Vertical Risers. All Risers, including those providing 120/240 volt power for Licensee’s equipment Enclosure, shall be placed on the quarter faces of the Pole and must be installed in conduit with xxxxxxxxxxx attached to the pole with stand- off brackets. A two (2) inch clearance in any direction from cable, bolts, clamps, metal supports and other equipment shall be maintained. (See Drawings A-02 and A-05.) Appendix D—Specifications for Licensee’s Attachments to District Poles
Vertical Risers. Unless otherwise directed by the District, all Risers shall be placed on existing stand-off brackets or in the absence of stand-off brackets the riser shall be placed on the field-face quarter section of the Pole. All risers must be installed in conduit attached to the Pole with stand-off brackets. A two (2) inch clearance in any direction from cable, bolts, clamps, metal supports and other equipment shall be maintained. (See Drawing A-02.)
Vertical Risers. All risers, including those providing 120/240 volt power for Licensee's equipment enclosure, shall be placed on the quarter faces of the pole and must be installed in U- guard. A two- (2) inch clearance in any direction from cable, bolts, clamps, metal supports, and other equipment shall be maintained.
Vertical Risers. All risers, including those for power feed for equipment enclosure, shall be placed on the quarter face of the pole and must be installed in conduit with Weather-head attached to the pole. A two-inch (2”) clearance in any direction from cable, bolts, clamps, and other equipment shall be maintained.
Vertical Risers. All Risers, including those for power feed for equipment enclosure, shall be placed on the quarter faces of the pole and must be installed in conduit with xxxxxxxxxxx attached to the pole. A two-inch (2”) clearance in any direction from cable, bolts clamps, metal supports and other equipment shall be maintained.