpleDocs

Related to Testing the Joints

  • Conditions Affecting the Work The Contractor shall be responsible for having taken steps reasonably necessary to ascertain the nature and location of the Work, and the general and local conditions, which can affect the Work or the cost thereof for any Job Order. Any failure by the Contractor to do so will not relieve him from responsibility for successfully performing the Work without additional expense to the County. The County assumes no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of this Contract, unless such understanding or representations by the County are expressly stated in the Contract.

  • Continuing the Work The Contractor shall carry on the Work and adhere to the progress schedule during all disputes, disagreements or alternative resolution processes with the Owner. The Contractor shall not delay or postpone any Work because of the pending resolution of any disputes, disagreements or processes, except as the Owner and the Contractor may agree in writing.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Marketing the Property In an effort to properly and efficiently market the Property, the Seller grants the following permissions to the Agency: (Initial ALL That Apply) - Advertise the Property. - To use the Property’s street address when advertising the Property. - Allow third (3rd) party websites to create estimated market values of the Property. - Allow the Agency to disclose the existence of other offers on the Property. - Publish any and all Property information electronically or in print. This includes, but is not limited to, the Multiple Listing Service (MLS), real estate websites, newspapers, etc. - Place a lockbox or key box on the Property. The Seller shall hold harmless the Agency and all cooperating licensees from all responsibility and liability resulting from any loss, damage, or theft which might occur while the Property is listed by the Agency under this Agreement. - Authorize a “For Sale” Sign on the Property.

  • Contractors Submission Respecting the Agreement The Contractor shall, as part of the Contractor's submission respecting this Contract, complete the attached Schedule B, Identification of Principles; Schedule C, Schedule of Tendered Unit Prices; Schedule D, Schedule of Equipment to be used on the work; and Schedule E, Schedule of Sub-Contractors. The Contract including all appended schedules shall be completed in complete conformity with the instructions to bidders contained in the document entitled "General Provisions and Contract Specification for Highway Construction". In presenting the Contractor’s submission for consideration by the Minister, the Contractor understands that until, and unless, the Contract is endorsed by the Minister, no Contract between the parties shall exist and the Minister shall not be bound to endorse any Contract.

  • APPLICABILITY TO SUBCONTRACTORS Respondent agrees that all contracts it awards pursuant to the contract awarded as a result of this Agreement will be bound by the foregoing terms and conditions.

  • Hours of Work and Scheduling Provisions (b) In the event an Employee is scheduled to work on the evening or night Shift(s) on the day(s) or the night Shift commencing on the day(s) on which the Employee is called as a juror or witness in matters arising out of the Employee’s employment with the Employer, the Employee shall be granted a leave of absence for those scheduled Shift(s).

  • IDENTIFYING THE PROBLEM During the early stages of problem detection, the NMC will be able to tell which CLECs are affected by the catastrophe. Further analysis and/or first hand observation will determine if the disaster has affected CLEC equipment only, BellSouth equipment only or a combination. The initial restoration activity will be largely determined by the equipment that is affected. Once the nature of the disaster is determined and after verifying the cause of the problem, the NMC will initiate reroutes and/or transfers that are jointly agreed upon by the affected CLECs' Network Management Center and the BellSouth NMC. The type and percentage of controls used will depend upon available network capacity. Controls necessary to stabilize the situation will be invoked and the NMC will attempt to re-establish as much traffic as possible. For long-term outages, recovery efforts will be coordinated by the ECC. Traffic controls will continue to be applied by the NMC until facilities are re-established. As equipment is made available for service, the ECC will instruct the NMC to begin removing the controls and allow traffic to resume.

  • On-the-Job Training (10-16-07) (Rev. 4-21-15) Z-10

  • Office of Inspector General Investigative Findings Expert Review In accordance with Senate Bill 799, Acts 2021, 87th Leg., R.S., if Texas Government Code, Section 531.102(m-1)(2) is applicable to this Contract, Contractor affirms that it possesses the necessary occupational licenses and experience.

Time is Money Join Law Insider Premium to draft better contracts faster.