Toe Wall Sample Clauses

Toe Wall. Toe Wall shall be provided as per the requirement of site conditions to restrict the right of way; however minimum 1400 m length shall be provided. Reinforced Earth Wall: Reinforced Earth Wall shall be provided as per the requirement of site conditions; however minimum 1780 m length shall be provided between Main carriageway and Slip Road/Ramp. Embankment Protection: High embankment slop protection shall be provided as per the requirement of the site as per manual, however minimum 9300.00 cum stone boulder pitching shall be provided in the embankment slop. Note:
AutoNDA by SimpleDocs
Toe Wall. Sr. No. Chainage (Km) Design Length ( Km TCS Code Remarks From To (1) (2) (3) (4) (5) (6) 1 1.750 1.800 0.050 TCS-4 One side 2 1.800 1.900 0.100 TCS-3 Both Sides 3 2.075 2.100 0.025 TCS-4 One side 4 4.200 4.275 0.075 TCS-3 Both Sides 5 4.350 4.425 0.075 TCS-4 One side 6 4.600 4.725 0.125 TCS-3 Both Sides 7 4.825 5.000 0.175 TCS-4 One side 8 5.075 5.175 0.100 TCS-4 One side 9 5.475 5.650 0.175 TCS-3 Both Sides 10 5.775 5.875 0.100 TCS-4 One side 11 6.600 6.825 0.225 TCS-4 One side 12 6.925 6.975 0.050 TCS-4 One side 13 7.225 7.250 0.025 TCS-4 One side 14 7.250 7.370 0.120 TCS-3 Both Sides 15 7.380 7.525 0.145 TCS-3 Both Sides 16 7.525 7.600 0.075 TCS-4 One side 17 7.700 7.800 0.100 TCS-4 One side 18 9.100 9.150 0.050 TCS-4 One side 19 9.200 9.250 0.050 TCS-4 One side 20 9.400 9.450 0.050 TCS-3 Both Sides 21 9.575 9.650 0.075 TCS-4 One side 22 10.600 10.790 0.190 TCS-4 One side 23 10.810 10.950 0.140 TCS-4 One side 24 11.225 11.325 0.100 TCS-4 One side 25 11.550 11.600 0.050 TCS-3 Both Sides 26 11.850 11.956 0.106 TCS-4 One side 27 11.970 12.325 0.355 TCS-4 One side 28 12.875 13.625 0.750 TCS-4 One side 29 15.800 15.828 0.028 TCS-4 One side 30 15.846 16.125 0.279 TCS-4 One side 31 16.125 16.275 0.150 TCS-4 One side 32 16.275 16.650 0.375 TCS-4 One side Sr. No. Chainage (Km) Design Length ( Km TCS Code Remarks From To (1) (2) (3) (4) (5) (6) 33 17.025 17.100 0.075 TCS-4 One side 34 17.275 17.325 0.050 TCS-4 One side 35 18.025 18.100 0.075 TCS-4 One side 36 18.150 18.225 0.075 TCS-4 One side 37 18.225 18.250 0.025 TCS-3 Both Sides 38 18.280 18.450 0.170 TCS-3 Both Sides 39 19.750 19.795 0.045 TCS-4 One side 40 19.805 20.075 0.270 TCS-4 One side 41 20.600 20.675 0.075 TCS-4 One side 42 20.675 20.800 0.125 TCS-4 One side 43 20.800 20.850 0.050 TCS-4 One side 44 20.975 21.200 0.225 TCS-4 One side Total Length in Km. = 5.748

Related to Toe Wall

  • Apprentice Wages (a) Apprentices’ rates of pay are set out in Appendix B which includes the description of the calculations.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Apprentice Employment and

  • APPRENTICES 6.36.1 The Contractor acknowledges and agrees that, if this Contract involves a dollar amount greater than or a number of working days greater than that specified in Labor Code Section 1777.5, this Contract is governed by the provisions of Labor Code Section 1777.5. It shall be the responsibility of the Contractor to ensure compliance with this Article and with Labor Code Section 1777.5 for all apprenticeable occupations.

  • Outputs 8. The objectives and outcomes of this Agreement will be achieved through a range of outputs. The outputs include the:

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.