Common use of Time Schedules Clause in Contracts

Time Schedules. We estimated that the fieldwork can be started shortly after authorization is received. The actual drilling work is expected to take about 1 week, assuming no delays in permission to access the sites. The laboratory testing will take approximately 1 to 2 weeks. Weather permitting, we anticipate submitting a draft report about 2 weeks after completion of all laboratory testing. A final report will be issued about 1 week after receiving your review comments. We appreciate the opportunity to submit this proposal and look forward to being of service to you on this project. Very truly yours, ASSOCIATED TESTING LABORATORIES, INC. Xxxxx X. Xxxxx, Ph.D., P.E. Director, Geotechnical Services Enclosures: Figure 1: Proposed Improvement Alignment Figure 2: Proposed Boring Location Itemized Geotechnical Fee Estimate Project Proposal: W Sycamore Road Improvements Fort Bend County, Texas Proposal No.: GP2020-0710 Not to Scale Client: HJ Consulting, Inc. Sugar Land, Texas Proposed Improvement Alignment FIGURE 1 NORTH Notes: Borings B-1 through B-6 at 15-ft [90] Project Proposal: W Sycamore Road Improvements Fort Bend County, Texas Proposal No.: GP2020-0710 Scale: 1 inch : 300 ft Client: HJ Consulting, Inc. Sugar Land, Texas Proposed Boring Location FIGURE 2 Geotechnical Investigation Proposal W Sycamore Road (From S. Post Oak to S Curve at Edgewood Trail) ATL Proposal No. GP2020-0710 August 19, 2020 ITEMIZED GEOECHNICAL FEE ESTIMATE Borings: 6@15' (90 LF) A. FIELD EXPLORATION Qty. Unit Unit Rate Amount Mobilization/Demobilization (Truck Rig) 1 LS $500.00 $500.00 Technician for Staking, Utilities Clearance, Coordination 8 hrs. $50.00 $400.00 Soil Drilling and Sampling (continuous; <50') 90 ft. $21.00 $1,890.00 Soil Drilling and Sampling (continuous; >50') 0 ft. $24.00 $0.00 Soil Drilling and Sampling (<50' intermittent) 0 ft. $18.00 $0.00 Soil Drilling and Sampling (intermittent; over 50' ) 0 ft. $21.00 $0.00 Grouting Holes 90 ft. $7.00 $630.00 Piezometer Installation 0 ft. $16.00 $0.00 Piezometer Abandonment 0 ft. $14.00 $0.00 24-Hour, 7- and 30-day PZ Water Level Readings 0 hrs. $50.00 $0.00 Vehicle Charge 8 hrs. $10.00 $80.00 Mobilization/Demobilization (ATVrig), Surcharge 0 LS $132.00 $0.00 Soil Drilling and Sampling (Surcharge for drilling using ATV rig) 0 ft. $6.00 $0.00 Pavement Coring and Patching (up to 6 inches thick) 6 ea. $150.00 $900.00 Pavement Coring and Patching (>6 inches thick) 36 in. $9.00 $324.00 $4,724.00 B. GEOTECHNICAL LABORATORY TESTING Qty. Unit Unit Rate Amount Moisture Content (ASTM D-2216) 48 ea. $9.00 $432.00 Atterberg Limits (ASTM D-4318) 18 ea. $60.00 $1,080.00 Passing No. 200 Sieve (ASTM D-1140) 18 ea. $46.00 $828.00 Unconfined Compression (ASTM D-2166) 6 ea. $44.00 $264.00 Unconsolidated-Undrained Triaxial Test (ASTM D-2850) 16 ea. $61.00 $976.00 SUBTOTAL $3,580.00 C. ANALYSES & REPORT PREPARATION Qty. Unit Unit Rate Amount Senior Engineer-Project Manager (P.E.) 4 hrs. $150.00 $600.00 Project Engineer (P.E.) 16 hrs. $105.00 $1,680.00 Civil Engineer 16 hrs. $83.00 $1,328.00 Draftsman 24 hrs. $60.00 $1,440.00 Word Processor 24 hrs. $60.00 $1,440.00 SUBTOTAL $6,488.00

