Warning and Activation Test with a Bicycle Target Sample Clauses

Warning and Activation Test with a Bicycle Target. 6.8.1. The subject vehicle shall approach the impact point with the bicycle target in a straight line for at least two seconds prior to the functional part of the test with a subject vehicle to impact point centreline offset of not more than [0.5]m. The bicycle target shall travel in a straight line perpendicular to the subject vehicle’s direction of travel at a speed defined in Table V, Column G of Annex 3. The bicycle target’s positioning shall be coordinated with the subject vehicle in such a way that the impact point of the bicycle target on the subject vehicle is the centreline of the subject vehicle if the subject vehicle remains at the prescribed test speed throughout the functional part of the test and does not brake. The functional part of the test shall start when the subject vehicle is travelling at a constant speed between 10km/h and [50]km/h as defined in Table V, Column B of Annex 3 and is at a distance of at least 50m from the target. From the start of the functional part until the subject vehicle has avoided the collision or the subject vehicle has passed the impact point with the bicycle target there shall be no adjustment to any control of the subject vehicle by the driver other than slight adjustments to the steering control to counteract any drifting. 6.8.2. The timing for the collision warning modes referred to in Paragraph 5.5.1. above shall comply with the following: 6.8.2.1. At least an optical warning and either an acoustic or haptic warning shall be provided no later than [XX] sec. before the start of emergency braking phase specified in Table V, Column C of Annex 3.
AutoNDA by SimpleDocs
Warning and Activation Test with a Bicycle Target. 6.7.1. The subject vehicle shall approach the impact point with the bicycle target in a straight line for at least two seconds prior to the functional part of the test with an anticipated subject vehicle to crankshaft of the bicycle impact point centreline offset of not more than 0.1 m. The functional part of the test shall start when the subject vehicle is travelling at a constant speed and is at a distance corresponding to a TTC of at least 4 seconds from the collision point. The bicycle target shall travel in a straight line perpendicular to the subject vehicle’s direction of travel at a constant speed of 15 km/h +0/-1 km/h, starting not before the functional part of the test has started. During the acceleration phase of the bicycle prior to the functional part of the test the bicycle target shall be obstructed. The bicycle target’s positioning shall be coordinated with the subject vehicle in such a way that the impact point of the bicycle target on the front of the subject vehicle is on the longitudinal centreline of the subject vehicle, with a tolerance of not more than 0.1 m, if the subject vehicle would remain at the prescribed test speed throughout the functional part of the test and does not brake.

Related to Warning and Activation Test with a Bicycle Target

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards. 2. Grantee agrees to cooperate fully and provide the System Agency and its representatives timely access to Products, records, and other items and information needed to conduct such review, evaluation, testing, and monitoring.

  • Minimum Customer Support Requirements for TIPS Sales Vendor shall provide timely and commercially reasonable support for TIPS Sales or as agreed to in the applicable Supplemental Agreement.

  • Directory Assistance Service Updates 8.3.3.1 BellSouth shall update end user listings changes daily. These changes include: 8.3.3.1.1 New end user connections 3.3.1.2 End user disconnections

  • DRUG AND ALCOHOL TESTING Employees may be tested for drugs and/or alcohol pursuant to the provisions of the Employer's Drug and Alcohol Testing Policy which is attached hereto and made a part of this Agreement as if more fully set forth herein.

  • Clinical Data and Regulatory Compliance The preclinical tests and clinical trials, and other studies (collectively, “studies”) that are described in, or the results of which are referred to in, the Registration Statement or the Prospectus were and, if still pending, are being conducted in all material respects in accordance with the protocols, procedures and controls designed and approved for such studies and with standard medical and scientific research procedures; each description of the results of such studies is accurate and complete in all material respects and fairly presents the data derived from such studies, and the Company and its subsidiaries have no knowledge of any other studies the results of which are inconsistent with, or otherwise call into question, the results described or referred to in the Registration Statement or the Prospectus; the Company and its subsidiaries have made all such filings and obtained all such approvals as may be required by the Food and Drug Administration of the U.S. Department of Health and Human Services or any committee thereof or from any other U.S. or foreign government or drug or medical device regulatory agency, or health care facility Institutional Review Board (collectively, the “Regulatory Agencies”); neither the Company nor any of its subsidiaries has received any notice of, or correspondence from, any Regulatory Agency requiring the termination, suspension or modification of any clinical trials that are described or referred to in the Registration Statement or the Prospectus; and the Company and its subsidiaries have each operated and currently are in compliance in all material respects with all applicable rules, regulations and policies of the Regulatory Agencies.

  • Routing for Operator Services and Directory Assistance Traffic For a Verizon Telecommunications Service dial tone line purchased by CBB for resale pursuant to the Resale Attachment, upon request by CBB, Verizon will establish an arrangement that will permit CBB to route the CBB Customer’s calls for operator and directory assistance services to a provider of operator and directory assistance services selected by CBB. Verizon will provide this routing arrangement in accordance with, but only to the extent required by, Applicable Law. Verizon will provide this routing arrangement pursuant to an appropriate written request submitted by CBB and a mutually agreed-upon schedule. This routing arrangement will be implemented at CBB's expense, with charges determined on an individual case basis. In addition to charges for initially establishing the routing arrangement, CBB will be responsible for ongoing monthly and/or usage charges for the routing arrangement. CBB shall arrange, at its own expense, the trunking and other facilities required to transport traffic to CBB’s selected provider of operator and directory assistance services.

  • Orientation and In-Service Program The Hospital recognizes the need for a Hospital Orientation Program of such duration as it may deem appropriate taking into consideration the needs of the Hospital and the nurses involved.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Monitoring and Audit Seller shall provide information on available audit logs and reports relating to cyber and physical and security. Company may audit Seller's records to ensure Seller's compliance with the terms of this Section 1(b)(iii)G (Critical Infrastructure Protection) of this Attachment B (Facility Owned by Seller), provided that Company has provided reasonable notice to Seller and any such records of Seller's will be treated by Company as confidential.

  • Unbundled Network Terminating Wire (UNTW) 2.8.3.1 UNTW is unshielded twisted copper wiring that is used to extend circuits from an intra-building network cable terminal or from a building entrance terminal to an individual End User’s point of demarcation. It is the final portion of the Loop that in multi-subscriber configurations represents the point at which the network branches out to serve individual subscribers. 2.8.3.2 This element will be provided in MDUs and/or Multi-Tenants Units (MTUs) where either Party owns wiring all the way to the End User’s premises. Neither Party will provide this element in locations where the property owner provides its own wiring to the End User’s premises, where a third party owns the wiring to the End User’s premises.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!