Variances from Forest Management Plan (FMP Sample Clauses

Variances from Forest Management Plan (FMP. This operating plan is aligned with the 2018-2038 (FMP) for the PA TSA which came into effect on April 1, 2018 and has been amended twice since, effective April 1, 2020 and June 8, 2021. Operating plan variances from approved FMP strategies and commitments are monitored, reported on in FMP Annual Reports and reviewed annually by an FMP Management Implementation Team (MIT). 1. Proposed blocks occurring outside of tactical plan areas (FMP Indicator 15) When the FMP was amended to adapt to the final woodland caribou range plan for the SK2 Central range, some decade two areas were shifted into decade one to recognize the loss of some decade one areas resulting from expanded harvest deferral areas in the new Caribou Habitat Management Zones. The revised version of the tactical plan (v2) was used for this variance analysis. This indicator is tracked annually and assessed on a five-year cycle. As of March 31, 2020, only 2.7% has been harvested outside the tactical plan so it is expected that the target will be met at the 5 - year cycle. There are 13,407 ha in 2024-25 operating plan blocks that fall outside of the FMP tactical plan area boundaries with 2X the expected harvest volume included in the plan (44%), and roughly 6,703 ha at 1X harvest volume (22%). Blocks and areas outside the tactical plan are listed in Appendix A. It is not expected that that this will result in a variance to the plan due to the fact the plan includes 2.2 times the HVS. Two factors that contribute to this are: 1) Due to wildfires, blocks (some outside of tactical plan) were added to the Operating Plan to replace some of the timber burned. This timber is of similar age/quality to that which burned. 2) In the creation of the events for the 2024/2025 submission, there were some blocks added to these events that may have been outside of the tactical plan. Initially, the tactical plan was created as a large overview of the harvest plans on a broad scale. Subsequently, for the event creation, an operational view and fine-tuned process was utilized. Therefore, some blocks have been added which were outside of the tactical plan, creating a plan which is operationally sound. Sakâw will continue to monitor the area outside of the tactical plan and report at the FMP MIT meetings. 2. Deviations from the FMP approved utilization standard being requested in operating plan.
AutoNDA by SimpleDocs

Related to Variances from Forest Management Plan (FMP

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Project Management Plan Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan and

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • International Olympic Committee; International Red Cross and Red Crescent Movement As instructed from time to time by ICANN, the names (including their IDN variants, where applicable) relating to the International Olympic Committee, International Red Cross and Red Crescent Movement listed at xxxx://xxx.xxxxx.xxx/en/resources/registries/reserved shall be withheld from registration or allocated to Registry Operator at the second level within the TLD. Additional International Olympic Committee, International Red Cross and Red Crescent Movement names (including their IDN variants) may be added to the list upon ten (10) calendar days notice from ICANN to Registry Operator. Such names may not be activated in the DNS, and may not be released for registration to any person or entity other than Registry Operator. Upon conclusion of Registry Operator’s designation as operator of the registry for the TLD, all such names withheld from registration or allocated to Registry Operator shall be transferred as specified by ICANN. Registry Operator may self-­‐allocate and renew such names without use of an ICANN accredited registrar, which will not be considered Transactions for purposes of Section 6.1 of the Agreement.

  • Staffing Plan The Board and the Association agree that optimum class size is an important aspect of the effective educational program. The Polk County School Staffing Plan shall be constructed each year according to the procedures set forth in Board Policy and, upon adoption, shall become Board Policy.

  • Financial Services Compensation Scheme We are a participant in the Financial Services Compensation Scheme (the “FSCS”). As a retail client you may be eligible to claim compensation from the FSCS in certain circumstances if we, any approved bank, our nominee company or eligible custodian are in default. Most types of investment business are covered in full for the first £85,000 of any eligible claim. Not every investor is eligible to claim under this scheme: for further information please contact us, or the FSCS directly at xxx.xxxx.xxx.xx.

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (xxxxx://xxxxx.xxx.xxxxx.xx.xx/tpasscmblsearch/index.jsp) or by contacting

  • Required Procurement Procedures for Obtaining Goods and Services The Grantee shall provide maximum open competition when procuring goods and services related to the grant- assisted project in accordance with Section 287.057, Florida Statutes.

  • Emergency Mode Operation Plan Contractor must establish a documented plan to enable continuation of critical business processes and protection of the security of electronic County PHI or PI in the event of an emergency. Emergency means any circumstance or situation that causes normal computer operations to become unavailable for use in performing the work required under this Agreement for more than twenty-four (24) hours.

  • Performance Improvement Plan timely and accurate completion of key actions due within the reporting period 100 percent The Supplier will design and develop an improvement plan and agree milestones and deliverables with the Authority 3.2 The Authority may from time to time make changes to the KPIs measured as set out in paragraph 3.1 above and shall issue a replacement version to the Supplier. The Authority shall give notice In Writing of any such change to the KPIs measured and shall specify the date from which the replacement KPIs must be used for future reports. Such date shall be at least thirty (30) calendar days following the date of the notice to the Supplier.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!