Appears in 2 contracts

Samples: Agreement, Agreement for Professional Engineering Services

AutoNDA by SimpleDocs

Time Schedules. We estimated that the fieldwork can be started shortly after authorization is received. The actual drilling work is expected to take about 1 week, assuming no delays in permission to access the sites. The laboratory testing will take approximately 1 to 2 weeks. Weather permitting, we anticipate submitting a draft report about 2 4 weeks after completion of all laboratory testing. A final report will be issued about 1 week after receiving your review comments. We appreciate the opportunity to submit this proposal and look forward to being of service to you on this project. Very truly yours, ASSOCIATED TESTING LABORATORIES, INC. Xxxxx X. Xxxxx, Ph.D., P.E. Director, Geotechnical Services Enclosures: Figure 1: Proposed Improvement Alignment Figure 2: Proposed Boring Location Itemized Geotechnical Fee Estimate Project ProposalEstimates – Xxxxxxxxxx Road NORTH Notes: W Sycamore Road Improvements Borings B-1 through B-5 are 15-ft. deep Total Depth = 75-ft Guidelines: Fort Bend County Project: Xxxxxxxxxx Pavement Replacement & Drainage Improvements, Fort Bend County, Texas Proposal No.: GP2020GP21-0710 Not to Scale 0417 FIGURE 1 Client: HJ Kavi Consulting, Inc. Sugar LandHouston, Texas Proposed Improvement Alignment FIGURE 1 NORTH NotesBoring Location Plan Scale: Borings B-1 through B-6 at 15-0 500 ft [90] Project Proposal: W Sycamore Road Improvements 1000 ft Geotechnical Investigation Proposal Xxxxxxxxxx Pavement Replacement & Drianage improvements Fort Bend County, Texas Proposal No.: GP2020-0710 Scale: 1 inch : 300 ft Client: HJ Consulting, Inc. Sugar Land, Texas Proposed Boring Location FIGURE 2 Geotechnical Investigation Proposal W Sycamore Road (From S. Post Oak to S Curve at Edgewood Trail) ATL Proposal No. GP2020GP2021-0710 August 190417 April 30, 2020 2021 ITEMIZED GEOECHNICAL GEOTECHNICAL FEE ESTIMATE Xxxxxxxxxx Pavement Replacement & Drianage improvements Borings: 6@15' (90 5@15', [75 LF) ] A. FIELD EXPLORATION Qty. Unit Unit Rate Amount Mobilization/Demobilization (Truck Rig) 1 LS $500.00 $500.00 Technician for Staking, Utilities Clearance, Coordination 8 4 hrs. $50.00 $400.00 200.00 Soil Drilling and Sampling (continuous; <50') 90 75 ft. $21.00 $1,890.00 1,575.00 Soil Drilling and Sampling (continuous; >50') 0 ft. $24.00 $0.00 Soil Drilling and Sampling (<50' intermittent) 0 ft. $18.00 $0.00 Soil Drilling and Sampling (intermittent; over 50' ) 0 ft. $21.00 $0.00 Grouting Holes 90 75 ft. $7.00 $630.00 525.00 Piezometer Installation 0 ft. $16.00 $0.00 Piezometer Abandonment 0 ft. $14.00 $0.00 24-Hour, 7- and 30-day PZ Water Level Readings 0 hrs. $50.00 $0.00 Vehicle Charge 8 0 hrs. $10.00 $80.00 0.00 Mobilization/Demobilization (ATVrig), Surcharge 0 LS $132.00 $0.00 Soil Drilling and Sampling (Surcharge for drilling using ATV rig) 0 ft. $6.00 $0.00 Pavement Coring and Patching (up to 6 inches thick) 6 5 ea. $150.00 90.00 $900.00 450.00 Pavement Coring and Patching (>6 inches thick) 36 6 in. $9.00 $324.00 54.00 $4,724.00 B. GEOTECHNICAL LABORATORY TESTING Qty. Unit Unit Rate Amount Moisture Content (ASTM D-2216) 48 ea. $9.00 $432.00 Atterberg Limits (ASTM D-4318) 18 ea. $60.00 $1,080.00 Passing No. 200 Sieve (ASTM D-1140) 18 ea. $46.00 $828.00 Unconfined Compression (ASTM D-2166) 6 ea. $44.00 $264.00 Unconsolidated-Undrained Triaxial Test (ASTM D-2850) 16 ea. $61.00 $976.00 SUBTOTAL $3,580.00 C. ANALYSES & REPORT PREPARATION Qty. Unit Unit Rate Amount Senior Engineer-Project Manager (P.E.) 4 hrs. $150.00 $600.00 Project Engineer (P.E.) 16 hrs. $105.00 $1,680.00 Civil Engineer 16 hrs. $83.00 $1,328.00 Draftsman 24 hrs. $60.00 $1,440.00 Word Processor 24 hrs. $60.00 $1,440.00 SUBTOTAL $6,488.003,304.00

