Unit Tests Sample Clauses

Unit Tests. ‌ Unit tests are available in the folder /tests/xxx_<xx>.cpp Each test shall be added in the CMake- File.txt in the module under tests. In addition the option -DENABLE_TESTS=ON shall be passed to the cmake to activate tests creation.
AutoNDA by SimpleDocs
Unit Tests. Each teacher will construct an end of the unit test for all units presented. These assessments will only cover the material presented in the current unit. There may be several unit tests given during a trimester, depending on the length of the constructed units.
Unit Tests. To avoid problems of message data exchange a large set of stand-alone unit tests for the RTCM modules were developed. These cover data field consistency, message content, CRC computation and binary consistency checks.

Related to Unit Tests

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • Health Tests At the time of employment, the Employer shall provide a Tuberculin skin test at no cost to the nurse. In the event of a positive reaction to this test, the Employer will provide a chest x-ray at no cost. Upon request, a routine blood examination and urinalysis will be provided at no cost to the nurse once each year.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

Time is Money Join Law Insider Premium to draft better contracts faster.