Urban Water Supply Sample Clauses

Urban Water Supply. (a) Financing technical assistance providers in the area of financial management and business planning, to enable the implementation of commercial oriented reforms in GVWC.
AutoNDA by SimpleDocs
Urban Water Supply. Construction of additional capacity to an existing new raw water pumping station at Shitoukoumen Reservoir, a water transmission pipeline from Shitoukoumen to Fangniugou, a booster pumping station at Fangniugou, a water transmission pipeline to Water Treatment Plant No. 1 in Changchun, an intake and raw water pumping station at Xinlicheng Reservoir, a third water treatment plant, a twin water transmission pipeline from Xinlicheng Reservoir to the third water treatment plant, a pumping station at Water Treatment Plant No. 1 and a booster pumping station at Zhengyang, and new and replacement water mains in the Changchun water distribution system.
Urban Water Supply. Financing technical assistance providers in the area of financial management and business planning, to enable the implementation of commercial oriented reforms in GVWC. Carrying out funding for emergency works in the Eastern parts of Freetown and meters installation to improve the cost recovery of the service delivery to low-income communities; and Provision of training on, inter alia, utility operation, information technology, monitoring, and, urgently needed equipment for GVWC. * * * The Project is expected to be completed by September 30, 2009. SCHEDULE 3

Related to Urban Water Supply

  • Water Supply The system may or may not meet state and local requirements. It is the right and responsibility of Buyer to determine the compliance of the system with state and local requirements. [For additional information on this subject, request the “Water Supply and Waste Disposal Notification” form.]

  • Power Supply The source of power for the VAS shall either be the vehicle battery or a rechargeable battery. Where provided, an additional rechargeable or non-rechargeable battery may be used. These batteries shall by no means supply energy to other parts of the vehicle electrical system.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • OVATIONS FOOD SERVICES, L.P. dba SPECTRA All food and beverage service must be discussed with and approved by Spectra, the OCFEC Master Concessionaire. FORM F-31 AGREEMENT NO. R-026-18 DATE May 16, 2018 REVIEWED APPROVED RENTAL AGREEMENT FAIRTIME INTERIM XX THIS AGREEMENT by and between the 32nd District Agricultural Association dba OC Fair & Event Center, hereinafter called the Association, and B & L Productions, Inc. hereinafter, called the Rentor

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Sub-Loop In locations where SBC-AMERITECH has deployed: (1) Digital Loop Carrier systems and an uninterrupted copper loop is replaced with a fiber segment or shared copper in the distribution section of the loop; (2) Digital Added Main Line (“DAML”) technology to derive multiple voice-grade POTS circuits from a single copper pair; or (3) entirely fiber optic facilities to the end user, SBC-AMERITECH will make the following options available to CLEC:

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Copper Subloops Sprint will make available access to copper subloops on an unbundled basis. A copper subloop is a portion of a Copper Loop, or Hybrid Loop, and is comprised entirely of copper wire or copper cable that acts as a transmission facility between any accessible terminal in Sprint’s outside plant, including inside wire owned or controlled by Sprint, and the end-user customer premises. A copper subloop can also include intermediate devices, such as repeaters, used to establish the transmission path. Copper subloops can be used by CLEC to provide voice-grade services as well as digital subscriber line services. Access to copper subloops is subject to the collocation provisions of this Agreement. Copper subloop consists of the distribution portion of the copper loop. Sprint is not obligated to offer feeder loop plant as a stand-alone UNE.

  • Environmental Services 1. Preparation of Environmental Documentation (CEQA/NEPA) including but not limited to the following:

Time is Money Join Law Insider Premium to draft better contracts faster.