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

Time Schedules. We estimated that the fieldwork can be started shortly after authorization is received. The actual drilling work is expected to take about 1 week, assuming no delays in permission to access the sites. The laboratory testing will take approximately 1 to 2 weeks. Weather permitting, we anticipate submitting a draft report about 2 4 weeks after completion of all laboratory testing. A final report will be issued about 1 week after receiving your review comments. We appreciate the opportunity to submit this proposal and look forward to being of service to you on this project. Very truly yours, ASSOCIATED TESTING LABORATORIES, INC. Xxxxx X. Xxxxx, Ph.D., P.E. Director, Geotechnical Services Enclosures: Figure 1: Proposed Improvement Alignment Figure 2: Proposed Boring Location Itemized Geotechnical Fee Estimate Project ProposalEstimates – Xxxxxxxxxx Road NORTH Notes: W Sycamore Road Improvements Borings B-1 through B-5 are 15-ft. deep Total Depth = 75-ft Guidelines: Fort Bend County Project: Cartwright Pavement Replacement & Drainage Improvements, Fort Bend County, Texas Proposal No.: GP2020GP21-0710 Not to Scale 0417 FIGURE 1 Client: HJ Kavi Consulting, Inc. Sugar Land, Texas Proposed Improvement Alignment FIGURE 1 NORTH Notes: Borings B-1 through B-6 at 15-ft [90] Project Proposal: W Sycamore Road Improvements Fort Bend County, Texas Proposal No.: GP2020-0710 Scale: 1 inch : 300 ft Client: HJ Consulting, Inc. Sugar LandHouston, Texas Proposed Boring Location FIGURE 2 Plan Scale: 0 500 ft 1000 ft Geotechnical Investigation Proposal W Sycamore Road (From S. Post Oak to S Curve at Edgewood Trail) ATL Proposal NoCartwright Pavement Replacement & Drianage improvements Xxxx Xxxx Xxxxxx, Xxxxx XXX Xxxxxxxx Xx. GP2020XX0000-0710 August 190000 April 30, 2020 2021 ITEMIZED GEOECHNICAL GEOTECHNICAL FEE ESTIMATE Xxxxxxxxxx Pavement Replacement & Drianage improvements Borings: 6@15' (90 5@15', [75 LF) ] A. FIELD EXPLORATION Qty. Unit Unit Rate Amount Mobilization/Demobilization (Truck Rig) 1 LS $500.00 $500.00 Technician for Staking, Utilities Clearance, Coordination 8 4 hrs. $50.00 $400.00 200.00 Soil Drilling and Sampling (continuous; <50') 90 75 ft. $21.00 $1,890.00 1,575.00 Soil Drilling and Sampling (continuous; >50') 0 ft. $24.00 $0.00 Soil Drilling and Sampling (<50' intermittent) 0 ft. $18.00 $0.00 Soil Drilling and Sampling (intermittent; over 50' ) 0 ft. $21.00 $0.00 Grouting Holes 90 75 ft. $7.00 $630.00 525.00 Piezometer Installation 0 ft. $16.00 $0.00 Piezometer Abandonment 0 ft. $14.00 $0.00 24-Hour, 7- and 30-day PZ Water Level Readings 0 hrs. $50.00 $0.00 Vehicle Charge 8 0 hrs. $10.00 $80.00 0.00 Mobilization/Demobilization (ATVrig), Surcharge 0 LS $132.00 $0.00 Soil Drilling and Sampling (Surcharge for drilling using ATV rig) 0 ft. $6.00 $0.00 Pavement Coring and Patching (up to 6 inches thick) 6 5 ea. $150.00 90.00 $900.00 450.00 Pavement Coring and Patching (>6 inches thick) 36 6 in. $9.00 $324.00 54.00 $4,724.00 B. GEOTECHNICAL LABORATORY TESTING Qty. Unit Unit Rate Amount Moisture Content (ASTM D-2216) 48 ea. $9.00 $432.00 Atterberg Limits (ASTM D-4318) 18 ea. $60.00 $1,080.00 Passing No. 200 Sieve (ASTM D-1140) 18 ea. $46.00 $828.00 Unconfined Compression (ASTM D-2166) 6 ea. $44.00 $264.00 Unconsolidated-Undrained Triaxial Test (ASTM D-2850) 16 ea. $61.00 $976.00 SUBTOTAL $3,580.00 C. ANALYSES & REPORT PREPARATION Qty. Unit Unit Rate Amount Senior Engineer-Project Manager (P.E.) 4 hrs. $150.00 $600.00 Project Engineer (P.E.) 16 hrs. $105.00 $1,680.00 Civil Engineer 16 hrs. $83.00 $1,328.00 Draftsman 24 hrs. $60.00 $1,440.00 Word Processor 24 hrs. $60.00 $1,440.00 SUBTOTAL $6,488.003,304.00

Appears in 1 contract

Samples: Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!