Traffic Warrant Studies. The Engineer shall prepare a traffic signal warrant study to support their recommendation for the continuous activation of an existing traffic signal or a proposed traffic signal based on projected volumes. Each warrant study must include addressing pedestrian signals along with obtaining both traffic and pedestrian counts.
Traffic Warrant Studies. The Engineer shall prepare a traffic signal warrant study to support their recommendation for the continuous activation of an existing traffic signal or a proposed traffic signal based on projected volumes. Each warrant study shall include addressing pedestrian signals along with obtaining both traffic and pedestrian counts. The Engineer shall implement each proposed traffic signal improvement within existing State right-of- way unless otherwise approved by the State. The Engineer shall refer to latest version of the TMUTCD, Traffic Signal Manual, and The State’s roadway (ramp) and traffic standards for work performed for either temporary or permanent traffic signals. The Engineer shall develop and include a timing plan for each signal improvement.
Traffic Warrant Studies. The Engineer shall prepare a traffic signal warrant study to support their recommendation for the continuous activation of an existing traffic signal or a proposed traffic signal based on projected volumes. Each warrant study must include addressing pedestrian signals along with obtaining both traffic and pedestrian counts. The Engineer shall implement each proposed traffic signal improvement within existing State ROW unless otherwise approved by the State. The Engineer shall refer to latest version of the TMUTCD, Traffic Signal Manual, and The State’s roadway (ramp) and traffic standards for work performed for either temporary or DocuSign Envelope ID: E5C545DF-C1AD-42AC-935A-16774D35D2E6 Contract No. 18-7SDP5012 permanent traffic signals. The Engineer shall develop and include a timing plan for each signal improvement.
Traffic Warrant Studies. (OMITTED)
Traffic Warrant Studies. A. Prepare Traffic Signal Warrant for Xxx 00 and 27th St 4 1 24 16 48 4 97 $13,172.00
Traffic Warrant Studies. Prepare a traffic signal warrant study as required to support the recommendation for the continuous activation of an existing traffic signal or a proposed traffic signal based on projected volumes. Each warrant study must include addressing pedestrian signals along with obtaining both traffic and pedestrian counts. Implement each proposed traffic signal improvement within existing TxDOT ROW unless otherwise approved by the City/TxDOT. Refer to latest version of the TMUTCD, Traffic Signal Manual, and TxDOT’s roadway (ramp) and traffic standards for work performed for either temporary or permanent traffic signals. Develop and include a timing plan for each signal improvement.
Traffic Warrant Studies. The Engineer shall prepare a traffic signal warrant study to support their recommendation for the continuous activation of an existing traffic signal or a proposed traffic signal based on projected volumes. Each warrant study must include addressing pedestrian signals along with obtaining both traffic and pedestrian counts. Signal warrant studies will be prepared for FM 150/Veterans Drive and FM 150/Xxxxxxxx Street intersections only. The Engineer shall implement each proposed traffic signal improvement within existing Owner ROW unless otherwise approved by the Owner. The Engineer shall refer to latest version of the TMUTCD, Traffic Signal Manual, and the Owner and TxDOT’s roadway and traffic standards for work performed for either temporary or permanent traffic signals. The Engineer shall develop and include a timing plan for each signal improvement.
Traffic Warrant Studies. The Engineer shall prepare a traffic signal warrant study to support their recommendation for the continuous activation of an existing traffic signal or a proposed traffic signal based on projected volumes. Each warrant study must include addressing pedestrian signals along with obtaining both traffic and pedestrian counts. Traffic Warrant Studies shall be prepared at the following intersections: IH 35 at Xxxxxx Road IH 35 at FM 3163 IH 35 at Xxxxxx Road IH 35 at 0xx Xxxxxx IH 35 at FM 455 IH 35 at Xxxx Road IH 35 at Xxxx Road IH 35 at View Road IH 35 at Xxxxxx Road IH 35 at FM 3002 The Engineer shall implement each proposed traffic signal improvement within existing State ROW unless otherwise approved by the State. The Engineer shall refer to latest version of the TMUTCD, Traffic Signal Manual, and The State’s roadway (ramp) and traffic standards for work performed for either temporary or permanent traffic signals. The Engineer shall develop and include a timing plan for each signal improvement. DocuSign Envelope ID: F73B45F8-2E49-4FF9-B4C5-FBEDC0E23D7C Contract No. 18-7SDP5012 SA No. 1 PeopleSoft Contract No. 6855
Traffic Warrant Studies. The Engineer shall prepare a traffic signal warrant study to support their recommendation for the continuous activation of an existing traffic signal or a proposed traffic signal based on projected volumes. Each warrant study must include addressing pedestrian signals along with obtaining both traffic and pedestrian counts. Warrant locations to be determined (up to four (4) studies). The Engineer shall design each proposed traffic signal improvement as warranted within existing State ROW unless otherwise approved by the State. The Engineer shall refer to latest version of the TMUTCD, Traffic Signal Manual, and The State’s roadway (ramp) and traffic standards for work performed for either temporary or permanent traffic signals. The Engineer shall develop and include a timing plan for each signal improvement.
Traffic Warrant Studies. The Engineer shall prepare a traffic signal warrant study to support their recommendation for the continuous activation of an existing traffic signal or a proposed traffic signal based on projected volumes. Each warrant study must include addressing pedestrian signals along with obtaining both traffic and pedestrian counts. Warrant studies will be performed for 15 intersections along the corridor. The Engineer shall implement each proposed traffic signal improvement within existing State ROW unless otherwise approved by the State. The Engineer shall refer to latest version of the TMUTCD, Traffic Signal Manual, and The State’s roadway (ramp) and DocuSign Envelope ID: 798F7E2C-0AE6-40EE-BFB4-3AB848988972 traffic standards for work performed for either temporary or permanent traffic signals. The Engineer shall develop and include a timing plan for each signal improvement.