Unstable Subgrade. Where the bottom of any excavation as uncovered is soft, and in the Engineer's opinion unfit to support the pipes or structures, a further depth shall be excavated and refilled as directed by the Engineer. All costs of additional excavation and backfilling up to the original trench bottom will be paid for in accordance with Sections GC10 and/or GC17 of the General Conditions, provided the conditions are not the result of the Contractor's failure to adequately control water in the excavation.
AutoNDA by SimpleDocs
Unstable Subgrade. A. Where the bottom of the trench at subgrade is found to be unstable or to include ashes, cinders, any type of refuse, vegetable or other organic material, or large pieces of fragments of inorganic material which, in the opinion of the ENGINEER, should be removed, the CONTRACTOR shall excavate and remove such unsuitable material to the width and depth recommended by the ENGINEER. Before pipe is laid, the subgrade shall be made by backfilling with Class 1 or Class 1S material in 6 inch uncompacted layers, thoroughly tamped and the bedding prepared as herein before specified.

Related to Unstable Subgrade

  • Subgrade Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.

  • LIS Entrance Facilities 7.3.1.1.1 Recurring and nonrecurring rates for LIS Entrance Facilities are specified in Exhibit A and will apply for those DS1 or DS3 facilities dedicated to use as LIS.

  • Physical Facilities The parties acknowledge the importance of RMOs having quality facilities to enable RMOs an opportunity to rest, discuss clinical matters with other RMOs, and to study. The DHBs acknowledge the importance of private RMO rooms and accept they need to be appropriate for the circumstances. Ideally RMO facilities should be of an appropriate size, secure and have the following: • Kitchen facilities and lounge area, with natural light where possible. • Sufficient number of telephone lines to enable appropriate clinical response by RMOs to pagers and clinical duties. • A study area including sufficient desk space and adequate lighting to enable reading. • Good IT facilities including: inter and intranet access. • Access to relevant clinical material such as lab and x-ray results, up to date etc. • Access and ability to print. • Lockers if secure facilities are not provided elsewhere closer to work spaces. • Sufficient beds for those on nights. • Changing, toilet and shower facilities. • The room(s) and associated facilities should be located close to the hospital’s acute area(s) and serviced regularly with linen supplied. • Where space is available, safe and secure parking close to the main entrance of the hospital for RMOs undertaking work during the hours of darkness. Where space is not available the DHB must make appropriate alternative arrangements such as the provision of taxis. This clause does not require DHBs to retrofit existing facilities to meet such requirements; however DHBs must consider the above requirements when undertaking refurbishment work and when building new hospitals/facilities. Best endeavours should be applied to provide the above within existing facilities in the absence of rebuilding.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Toilet Facilities The Employer provides the Contractor access to toilet facilities. Temporary chemical toilets are provided by the Contractor where deemed necessary.

  • Entrance Facilities 7.3.1.1.1 Recurring and nonrecurring rates for Entrance Facilities are specified in Exhibit A and will apply for those DS1 or DS3 facilities dedicated to use by LIS.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • DAMAGE TO COUNTY FACILITIES, BUILDINGS OR GROUNDS 8.16.1 The Contractor shall repair, or cause to be repaired, at its own cost, any and all damage to County facilities, buildings, or grounds caused by the Contractor or employees or agents of the Contractor. Such repairs shall be made immediately after the Contractor has become aware of such damage, but in no event later than thirty (30) days after the occurrence.

  • Alternate Facilities If under Purchaser’s Operating Schedule, roads needed for the removal of Included Timber differ substantially from Specified Roads, other roads may be added to A7. Contracting Officer shall assure that road routing, location, design, and needed easements will make such other roads acceptable as parts of the National Forest transportation facilities. Purchaser shall provide survey, design, and construction staking for such other roads. Based on design quantities from such engineering, Forest Service shall estimate Specified Road construction costs of alternate facilities, using methods consistent with those used in the original computation of the Schedule of Items. If Specified Road construction costs for acceptable alternate facilities are less than the estimated costs of facilities listed in the original Schedule of Items that Purchaser does not construct, Timber Sale Account shall be adjusted by Forest Service to reflect the reduction in costs. In event of rate redetermination under B3.3, such allowed costs shall be the redetermined estimated costs of facilities listed in the original Schedule of Items that Purchaser does not construct.

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!