Two Tower Concept Sample Clauses

Two Tower Concept. The development proposal is for two residential buildings with a total of 72 apartment units. These buildings will sit on a two storey podium that accommodates two levels of indoor parking (116 spaces) and commercial space (17,450 sf) on both levels, fronting Windmill Road. In addition to the indoor parking, there will be 46 on-site exterior parking spaces. (22 on site, 24 utilizing the NSPC easement) The podium provides a transition between the commercial/light industrial uses on Windmill road and the residential uses behind, and up the hill from, the proposed development. The design provides at grade commercial space and two residential entrances on Windmill Road. While the lower residential units are at grade with the neighboring apartment building on Fernhill Drive. This project will serve to strengthen both the commercial nature of Windmill Road while providing a buffer between the street and the residential neighborhood. Special attention has been given to the separation of the two proposed residential buildings to;  reduce the potential disruption of prevailing winds by the building  reduce the building mass, maximize views from the building and enhanced identity  minimize the impact on views across the site from the neighboring houses and apartment buildings
AutoNDA by SimpleDocs

Related to Two Tower Concept

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Interconnection Product Options Interconnection Customer has selected the following (checked) type of Interconnection Service:

  • If there is a permitted secondary offering (1) If the Issuer is an emerging issuer and you have sold in a permitted secondary offering 10% or more of your escrow securities, your escrow securities will be released as follows: For delivery to complete the IPO All escrow securities sold by you in the permitted secondary offering 6 months after the listing date 1/6 of your remaining escrow securities 12 months after the listing date 1/5 of your remaining escrow securities 18 months after the listing date 1/4 of your remaining escrow securities 24 months after the listing date 1/3 of your remaining escrow securities 30 months after the listing date 1/2 of your remaining escrow securities 36 months after the listing date your remaining escrow securities *In the simplest case, where there are no changes to the remaining escrow securities upon completion of the permitted secondary offering and no additional escrow securities, the release schedule outlined above results in the remaining escrow securities being released in equal tranches of 16 2/3%.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Creative Commons Attribution-Non-Commercial-NoDerivs License The Creative Commons Attribution Non-Commercial-NoDerivs License (CC-BY-NC-ND) permits use, distribution and reproduction in any medium, provided the original work is properly cited, is not used for commercial purposes and no modifications or adaptations are made. (see below) Use by commercial "for-profit" organizations Use of Wiley Open Access articles for commercial, promotional, or marketing purposes requires further explicit permission from Wiley and will be subject to a fee. Further details can be found on Wiley Online Library xxxx://xxxxxxx.xxxxx.xxx/WileyCDA/Section/id-410895.html Other Terms and Conditions:

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Ownership Title to Project Deliverables This clause shall apply where Contractor is commissioned by the Authorized User to furnish project deliverables as detailed in the Purchase Order.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Loop Provisioning Involving IDLC 2.16.1 Where TWTC has requested an Unbundled Loop and AT&T uses IDLC systems to provide the local service to the customer and AT&T has a suitable alternate facility available, AT&T will make such alternative facilities available to TWTC. If a suitable alternative facility is not available, then to the extent it is technically feasible, AT&T will implement one of the following alternative arrangements for TWTC (e.g., hairpinning):

Time is Money Join Law Insider Premium to draft better contracts faster.