UNCOVERING OF WORK 13.1.1 If any portion of the Work should be covered contrary to the request of the Architect or to requirements specifically expressed in the Contract Documents, it must, if required in writing by the Architect, be uncovered for his or her observation and shall be replaced at the Contractor's expense. 13.1.2 If any other portion of the Work has been covered which the Architect has not specifically requested to observe prior to being covered, the Architect may request to see such Work and it shall be uncovered by the Contractor. If such Work is found in accordance with the Contract Documents, the cost of uncovering and replacement shall, by appropriate Change Order, be charged to the State. If such Work is found not to be in accordance with the Contract Documents, the Contractor shall pay such costs unless it is found that this condition was caused by the State or a separate contractor as provided in Article 6 of these General Conditions, in which event the State shall be responsible for the payment of such costs.
Uncovering and Correction of Work 12.1 The Contractor shall promptly correct Work rejected by the Owner or failing to conform to the requirements of the Contract Documents, whether observed before or after Substantial Completion and whether or not fabricated, installed or completed, and shall correct any Work found to be not in accordance with the requirements of the Contract Documents within a period of two years from the date of Substantial Completion, or by terms of an applicable special warranty required by the Contract Documents. The provisions of this Article apply to work done by Subcontractors as well as to Work done by direct employees of the Contractor. 12.2 At any time during the progress of the work, or in any case where the nature of the defects shall be such that it is not expedient to have them corrected, the Owner, at their option, shall have the right to deduct such sum, or sums, of money from the amount of the contract as they consider justified to adjust the difference in value between the defective work and that required under contract including any damage to the structure.
System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.
CUTTING AND PATCHING OF WORK 4.14.1 The Contractor shall be responsible for all cutting, fitting or patching that may be required to complete the Work or to make its several parts fit together properly. 4.14.2 The Contractor shall not damage or endanger any portion of the Work or the work of the State or any separate contractors by cutting, patching or otherwise altering any work, or by excavation. The Contractor shall not cut or otherwise alter the work of the State or any separate contractor except with the written consent of the State and of such separate contractor. The Contractor shall not unreasonably withhold from the State or any separate contractor his consent to cutting or otherwise altering the Work.
Examination of work before covering up In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.
Downtime There may be downtime during the Migration. The duration of the downtime will depend on the amount of data that Agency is migrating. Axon will work with Agency to minimize any downtime. Any VIEVU mobile application will need to be disabled upon Migration.
Scope of Work For the 2022/2023 Grant Period, the Provider will maintain a victim services program that will be available to provide direct services to victims of crime who are identified by the Provider or are presented to the Provider, as specified in the Provider’s 2022/2023 Grant Application as approved by the OAG and incorporated herein by reference.
REDUCTION IN WORK FORCE (1) In the event of a reduction in the work force, regular full-time and regular part-time employees shall be laid off in reverse order of seniority, provided that there are available employees with greater seniority who are qualified and have the ability to do the work of the employees laid off. The Employer shall give regular employees written notice of layoff or normal pay for that period in lieu of notice as follows: i) One (1) weeks’ notice after three (3) consecutive months of employment, ii) Two (2) weeks’ notice after twelve (12) consecutive months of employment, iii) Three (3) weeks’ notice after three (3) consecutive years, plus one additional week for each additional year of employment to a maximum of eight (8) weeks. iv) Employees shall be entitled to Group Termination notice/pay pursuant to Section 64 of the Employment Standards Act. (2) Laid-off regular employees shall retain their seniority and perquisites accumulated up to the time of layoff, for a period of one (1) year and shall be rehired, if the employee possesses the capability of performing the duties of the vacant job on the basis of the posting procedure. If a laid-off employee is not recalled to work within twelve (12) calendar months of layoff, such employee may be terminated by written notification at the expiration of the twelve (12) calendar month period. Laid-off employees failing to report for work of an ongoing nature within seven (7) days of the date of receipt of notification by registered mail shall be considered to have abandoned their right to employment. Employees required to give two (2) weeks' notice to another Employer shall be deemed to be in compliance with the seven (7) day provision. (3) Where a notice of displacement or layoff actually results in a layoff and prior to the layoff becoming effective, two (2) copies of such notice shall be sent to the Secretary-Treasurer of the Local.
THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.
Scheduling of Work Subcontractor shall provide Contractor with scheduling information and a proposed schedule for performance of the Subcontract Work consistent with the Progress Schedule and in a form acceptable to Contractor. Subcontractor shall comply with the Progress Schedule including, but not specifically limited to, commencement, duration, and sequencing of activities. Contractor shall reasonably cooperate with the Subcontractor in scheduling the Subcontract Work and shall attempt, as reasonably possible, to avoid conflicts or interference with the Subcontract Work.